Minutes of Fan Warehouse Meeting:
Minutes of acceptance meeting of foundation division project
The meeting time is three o'clock in the afternoon.
Meeting address: site office of project department
Participating units and personnel:
Hu 'nan Dida Traditional Chinese Medicine Co., Ltd. Guo Guowei Hu Bingkun
Liu Jing' an Yuanjiang architecture design institute
Zhongyu supervisory company Cao Zhen Guo Jia
Magongpu Construction Company Wu Yuexian
Huang Hui Sun Jianhua construction project quality supervision office
The foundation and foundation sub-project of Dida Chinese medicine warehouse project started on August 10, 2006 and was completed on September 10, 2006. Today, all parties involved in the construction have accepted the sub-project The meeting was presided over by Cao Zhen of Zhongyu Supervision Company.
Cao Zhen: Just now, everyone has inspected the project entity and checked the inspection data of this sub-project. All parties involved in the construction are invited to evaluate the quality of the foundation and sub-projects of this project. First of all, please ask the construction unit to introduce the construction and self-evaluation.
Wu Yuexian (Wuchuan Jiansi): The construction area of Dida Chinese medicine warehouse project is 993㎡, which is a bent structure. Independent foundation, the project started in August 10, and the foundation was completed in September 10. After the foundation trench is excavated in place according to the design drawings, geological prospecting data and drilling data and passed the self-inspection, the geological prospecting, design, supervision, construction and quality supervision have accepted the foundation bearing capacity, axis and geometric delay. Concealed works such as column foot reinforcement, column dowel reinforcement, ground beam reinforcement and ground beam reinforcement shall be carried out after inspection by relevant parties. Before concrete construction, sandstone test and concrete mixture ratio test are carried out respectively. All raw materials shall be tested before use, and witness samples of raw materials and concrete shall be taken as required. In the whole construction process of this sub-project, we will carry out the construction in strict accordance with the design and construction drawings, design changes, construction acceptance specifications, mandatory standards for engineering construction and Unified Standards for Construction Quality Acceptance of Building Engineering (GB50300-200 1). Relevant technical data are true, synchronous, complete and standardized, and 54 inspection lots of 6 subprojects have passed the self-inspection. On the basis of comprehensive construction, data and entity self-inspection, according to the Unified Standard for Construction Quality Acceptance of Building Engineering (GB50300-200 1), this division passed the self-inspection.
Liu Jing 'an (geological prospecting unit): The foundation form of this project adopts independent column foundation, and all the foundation pits are excavated to the bearing stratum, which reaches the bearing capacity provided by the geological prospecting report and meets the design requirements. Buried depth and geometric dimensions meet the design and specifications. Agree to assess the division as qualified and agree to acceptance.
Wang (Design): After on-site inspection, the construction unit carried out the construction in strict accordance with the design drawings, design changes and design requirements, met the design requirements, and agreed to pass the partial acceptance.
Cao Zhen (Supervisor): The bearing stratum of the foundation of this project is clay, and the independent column foundation is adopted. The concrete of independent column foundation and ring beam ground beam are C25 reinforced concrete. During the construction, the raw materials, components and equipment used in the project were carefully inspected and signed in strict accordance with the supervision norms and procedures, and all raw materials were inspected before use. For the construction of key parts of the project, we conducted on-site supervision and conducted regular or irregular inspections on the construction of other parts of the project. Once the problem is found, it will be rectified immediately. By participating in the cooperation of all parties, the engineering quality of this division is guaranteed. We have checked all kinds of sub-projects of the engineering entity, and they all meet the design requirements and relevant specifications. The technical data are true and complete. According to the Unified Standard for Acceptance of Construction Quality of Building Engineering (GB50300-200 1), the project of this division was assessed as qualified and agreed to be accepted.
Zhou Lifei (planning unit): The project is laid out according to the planning drawings and meets the planning and design requirements, and it is agreed to enter the decoration part for construction.
Chen Yonghong (Archives): Please complete the information synchronously.
Guo Guowei: During the construction of this branch project, the management of survey, design, supervision, construction and other units is very responsible and the services are in place. With the cooperation of all parties, the project of this division was completed on time with good quality and quantity, and our company is very satisfied. The following steps can be carried out only after the concealed works, such as foundation trench inspection and steel reinforcement, of this division have passed the inspection by relevant parties. All raw materials have been tested before use, with good quality and complete information. Agree to be assessed as a qualified teacher and agree to accept it.
