For the builder, you must first master the daily work content, master the technical requirements and construction technology of daily construction, so as to better handle it in the field management and coordination. Do you have a summary of the work of municipal builders? The following is a summary of the work of municipal builders I collected for you. I hope you like it.
Summary of municipal builders' work 1
Time flies, and I have been working for another year unconsciously. I have been working as a builder in the engineering department, and I can independently and methodically complete the tasks assigned by the project department, so I get along well with the management of the department and win trust. Recalling the work of the builders this year is both busy and rewarding. Summarizing the experience and lessons in this year's work is conducive to better technical management in future work.
As a technician, my job orientation is to assist the technical director and constantly enrich myself. In participating in the construction project, while completing the subgrade construction and filling, he also assisted the technical director in preparing the construction scheme and technical disclosure, and was responsible for the guidance and collation of engineering technical data, conducted on-site quality inspection with colleagues, and assisted the safety officer in implementing, supervising and inspecting the safety work on the construction site.
_ _ Project In the process of engineering construction, I have always taken my work seriously with a positive attitude, and in order to successfully complete the task, I can do my duty in all the work. "Don't rush to make achievements, bury your head in work" is my work motto, reminding yourself not to aim too high, to be down-to-earth, to do more practical things, to test your knowledge in practice and to accumulate experience in the construction site.
The work on the construction site made me deeply understand that what I learned in school, what I learned by rote through norms and procedures, is far less memorable than the actual experience. A lot of knowledge can't be learned in books, and it is entirely based on my own experience. In the past year, I have been reading and studying more. When you meet something different from the book on the construction site, ask the technical director and superior leaders modestly in time. Although sometimes I can't get a theoretical explanation, it's a good experience.
When I first started working, I felt that the technical data work, measurement work and quality inspection work were relatively simple, but I actually learned a lot and always felt that I could. It is only when you actually operate that you find your own shortcomings, often with half the effort and lack of efficiency. Now that we have more practical operations, mastered methods and gained experience, we will be handy. For example, in measurement, it is important to do its key work well. Personally, the key work of measurement is to choose the measurement scheme and carry out retest to avoid human error.
In addition, taking the technical disclosure work as an example, it is not simply to write the disclosure, but to give it to the labor construction team for signature to complete the work. However, after the written disclosure is completed, the workers need to be tracked and inspected in the actual construction process. If it is found that the workers have not carried out the construction according to the technical disclosure or not completely, they should be patiently explained and guided to make the partial projects in place, avoid rework, and ensure the construction progress and project quality.
In engineering construction, safety is the main link that cannot be ignored. Based on several years' practical experience, this paper briefly talks about safety. The most important thing is to establish a sense of security. First of all, the managers of the project department must have a strong sense of safety and responsibility. Only when the managers of the project department truly realize the importance of safety can they do this job well. If the management of the project department is lucky enough to do this work, it will be a fatal hidden danger for the safe construction of the project. Therefore, the project manager must understand the safety work from the bottom of his heart and put it into practice.
For the labor service team, the first thing to do is to arrange a safety education and training after the workers enter the site, and at the same time make safety technical disclosure to the labor service construction team. These tasks will not be implemented until they are done. The management personnel of the project department should always check the safety work on the construction site, and strive to completely eliminate potential safety hazards in the bud. In terms of safety, special attention should be paid to the support of the frame and the safety facilities carried or worn by the workers themselves. Regularly supervise and check that workers must wear safety facilities before they are allowed to work on the construction site. In the process of erection of scaffolding, strict inspection must be carried out, and the construction team is required to set up facilities in strict accordance with the construction specifications or procedures to ensure that there are no potential safety hazards. Only after the acceptance of relevant departments can the next working procedure be carried out.
This year's engineering construction work has made my professional knowledge grow and deepen, and my work ability, including organization and coordination ability, management ability and contingency ability, has been greatly improved. More importantly, I have accumulated valuable work experience. The work performance in the past year has also been recognized by the leaders and colleagues of the project department.
