Fire engineering construction contract template1:_ _ _ _ _ (hereinafter referred to as Party A)
Contracting Party: (hereinafter referred to as Party B)
According to the relevant provisions of the Contract Law of People's Republic of China (PRC) and the Regulations on Construction and Installation Contracts, and in combination with the relevant provisions of Chongqing Municipality and the specific conditions of this project, the following terms are reached through friendly negotiation:
I. Overview of the Project:
(1) Project name: _ _ _ _ _ _ _ _ _ _ _ _
(2) Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(3) Project scale: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(4) Investment approval number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(5) Project content: fire protection system project of 1-7# building and fire protection ring network project outside the building.
(6) Scope of contract: automatic fire alarm and linkage system in the building, indoor fire hydrant system and automatic sprinkler system.
Two. Duration: The project starts from May of 12 to October 30th of 20 13/kloc-0, totally 260 days (9 months). The remaining projects will be constructed according to the overall construction schedule, and the construction period will be determined separately.
Third, the quality of engineering and related products.
The engineering equipment and quality provided by Party B meet the fire control acceptance standards. If the relevant equipment provided by Party B affects the construction period and acceptance delay, Party B shall bear all the losses caused to Party A thereby. ..
Four, the project contract price and contract form:
1. Contract method: contracting for work and materials.
2. Contract price: total project price: total material cost+(total material cost *42%) based on the actual amount of on-site installation.
(1) Material cost: the purchased materials shall be provided by Party B, and the unit price and quantity of the materials shall be signed by Party A..
(2) All expenses such as labor costs, machinery costs, management fees, transportation costs and profits. 42% should be added to the material cost, and no separate charge is allowed.
3. In this project, Party A requires Party B to issue a national tax invoice in full for the purchased materials, and the relevant company will issue a local tax invoice, and Party B will prepare a manual payroll.
Verb (abbreviation of verb) drawing
Party A shall provide Party B with a construction drawing seven days before commencement.
VI. On-site representatives
1. Representative of the construction unit of Party A:
Name: Title: Project Manager
2. Party B's field representative
Name and Title: Project Leader
If you need to change people, you need to inform the other party seven days in advance.
Seven. Party A's work
1. Provide the design data approved by the local fire department, and coordinate with Party B and the design unit to solve any changes in the construction process.
2. Provide water, electricity and communication lines needed for construction and connect them to the construction site.
3. Protect Party B's construction site equipment, lines and pipelines.
4. Provide a construction site with construction conditions.
5. Party B agrees to other work that Party A should do:
Eight. Party B's work
1. Pay a deposit of RMB 200,000.00 Yuan to Party A within 3 days after the signing of this contract as a deposit for performing the obligations under this contract, and return it to Party B without interest according to the completed project installation progress (RMB 30,000 Yuan per building).
2. Provide the project progress to Party A's representative, and report to Party A's representative and relevant departments in time in case of industrial accidents. Party B shall be responsible for industrial accidents below 5,000 yuan, and Party A shall be responsible for accidents above 5,000 yuan.
3. Carry out the construction according to the design drawings approved by the fire department and the Code for Fire Protection Design of Buildings and other relevant regulations.
4. In the process of construction, if it is found that the technical requirements are inconsistent with the actual situation on site, it should be raised to Party A, and Party A and the design unit should negotiate with the fire department to solve it.
5. If there is no force majeure, Party B shall complete the project within the time stipulated in the contract.
6. Party B is responsible for the finished product protection of the completed project. If there is any damage during this period, it should be repaired in time. The cost of product quality problems shall be borne by Party B, and the losses caused by Party A shall be borne by Party A. ..
7. After the completion of the project, Party A shall handle all the fire-fighting acceptance materials, apply to the fire department for acceptance, and obtain the fire-fighting acceptance certificate. Party A shall bear the cooperation and assistance of Party B and the acceptance expenses. ..