Sun Jianhua (Municipal Quality Supervision Station): The soil at the bottom of the foundation pit of this division is good, the bearing stratum meets the requirements of geological exploration design, and the geometric dimensions are qualified through spot check. The raw materials are complete and tested before use. The supervisor witnessed that the raw materials and concrete test blocks were sampled according to the regulations and the tests were all qualified. Physical detection of pile foundation, concrete strength and protective layer of reinforcement are all qualified. Frame column, beam, plate reinforcement should meet the design requirements. All concealed works shall be inspected and approved by relevant parties before entering the next process. Site civilization construction is poor. The engineering entity is basically no problem, and the technical data is basically complete. As the person in charge of the quality of the project, it is agreed that the division will be assessed as qualified and accepted.
Huang Hui (Municipal Quality Supervision Station): All construction parties can earnestly perform their respective duties. Inspection lot division meets the requirements. The technical information is basically complete. As the quality supervisor of the project, it is agreed that the division will be assessed as qualified and accepted.
Signature of participants:
Model essay on minutes of warehouse meeting Part II:
Meeting contents:
The meeting was presided over by the supervisor, and Manager Diao of Party A made a concluding speech.
At the beginning of the meeting, Shang Gong, the technical director of Dongyu Construction Company, reported the implementation of the recent work plan, the problems to be solved at present and the construction plan for next week.
At present, the steel structure warehouse constructed by Dongyu Construction Company has basically completed the shale backfilling work, and the quality basically meets the specified requirements. The weather is getting better and better recently, and the site has met the construction requirements. Contact the excavator to enter the site to excavate the foundation earthwork today.
Meng Gong, Supervisor: Mainly emphasize the quality problem, and make supervision disclosure for the next working procedure. Emphasis is placed on the importance of supervision procedures, and it is hoped that Dongyu Company will strictly control the project quality according to the requirements of construction specifications, put an end to some quality problems, strengthen internal coordination and organizational management, mobilize the enthusiasm of all workers, and do a good job in project construction. The next step is to pour concrete cushion and independent foundation, which requires the constructor to strictly control the quality according to the construction procedure. The concrete cushion in C 10 design is changed to C 15. The independent foundation reinforcement that has been constructed now shall be submitted for inspection according to the procedure after passing the self-inspection, and then the next working procedure shall be carried out, and the concrete mixture ratio shall be measured and compacted by vibrating.
Supervision engineer: I reiterate that we will carry out supervision in strict accordance with the supervision procedures to ensure good quality. Through the pre-treatment of foundation trench, the construction of part of graded sand cushion and C 15 concrete cushion, it is found that there are still some problems, and the construction unit should attach great importance to it and strengthen quality management. The following mainly focuses on six aspects:
(1) reiterated that we should pay close attention to the inspection before concrete pouring.
(2) The elevation control of concrete cushion is lax, and the laying operation is not standardized.
(3) Strictly implement the inspection procedures, standardize the operation and construction, and do well the self-inspection, mutual inspection and process handover inspection of the project. Address: Tel: 0539-8202135FA _: 0539-82165438+Yimeng Road, Linyi City.
Fan Wensan, minutes of warehouse meeting:
In fact, this meeting has already been planned. Why did you suddenly call everyone to a meeting today? It is because some small problems are not allowed to expand and affect the whole group. We should pay attention to details.
1, reaffirming the work arrangement of the three warehouses (packaging warehouse, hardware warehouse and heat-insulated wood grain warehouse). At present, the night shift of packaging warehouse, hardware warehouse and heat insulation wood grain warehouse has been cancelled. Your warehouse administrator should do a good job in daily work. Why hasn't the time been reduced? Although we canceled the night shift, the production workshop is in two shifts, so it is most likely to pick up materials when changing shifts. At this time, you must stick to your post. Now you have three off-duty hours. /kloc-those who get off work at 0/7: 30 should go through the handover procedures. /kloc-those who get off work at 0/9: 30 must be at their posts before getting off work, because this time period is the shift change time of the production workshop, and there may be more things to collect. So I arranged for a warehouse keeper to get off work until 20: 00. Don't affect production just because you cancel the night shift.
2. Emphasize the vacation system. Due to the inventory at the end of the month, in principle, there was no rest at the beginning and end of last month. When taking a break, you should write a note, or you can call me first and then make up the note. Communicate with each other before taking a break and avoid taking a break at the same time. Give me the note and I'll arrange someone to cover for you. When handing over the shift, both parties should explain some details or matters needing attention in the work. If you leave your job due to non-work factors during working hours, be sure to tell me so that I can arrange my work properly; In addition, if you want to leave the warehouse to receive goods outside, you must indicate your whereabouts and when you will come back on the small blackboard. If it is found that there are people who leave their posts without permission, a deduction system will be implemented. If you repeat it again and again, you will be transferred to other positions. Because we are a group, we should be innovative, so as to do a good job. In addition, I don't allow one person to affect the progress of the whole group and our work.