In short, in my future work, I will meet new challenges with a hundred times enthusiasm, make progress and maturity in my study, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company. Contribute to the development of.
Summary of municipal construction workers II
In a blink of an eye, 20 years have passed and a new year has ushered in. This year, I worked as a builder in the project department of _ _ University, and worked as a builder and documenter in _ _. Make a brief summary of this year's work from the following points in the past year.
I. Site Construction and Safety
The success of an enterprise lies in safety, and the failure lies in accidents. Any accident is an irreparable loss to the enterprise, and it also causes irreparable pain to the family and individuals.
In the early stage of construction, I cooperated with the project manager and the company safety officer to do a good job in level 3 safety education. The road construction of Communication University is very different from the Lingshi Forest Bridge project. In the construction, teachers must teach students in accordance with their aptitude, and different types of work should be communicated separately, so that workers can really listen to their own voices. Make the site construction work more solid.
In this year's project construction process, we will actively face the problems and carry out accurate construction according to the drawings to ensure that there will be no slowdown and rework! Carefully investigate the potential hazards in each construction process. Communicate with the construction personnel on the construction site in time, arrange safety work according to the construction plan and ensure the smooth completion of the construction, and be diligent in your legs, hands and eyes.
During the construction period, I was very nervous every day. After 20 years of construction, there are no safety accidents all year round, and the nervous heart can finally be put down.
Second, information within the industry.
Read the compilation of construction organization design carefully, study and be familiar with the drawings in detail in advance, and get to know the whole construction process and various matters needing attention in your mind. Before the construction preparation, the preparation of the construction scheme should be close to the reality, and all kinds of information and engineering quantity confirmation information formed in the construction process should be signed and confirmed by the supervision engineer in time, so as not to affect the later measurement.
This year is the first time in my career that I participated in the construction of municipal roads in the construction of university roads. At first, I was a little confused. In the early stage, I carefully read the preparatory work such as the municipal road specification materials. To solve the problems and difficulties encountered in the work.
The builder's work is also very hard. During the day, he will run around the construction site, supervise the construction progress, and review the construction according to the drawings to avoid mistakes. In the evening, he has to sort out the drawings of the day and arrange the work for the next day. At work, I always finish it on the same day and never put it off until the next day. Ensure that when the follow-up work is implemented, there is no hurry, no shortage of east and west, and the construction period will not be affected.
Third, study.
In the busy work, I still insisted on studying, and in 20__ _, I took the second-class constructor exam. After work, I also read and learn some construction specifications.
Four. Main experience and gains
After a year's work and study, I have initially understood and mastered the construction methods and procedures of municipal roads. Learned how to communicate with workers, how to guide the construction personnel to carry out construction work. Resolutely obey the arrangement of the company and the leaders of the project department in the work, and consciously do all the work well. Learn various construction schemes, summarize drawings and consult construction specifications. Do a good job in the construction log, prepare for the work that has not yet started, and review the completed work. Unite colleagues, carry forward the spirit of teamwork, and good communication can make the work easier. Only by actively integrating into the collective and handling all aspects of relations can we maintain a good working condition in the new environment.
Problems and shortcomings of verbs (abbreviation of verb)
I don't have enough theoretical knowledge, professional practice and experience. At work, I often do things by feeling and deal with problems by my own ideas. Do not dare to try boldly for the work that you have not mastered. Sometimes I feel lazy at work and the construction materials are not arranged in time. Caught off guard by sudden and accidental construction conditions, the consideration of things is not comprehensive enough. Do not do well in strengthening the execution of construction workers, and avoid self-change in the future career.
