Tools and tools used
Toothless saw blade cutting machine, hand electric drill, impact electric drill, nail gun, various specifications of drill bits, wrenches, screwdrivers, hammers, chalk wires, threaded pendants, nylon wires, steel tape measures, electric welding machines, oxygen cutting equipment, driving suction cups, electric hanging baskets, glue injection guns, pneumatic riveting guns, safety belts, etc.
Preparation work before materials enter the site.
After signing the contract, the designer should put forward the material schedule of this project in the shortest time according to the architectural drawings and curtain wall project scheme of this project. Project intends to cooperate with the production department, formulate the processing plan of this project according to the construction progress and the actual situation of the project site, reasonably organize and arrange production, and ensure the timely arrival of products.
Installation process flow
Pay-off → Fixing skeleton connector → Fixing skeleton → Installing aluminum plate → Closed structure treatment → Inspection.
Precautions for installation
The variety, quality, color, pattern and line of aluminum plate should meet the design requirements, and should have the product certificate. When the curtain wall skeleton adopts steel keel, its specification and shape should meet the design requirements, and rust removal and antirust treatment should be carried out. When there is no requirement for aluminum plate installation and design, core-pulling aluminum rivets should be adopted, and rubber rings must be padded in the middle. The spacing of core-pulling aluminum rivets should be controlled at100-150 mm.