Current location - Education and Training Encyclopedia - Education and training - What are the procedures for enterprises to pry open cng for their own use?
What are the procedures for enterprises to pry open cng for their own use?
According to relevant information,

1. First, choose a place that meets the internal safety regulations and standards of the enterprise. The plot needs to be commercial or industrial land, and a certificate of ownership is required.

2, and then in the local environmental protection bureau for online filing or on-site filing.

3. Then apply for an application letter from the local land and resources bureau.

4. Entrust a chemical design institute with petroleum qualification to design drawings.

5. Take the drawings and apply to the local Housing and Construction Bureau and the fire department to review the drawings.

6. After approval, entrust a qualified skid-mounted gas station for installation.

7. Arrange two or more employees of the enterprise to go to the Safety Supervision Bureau for safety operation training and research.

8. After the installation, apply to the Housing and Construction Bureau and the fire department for acceptance, and get acceptance opinions after passing the inspection.

9. Inform the local meteorological bureau to evaluate the lightning protection and natural disaster prevention safety functions of its project.

10, and finally go to the safety supervision bureau to make the final safety record of the whole set of equipment.