VI. Measures for the next step
Continue to learn new knowledge, strengthen the familiarity with drawings, and strive to master various construction schemes. If you don't understand, ask the master and the old staff in time. Improve one's own quality and ease one's working mood. Strengthen communication with various departments in order to arrange construction materials in time. Improve your execution ability and complete the tasks assigned by the leaders as soon as possible. Strengthen their sense of responsibility, not afraid of new work arrangements. Not afraid of hardship, adhere to the working principle of "doing more and doing better".
Sail against the current, if you don't advance, you will retreat. In the future work, I will learn to master more professional knowledge and construction methods, improve my working ability, strengthen my sense of responsibility, enhance my safety awareness, ensure the quality of the project, and continue to work hard to complete every task assigned by the leaders. I will continue to work hard to correct and make up for my shortcomings and defects in time. Under the leadership of leaders and with the help of colleagues, I believe I will do better in my future work. Make contributions to the future of Erdaoqiao Branch!
Summary of municipal construction work 3
In the past year, through unremitting efforts, I learned a lot about construction engineering, but I realized that I should further study relevant professional and technical knowledge and improve my knowledge of construction management in order to devote myself to my work. Looking back, the work is summarized as follows:
I. Summary of work
During my work, I studied and supervised the construction projects of single dormitory, staff canteen and _ _. And further understand and master the _ _ project.
Second, the work progress
1, May 23, single dormitory construction, learning single dormitory foundation pit excavation and backfill related processes and standards. On May 27th, the canteen was started to learn and supervise the related construction process of the canteen.
In the following more than half a month, I tracked the construction progress of the staff canteen and single dormitory, and learned the related process operations and technical standards such as foundation pit excavation, backfilling, steel bar acceptance, formwork acceptance, cushion layer and foundation engineering. Great progress has been made in engineering construction technical standards and project schedule management. On the premise of constantly improving relevant professional knowledge, the company leaders put me in charge of the construction project of _ _ _.
2, June 15 began to be responsible for _ _ warehouse construction. /kloc-excavation of foundation pit was completed in June of 0/5, 16 pliers and 17 pliers. At the end of June, the first gravel backfill compaction of foundation pit was completed.
3. Cooperate with purchasing and related logistics.
Three, the main problems in the work are
Because I just started to contact the project, I am familiar with the drawings and have relatively insufficient construction experience at work. But through these two months' study, I have learned a lot about the technical standards and professional technical management in the construction process. In the future work, I will continue to study, improve my professional and technical knowledge, improve my cognitive ability to work, and better devote myself to my work in the future.
Fourth, work experience.
1. During these two months' work practice, I participated in many collective work and got along well with my colleagues. In this process, I strengthened the most precious and important team consciousness. On the basis of trusting yourself and others, the team will be invincible if they have unified thoughts and actions. In the project, everyone reminds each other and complements each other, which improves the work efficiency. Communication is the most important thing in all work, so we must deal with information timely, effectively and clearly.
2. Every step of work should be precise and meticulous, and strive for refinement. Under the guidance of this mentality, being able to act positively and confidently is the progress of my mentality in the past two months.
3. At work, I learned a lot of technical knowledge, and also strengthened my awareness of project quality, cost and progress. Cooperate with colleagues around you more tacitly. There must be a teacher in a threesome. I learned a lot of knowledge and skills from them, and learned the truth of being a man. I'm also glad to have them around when I first hit the road. I will definitely form an excellent team with them and make better achievements.
Verb (abbreviation of verb) working face
In 20__ years, the company has to speed up the project progress, and the work pressure is even greater. We should work hard, diligently and solidly to do every job, handle every detail, strive to improve our skills and execution, and grow and progress at an early date. Among them, the following points are the focus of my improvement next year:
1, improve the initiative of work, do things simply and decisively, and don't be slow;
2, improve the overall situation, whether can let others work more smoothly as a yardstick to measure work;
3, seize every opportunity to improve professional ability, strengthen the usual knowledge summary work;
4. Thinking and practice of fine chemical industry.
As new employees, all localities need to learn, listen more, see more, think more, do more and communicate more, learn from each employee their excellent work habits and rich professional skills, and cooperate with the continuous progress of practical work. No matter what the environment, I believe in these two points: one is that three people must have a teacher, and the other is that diligence can make up for it. Sometimes I deeply realize that your work can't be perfect if you put your energy into it. After all, the work project is so complicated that few people will understand it, but you should do more and learn more. I believe that as long as we do things seriously and treat people honestly, we will definitely become qualified talents in the company.