3. Work attitude. If you have any problems in your daily work, you should report them to me in time. If you have any suggestions or opinions at work, you'd better reflect them in writing to avoid forgetting them because you are too busy. In March, I submitted an application to award Chen Cong 100 yuan. Although I haven't been here long, only two months and two days, I know very well how each of you does things. Doesn't mean that people who don't get rewards don't do well. In fact, our group as a whole is still good. In the past two months, I had the most opportunities to communicate with Chen Cong. In the process of communication, I also found many problems, but as soon as I mentioned them, Chen Cong would give me many suggestions and methods for improvement. It can be said that we have made common progress in communication and slowly filled some loopholes in our work. So this 100 yuan is also an encouragement to Chen Cong. In fact, as long as you know enough to find problems and then find ways to solve them, this is also an improvement. Having said that, what I regret most is that there are few opportunities to communicate with aluminum bar warehouses and aluminum ingot warehouses. Their working environment is the worst in several warehouses. But what they do is also the most reassuring thing for me. I will spare more time to communicate with them in the future.
The storekeeper must lock the door when he leaves his post, especially the gunpowder warehouse. Besides, be sure to turn off the lights after work. Last night, m always found that the storage room and hardware room were not closed.
5. If the powder warehouse is abnormal during the night shift, for example, the normal procedure at present is to distribute the old powder first and then the new powder. If the workshop is afraid of affecting the quality or is afraid to use old powder for other reasons, be sure to report it to me. You can write it down and give me the report the next day. I'll communicate with the workshop director. In addition, make a good record of picking goods in other warehouses at night shift.
Tasks of each warehouse this month
1. receiving warehouse: the specifications and models of the goods should be made clear when receiving the goods, and they should be consistent with the bills when checking the invoicing. Receive goods strictly according to the purchase quantity. Transfer to other warehouses in time after receiving the goods, and the documents must go with the goods. If the delivered materials are taken away immediately, make sure that the consignor signs the delivery note, so that the warehouses can issue the picking list accordingly. Register the materials (mainly packaging and chemicals) collected by each workshop so that other warehouse managers can check and issue the material requisition.
2. Packing box: Since most of the packing materials are in the storage box or on site, after receiving the delivery note, the goods should be proofread, handled at the second level, and problems should be raised and solved immediately. At present, there is no problem in warehousing and transportation. The next step is to match the accounts with the goods, track the picking of the goods to be processed and make records.
3. Powder chemical warehouse: enter the receipt document according to the powder code, and track and record the picking situation of' Shili' and' Aiyue' powder. Whether and how to correct the previous coding will be decided after research.
4. Hardware insulated wood grain warehouse: well marked, and different items to be processed (including materials with or without accounts) are well marked or marked differently. (If different colors or charts are used), the receipt and picking list shall be sent out in time to avoid omission, which will lead to inconsistent accounts and affect the inventory to be checked when reviewing the purchase requisition.
5, aluminum ingot library, aluminum strip library: while marking, try to place it regularly according to the size of the specification. In addition, the padding in the long pole placement area should be sorted out in time, and the waste and residual materials on the warehouse road should be picked up in time, so as not to bring inconvenience to the cleaners who help us clean the warehouse.
6. Mold warehouse: do a good job in receiving and distributing new molds and outward processing molds, as well as preparing molds.
The following words:
If you have any questions that need your help, please ask them. Let's work together to do a good job in the department and make the warehouse appear with a brand-new look! Our goal is to embody the standardization of warehouse procedures, the visualization of materials, and the clarity and simplicity of data. Thank you! !
Article 4 of the model warehouse meeting minutes:
Meeting time: 20th 14: 00.
Meeting place: General Manager's Office.
Main holder: _ _
Participants: all employees
Recorded by: _ _
Meeting topics: about the company's operation, market development, staff post allocation, current major issues, etc.
Meeting contents:
A staff meeting was held in the general manager's office at 2: 00 p.m. on October 20. The general manager and deputy general manager attended the meeting. The main agenda of the meeting: _ _ mainly talked about the establishment and operation of the company, and emphasized the post distribution of employees and the current major issues. _ _ mainly talked about the need to be cautious when sending information or reports to customers, and ensure the accuracy of information and reports; There are also CNAS applications, and employees need to be trained.
