Three-inspection system
Strictly implement the company's three inspection system, including subcontracting self-inspection, on-site management self-inspection, supervision and inspection, to ensure that every link is carefully inspected.
quality first
Quality first, everyone from management to front-line employees should put quality first. The project manager needs to play an exemplary role to ensure that the quality problems are thoroughly rectified, otherwise it is not allowed to enter the next process. At the same time, increase the punishment for subcontracting management and improve the overall execution.
Set a benchmark
To set a benchmark, we must first make a good example of all sub-divisional projects, including waterproofing, masonry and plastering. Through the example guidance, it provides a clear standard and reference for the subsequent construction.
process control
Strengthen process control: strictly control the materials, ensure the quality of the materials entering the site is qualified, and witness the sampling on site; Before the process construction, the quality and technical disclosure shall be made to managers and workers to improve the overall construction technical level; Measures should be taken immediately to rectify the common quality defects after the completion of the working procedure to ensure the engineering quality meets the requirements.