Summary of municipal construction workers' work 4
At the arrival of this new year, according to the actual situation of my work, I make an analysis and evaluation of my work, sum up experiences and lessons, and put forward improvement methods, so as to learn lessons from my future work, make up for deficiencies, and provide a basis for continuously improving my work methods and improving my work efficiency in the future.
First, perform job responsibilities.
1, project quality management.
In view of the particularity of Wang Hucheng project, the project quality requires high standards and a high starting point. In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and understand the quality, progress and safety requirements of the project technically, so as to lay a good foundation for the later construction.
As the first construction monomer, at the same time, the structure is the same as 2# building. Strictly require carpenters, steel workers and bricklayers to construct according to drawings and video materials (photos, etc.). ) reserved, ask other monomer team leader to watch and put forward their own opinions, and ask other monomers to construct as required. This measure has achieved good results and laid a foundation for future construction quality. In the later period of quality management, each monomer reached the acceptance of the supervision unit and all passed, which won the praise of the construction unit and supervision unit.
2. Team management and coordination
(1) The construction manager is the most basic manager in the institute. He is both a commander and a combatant. He is the embodiment of the will and opinions of the leaders and the feedback of grassroots issues. Therefore, it is more necessary to establish a good self-image, become an example for colleagues in work and become a trustworthy partner for colleagues emotionally. We are required to work overtime and be the first to arrive, and we are required to set high-quality standards. Therefore, I have participated in all hidden projects, paid attention to process control, and controlled some common quality defects in the bud.
(2) Caring for colleagues: When colleagues have something to do, they take the initiative to help cover for them, and organize the whole class to care for their condolences together to form a big family atmosphere.
(3) Pay attention to the training of four single building numbers. At every meeting, aiming at the problems existing in construction cooperation, I try to let every comrade take the leadership position at least once to increase experience, so that every comrade can be independent and deal with various problems, and the business and technical level of the whole team has been improved as a whole.
3, safety management work
In the process of work, we actively cooperated with the security department to do a good job in the safety management and education of construction personnel, and achieved excellent results in many inspections by the construction unit. In the fourth quarter safety inspection, 1# was identified as the safety management demonstration monomer of this project.
4. Coordination with the construction unit and supervision unit
As a construction manager, I paid attention to the coordination with the construction unit and supervision unit from the beginning of the Wang Hucheng project, and took the lead in studying and implementing the good suggestions put forward by the construction unit and supervision unit, which won unanimous praise from the construction unit and supervision unit.
5, material management work
Based on the principle of cost saving, we strictly control the control of raw materials in the actual work process, and every penny is spent on the project in the use of formwork, concrete and steel bars. For example, after the construction of each floor is completed, it is important to ask the reinforcement team to sort out and collect them, all of which are used for the lower construction. The concept of cost saving has been implemented in the actions of each team to save costs in project construction.
6. Technical management
In the work, the requirements for construction technology are more stringent. During the working year, 37 work contact sheets were put forward, which played a certain role in the project schedule. For example, in the civil air defense construction from June 5438 to February this year, I took the initiative to negotiate with the leaders of the project department and put forward the construction technology of changing the post-pouring belt into the strengthening belt. After receiving the affirmation and support from the leaders, I negotiated with the construction unit, supervision unit and design institute for many times, and finally achieved the expected goal, and regained a certain time limit for the civil air defense project construction.
