1. After the hydropower transformation is completed: This is the stage, so you can plan the circuit in advance and confirm the wall switch to avoid the switch being wrapped in the cupboard or wardrobe.
2. After the ceiling is completed: In order to confirm the height of the wardrobe more accurately, the ceiling is installed in the kitchen first, and then the hanging cabinet is installed.
3. After the floor or floor tile is paved: the wardrobe can be installed behind the floor or in front of the floor, mainly depending on the communication of the designer. You can save some floors/tiles before installing them on the floor.