I. Establishment and Operation of the Company (_ _)
1. In March this year, shareholders discussed the establishment of the company, which was quickly established in April. At present, the development of the orders received is good, but it is imperative to continue to expand the market business and establish and expand the marketing department. Colleagues get along well with each other and coordinate their work smoothly. Recently, the list of companies is mainly _ _ Co., Ltd., and an agreement has been reached through cooperation. So do your best to do this case well. Since we have accepted this case, we should do things well and find a solution to the problem, instead of finding the problem but not solving it; Regarding the report, we need to pay attention to its accuracy and professionalism. The report is the product of our company and the facade of the company. Low-level mistakes should never occur. Technicians related to technical terms must pay more attention to ensure that they are correct before issuing them. Of course, these are all learned in the process. You can look at some Chinese and English reports published by _ _ _.
2. The original intention of the company is that the industry has a good prospect, and it will strive to become a listed company while the company is slowly on the right track, which is of great benefit to the company's development; At work, all employees are expected to do their basic duties. The company will solve the problems raised by _ _. It is expected that the company will complete the computer and its corresponding equipment in 10, and the sample number has been purchased by _ _. If you have any questions or suggestions in the future, whether to adopt them or not shall be subject to the instructions of the leaders.
Second, the employee job description
1. General Department: At present, there is one person in the General Department, who is mainly responsible for personnel, salary, assessment, finance, contract cost accounting, daily chores of the company, etc. If necessary, I hope everyone will cooperate with me to complete it;
2. Marketing Department:? _ _ As a business assistant, assist _ _ to do a good job in sales. Good performance in the near future, concerned about laboratory safety, serious and responsible; In addition to market business development, I also need to be responsible for outsourcing cases. I have many years of experience in reliability analysis. If others don't understand, they can ask Zhou Chao for advice and learn from him. In the aspect of report review, it is necessary to carefully review, especially technical issues, and be more cautious before issuing reports; ? _ _ As a sales assistant of the marketing department, I was mainly responsible for the laboratory assignment process, contract review process, sample receiving and dispatching, etc. And I want to make the corresponding registration, so as to be detailed and comprehensive. I need to continue to study electronic capacitors and physical experiments. If I don't know, I can ask the general manager _ _. At the same time, in the audit report, I can't slack off the audit content just because there is a final auditor.
3. technical department:? _ _ is mainly responsible for the operation, maintenance, management and custody of laboratory machinery and equipment, and timely reports important matters, and can contact the General Department or the Property Department; ? _ _ Be good at physical and chemical interviews, give full play to your own specialties, and report well. Professional translation and grammar need to continue to learn words, and you can make reasonable suggestions. ? _ _ Responsible for the quality system. In the future, with the increase of laboratory equipment, it is necessary to supervise and manage the laboratory operation process, complete the experiment according to the corresponding standards or instructions, and guide the teacher who applied for CNAS to come tomorrow. Everyone needs to study first and report the situation in time if there are any problems.
Three. The main problems at present
1, _ _ equipment maintenance problems, _ _ keep in touch accordingly;
2, CNAS application, guide the application tomorrow _ _ The teacher will come and give you training;
It takes a lot of efforts to expand the market business. Although hard work is not easy, difficulties will eventually be overcome. Therefore, the list received should not be problematic because of everyone's negligence. At this point, you need to do things carefully.
Finally, _ _ did two things: 1. Be sure to be correct when sending emails, materials and reports to customers, so be careful before that; Everyone will have training tomorrow, please arrange your work for these two days.
Model essay on minutes of warehouse meeting Part V:
Time: 20 _ _ _ _ _ _ _
Venue: Meeting Room of Expert Guest House of Hefei University of Technology
Participants:
Construction unit: Li Diary and
Expert Group: Cha Songting, Zhang, Jiang, Yang, Wang Shuanxian, Design Unit: Wang Jun.
Investigation unit: He Xing
Supervisors: Wang, Lu Zhongshan, Hu Hengqing,.
Construction units: Wu Jiaquan, Zhou Shengping, Xiao Jiangping and Wang Hongzhi.
Theme of the meeting: The feasibility of the static load-free test of manual digging pile with rock-socketed enlarged bottom of Yifu Building was demonstrated by experts.
The meeting was presided over by Director Hong of the Infrastructure Department of Hefei University of Technology. First, it was presided over by Director Li and Director Hong of the Infrastructure Department.
This paper briefly introduces the general situation of Yifu Building, and explains the content and purpose of the meeting. Due to the tight time, the school hopes to avoid static load test. Then, the design representative briefly explained the main points of pile foundation design and answered the questions raised by experts. The project manager of pile foundation construction introduced the construction progress, quality control measures and self-inspection results, and the supervision representative briefly introduced the main points of the follow-up supervision and inspection report during pile foundation construction. On the basis of listening carefully to the speeches of all parties and consulting relevant materials (design drawings, survey reports, supervision reports, construction records, etc.). ), the participating experts conducted a comprehensive analysis and demonstration around the theme of the meeting and related issues, and gained * * * knowledge. Summarized as follows. This summary can be used as one of the bases for pile foundation design and construction acceptance.