Second, new works
Third, the attendance rate
This year, I insisted on leaving Man Qin without being late, leaving early and being absent from work. All activities organized by the unit can be present on time and actively participate.
Fourth, the ideological situation.
In order to improve my ideological understanding and political consciousness, I actively moved closer to the party organization and earnestly studied the spirit of the party and the company's policies. Pay attention to learning new technologies and apply them to practical work.
Problems in verb (abbreviation of verb) and its improvement plan
While getting good grades, I also have some problems in my work. For example, some common quality problems still exist.
In order to improve work efficiency and quality, I will focus on the following aspects in the next stage of construction:
1, strengthen various political studies and improve personal literacy.
2, strengthen business learning, improve business quality, improve the quality of work.
3. Work creatively and think more about ways to improve working methods. Improve work efficiency, make preparations before each work, and don't fight unprepared battles.
4. Strengthen communication with the leaders of the institute, so as to deepen the supervision work.
Summary of municipal construction workers' work 5
Time flies, years pass, and in a blink of an eye, I have been a construction worker for a year. I entered xiaohongmen Project Department of Water Affairs Department of Beijing Urban Construction Group on June 7th, 2000, and it has been one year since then. Looking back on the work in the past year, with the help of the leaders and comrades on the spot, we have made necessary improvements in ideas and work skills, and I sincerely thank you here. In order to do better in the future work, sum up experience and draw lessons, I will summarize the work in the past year as follows:
1. Last June, I joined the xiaohongmen Project Department of the Ministry of Water Resources. During the one-year on-site visit, I got a deeper understanding of drawings, instruments, engineering quality requirements, civilized construction and safety management.
1, in terms of drawings, I realized that I should carefully check the drawings before construction and know every detail of the drawings clearly. If you don't know where to go, you should consult your colleagues or leaders in time, and you can't take the construction for granted. To achieve the construction according to the drawing, it is absolutely certain to start construction later. Any changes in the drawings and differences in the construction drawings must be recorded in detail.
2. In terms of instruments, I understand that when calculating data, I should concentrate on it and review it after calculation to avoid making mistakes. When using the instrument, I should concentrate on it, carefully observe and confirm the data, and record it quickly to avoid confusing the observed data in my mind. The instrument should always be effective to ensure accuracy.
3. We must be strict on the quality of the project, and we can't be almost. In accordance with the requirements of the specification, we should strictly demand ourselves and the construction personnel to keep improving.
4. In terms of civilized construction and safety management, you should wear safety helmet when entering the construction site again, and pay attention to safety. Pay special attention to the construction progress, project quality and safety measures. Clean up the site in time and maintain the construction results.
2. In the progress of one year, I have come into contact with many new things that I have never encountered before, produced many new problems, set about solving a series of problems, and learned a lot of new knowledge and experience, so that my ideological understanding and work skills have been improved and further improved. In my daily work, I always ask myself to proceed from reality and adhere to high standards and strict requirements. In the future work, I will continue to work hard, report my thoughts and experiences to the leaders, and correct and make up for my shortcomings in time.
Third, in the future work, I will do the following:
1. Do four things well: be diligent in thinking, running errands, doing things, asking questions, being responsible for work, having a sense of responsibility, being strict with project quality and carrying out safe and civilized construction.
2. Write a construction diary every day to summarize the daily work data and progress, so as to arrange tomorrow's work reasonably.
3, to learn at work, supplement the knowledge not in class, and make a summary record.
4. Be more strict with yourself during work, study hard and learn from work experience; Look at the construction specifications in your spare time and strengthen your professional knowledge. The future work demands itself, but strives for better.
In the future, no matter in any post, we should work hard, cooperate happily with other colleagues, be enterprising and complete the tasks assigned by the leaders. In short, in the future work, I will constantly sum up and reflect, spur myself to enrich myself and improve my quality and technical level, so as to adapt to the development of the times and enterprises, grow together with the company and improve together.