8. Other work agreed by Party A to be completed by Party B:
Nine, the construction organization
1. Commencement and delayed commencement
Party B shall start construction according to the commencement time agreed in the contract. If Party B fails to start construction on time, it shall submit the reasons and requirements for delaying construction to Party A in written form. The representative of Party A shall give a written reply to Party B within 48 hours after receiving the application for extension of commencement. Due to Party A's reasons, the project cannot be started as agreed in the contract. Party A shall notify Party B in writing to postpone the commencement time and postpone the construction period.
2. If the construction period is delayed due to the following reasons, the construction period will be postponed accordingly.
A) Party A cannot provide drawings and commencement conditions as stipulated in the contract;
B) Engineering quantity change and design change;
C) Shutdown caused by water cut, power cut and gas cut;
D) force majeure;
E) Delaying the construction period due to Party A's failure to meet the agreed obligations;
F) Other circumstances in which the time limit agreed by both parties is postponed:
3. Suspend the construction responsibility
A) If Party A's representative requests Party B to stop work due to the slow construction progress of other parties, that is, it is not due to Party B's reasons, Party A shall sign a stop work report and extend the construction period to compensate Party B for the stop work loss.
B) If the shutdown responsibility belongs to Party B, Party B shall bear and compensate Party A for the shutdown loss.
C) In the course of construction, if Party A needs to complete the project ahead of schedule, both parties shall negotiate and sign an early completion agreement as an integral part of the contract documents. The early completion agreement shall include the measures taken by Party B to ensure the quality and safety of the project, the conditions provided by Party A for the early completion and the additional contract price for the early completion.
D) Party B shall complete the project according to the completion date agreed in the terms of the contract or the extended construction period. In case of irresistible special circumstances, both parties shall negotiate separately.
X. Engineering quality and acceptance
1. The project quality shall meet the quality standards agreed in the agreement. The evaluation basis of quality standards is the national or industrial quality inspection evaluation standards. If the quality of the project fails to meet the agreed quality standards due to Party B's reasons, Party B shall bear all the expenses for breach of contract, such as the cost of reworking materials and manual installation.
2. If both parties dispute the quality of the project, it shall be appraised by an engineering quality inspection agency recognized by both parties, and the expenses and losses arising therefrom shall be borne by the responsible party.
3. Party B shall seriously abide by the requirements of standards, specifications and design drawings and the instructions issued by Party A's representative according to the contract, accept the inspection of Party A's representative and its appointed personnel at any time, and provide convenient conditions for the inspection.
4. The inspection by Party A's representative shall not affect the normal construction. If the normal construction is affected, the losses caused to Party B shall be borne by Party A, and the construction period shall be postponed accordingly.
5. Take cover engineering and intermediate acceptance
According to the relevant provisions of the state and this Municipality.
6. Whether Party A's representative accepts it or not, when Party B proposes to re-examine the concealed works, Party B shall peel or open holes as required, and repair them again after inspection.
7. In order to ensure the quality of the equipment and materials purchased by Party B, a certificate of approval and an inspection report must be attached, which shall be accepted by both parties when entering the site. People without documents are not allowed to enter the scene. If Party A has any objection, it shall re-inspect, and the expenses shall be borne by Party A. If the certificate is inconsistent with the inspection report, it shall be borne by Party B..
8. Within 24 hours after Party B's project is completed and qualified for debugging, Party A shall sign it, and Party A shall cooperate to handle the fire control acceptance formalities.
XI。 Basis and adjustment of project payment
1. Basis for determining the project cost: the material cost (including auxiliary materials) is based on the material price list signed and confirmed by both parties, and all expenses such as transportation, labor, machinery, management fees and profits are calculated as 42% of the total material price, and 42% of the material cost+material cost is the total project cost, excluding other expenses. Material list is the basis of project cost. If the quantity of materials increases or decreases, it shall be calculated according to the calculation method determined by both parties now.
2. The engineering cost caused by the engineering design change shall be regarded as a part of the project payment, and the contract price adjusted by the change and the additional contract price agreed in other terms shall be adjusted and paid at the same time with the project payment (progress payment).