1 According to the structural characteristics of Yifu Building and the foundation conditions of the construction site, manually dug rock-socketed cast-in-place piles are adopted.
The design scheme is reasonable, and the static load test of single pile is the requirement of this project.
2. The main reasons why the excavated pile of Yifu Building can be exempted from static load test are as follows:
(1) The safety level of the pile foundation of this building is Grade II, and the pile foundation specification allows determining the bearing capacity of a single pile according to the regional experience.
(2) The foundation condition of the pile foundation construction site is simple, and the pile foundation construction unit has rich construction experience.
Supervisors are very serious and responsible, and the process quality inspection and acceptance are in place step by step to ensure the quality of pile foundation construction.
(3) Hefei area has accumulated some static load test results of similar pile foundation projects and settlement observation results of high-rise buildings.
The data and practical experience of nearly 300 high-rise buildings verify that the qpk of similar pile tip bearing layer is 6000kpa, which is safe and reliable, while the qpk actually used in this project design is 5000kpa. Therefore, in the bearing capacity of single pile, the safety of pile foundation is high, which can ensure the bearing capacity of single pile required by design.
(4) At present, there is a lack of large-tonnage pile foundation static load test equipment in our province, and the existing equipment can not reach the ultimate load stage when doing single pile simulated static load test, and the test results lack engineering significance. At the same time, it also needs more than 6.5438+0.5 million yuan for testing and a delay of more than 45 days.
In view of the lack of comparative data between static load test and high strain dynamic detection of similar pile foundation projects in Hefei area, and the error of high strain detection of single pile bearing capacity is too large, it is suggested that high strain detection of single pile bearing capacity should not be adopted in this project.
This project is a high-rise building with one column and one pile, and 94 piles should be tested for low-strain pile quality. In order to ensure the safety of the project, accumulate the observation data of regional pile foundation settlement, and provide the necessary basis for the excellence of this project, it is suggested to carry out settlement observation, and the units with engineering survey qualifications are required to undertake the observation task. At the same time, in order to ensure the integrity and reliability of observation data, please do your best to protect the observation points.
The expression of the design value of single pile bearing capacity in the pile foundation design specification is not accurate enough, so it is suggested that the design institute check the strength and load of the main pile types.
In view of the shortcomings of the investigation report, please ask the investigation institute to revise and improve the report.
Finally, Wang Jun, the design representative, agreed with the expert's opinion and made regular settlement observation on the building.
Hefei university of technology jijian office
20__ _ _ _ _ _ _ _
Article 6 of the model warehouse meeting minutes:
Time:
Location:
Participants:
Conference theme:
Abstract content:
This regular meeting was convened by _ _ _, presided over by _ _ _, and recorded by _ _ _. The whole meeting lasted * * _ hours. The meeting heard _ _ reports, studied and discussed _ _ tasks, and deployed _ _ tasks. The summary is as follows:
These decisions are as follows:
1._______________。
2._______________。
3._______________。
4._______________。
Attachment: _ _ Description of key tasks of regular meeting
__ _
_ _ _ _ _ _ _ _ _
Cc: _ _ _ _ _ _, _ _, _ _ _ _ _, _ _ _ _ _ _
Attachment: _ _ Description of key tasks
No.: Date:
No. Task Name The person in charge is responsible for coordinating the completion time of the department. Remarks
1
2
three
three
Watchmaking: review: approval:
The explanation is as follows: 1. Typesetting requirements: A4 paper, the title is No.2 bold, the text is No.4 small font, the line spacing is 25, and the page number is on the right; 2. If there are no tasks assigned at the meeting, you don't need to fill in the "Description of Key Tasks of the Meeting" form, just make the meeting minutes.
6 warehouse meeting minutes related articles:
★ 6 model articles on minutes of warehouse meetings.
Taken the warehouse meeting record 6 model essays (2)
★ 3 model articles on minutes of logistics meeting
★ There are 6 model essays on the summary of the symposium.
★ There are 6 model articles of departmental meeting minutes.
★ There are 6 sample essays on office meeting minutes.
★ 6 model articles of quality meeting minutes.
★ 6 samples of procurement meeting minutes.
★ 3 Common model articles of meeting minutes.
★ There are 3 sample essays on minutes of working meetings.