Twelve. Completion and maintenance
1. The project completion acceptance standard is the current acceptance standard of the country and industry and the relevant agreements of Party A and Party B. ..
2. Party B shall provide Party A with the completion acceptance report and relevant materials within seven working days after the project meets the acceptance conditions, and Party A shall organize the acceptance within seven working days after receiving the materials provided by Party B and put forward the modification opinions. If Party A fails to organize the acceptance within the agreed date, or fails to propose amendments within three working days after acceptance, it shall be deemed that Party A has approved the completion acceptance report.
3. Completion settlement
After the project is completed, Party B shall prepare the completion settlement report within ten effective working days and submit it to Party A for review. Party A shall conduct the examination and approval within 20 effective working days, which shall be signed by both parties. After the fire department completes the acceptance, Party A will allocate the project settlement money to Party B. ..
4. Maintenance
1. After the project is completed, Party B shall guarantee it for one year. During this period, if there are any quality problems, Party B shall be responsible for replacing parts. If the parts are damaged due to improper operation or other man-made reasons, the expenses shall be borne by Party A and paid to Party B after the warranty period expires. 2. After the warranty period expires, the relevant warranty clauses will be terminated.
Thirteen, the project payment and settlement:
Party A shall pay the project price to Party B in the following ways:
1. 30% of the total contract price shall be paid in advance within ten days after the contract signing materials enter the site.
2. Pay 30% of the total contract cost within ten days after the project is completed.
3. Pay 20% of the total contract price within 30 days after the installation of the whole project (completed years ago).
4. After the project passes the preliminary inspection by Party A and relevant departments, Party A shall pay 65,438+05% of the total contract price within 6 months. The remaining 5% shall be paid to Party B within 30 days after the expiration of the warranty period as quality deposit.
5. After the project is accepted by Party A for one year, the contract will be terminated after the warranty period expires.
6. In the course of the project, Party A shall pay the corresponding project funds to Party B within ten effective working days after issuing a written notice on the additional project funds required by Party A. ..
Fourteen Dispute mediation
In case of any dispute during the execution of this contract, both parties shall try their best to solve it through negotiation. If negotiation fails, either party may arbitrate in an arbitration institution with jurisdiction or bring a lawsuit in court.
Fifteen. others
1. The annexes and supplementary contracts of this contract have the same legal effect as this contract.
2. This contract is made in duplicate, one for each party, with the same legal effect.
3. Matters not covered in this contract shall be negotiated separately by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model text 2 of fire engineering construction contract Party A: ID number: Tel:
Party B: ID number: Tel:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Fire Protection Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B reach an agreement on the fire protection project and sign this contract.
I. Overview of the Project
1, project name:
2. Project location:
3. Project content: automatic fire alarm system of fire fighting system (1)
4. Construction period: from year to year.
Second, the way of contracting: contracting for labor and materials.
Third, the project cost:
Fourth, the project quality and evaluation criteria
1. Quality requirements: the project is qualified and meets the fire protection design requirements.
2. Evaluation standard: It shall be implemented according to the current national and Gansu quality evaluation standards and construction technology acceptance specifications.
3, production safety must conform to the requirements of the national safety construction specification, to prevent accidents.
4. Materials and equipment brands must adopt qualified products, specifications, models, places of origin and quality grades recognized by the fire department, and meet the requirements of fire control, so as to ensure the engineering quality.
Verb (abbreviation of verb) payment terms
1. On the day of signing the contract, Party A shall pay the contract price to Party B..
2. After the project is completed, Party A shall pay the balance to Party B.
Responsibilities and obligations of both sides of intransitive verbs
1, Party A's responsibility
(1) Provide all expenses stipulated in the contract according to the contract payment method.
(2) Designate a special person to be responsible for the coordination of system engineering project construction, and provide Party B with a room for storing equipment, construction power supply and construction water free of charge.
(3) Responsible for the organization and acceptance of system engineering projects. (Party A's internal acceptance)
(4) Party A shall be responsible for the power supply at the equipment installation site, and confirm the coordination of lines, pipelines and other facilities.