First, the campus information construction work
The new year will be a crucial year for the informatization construction of our school. The key point is to further improve hardware construction, strengthen the construction and integration of application systems, establish rules and regulations, optimize processes, and do a good job in information technology application training.
1. application system
In 20xx, the informationization work shifted from hardware construction to application system construction, and promoted the testing and operation of established application systems, such as office system, personnel system, alumni system and network teaching platform. Assist user departments to carry out research, procurement and construction of scientific research management, student integration, virtual experiment teaching and other systems to ensure that all key application systems are deployed under unified standards, norms and platforms. Assist all departments to re-engineer and optimize the application system.
2. Networking with the West Campus
The interconnection between the two campuses was solved by leasing the operator's optical cable (the bidding negotiation just ended yesterday afternoon).
3. Multiple entrances and exits
Solve the problem of slow access to our school website by public network. Through technical means, the multi-entry and multi-exit optimization of our school network has been realized, and the external access speed of our school website has been improved.
4. Research on mobile office technology
Through technical investigation, the realization form of mobile office is determined, and the mobile office of various business systems in our school is realized in time.
5. Construction of campus network in new campus
According to the school plan, the new campus will be opened in September. Therefore, this year, we should plan and design the network layout of the new campus and complete the network construction and one-card system construction of the new campus.
Second, the laboratory construction and management work
1. Do a good job in the demonstration, evaluation and construction of laboratory construction projects in 20xx.
2. Strengthen the evaluation of completed projects. This semester, we will organize the acceptance of some completed laboratory construction projects in 20xx. The acceptance results will be linked to the laboratory evaluation, and will serve as an important basis for the laboratory construction project in the next year.
3. Strengthen laboratory management. According to the adjustment of school disciplines and majors, do a good job in the adjustment of laboratories in various departments in time; Do a good job in collecting laboratory information to ensure the smooth completion of data collection, entry and reporting of the basic statements of the Provincial Department of Education; Do a good job in the assessment of the target responsibility system.
4. Do a good job in the demonstration and investigation of public experimental teaching platform. Promote the enjoyment and use of all kinds of experimental teaching resources, and gradually form a public experimental teaching platform with different functions and inter-colleges; Strengthen the construction of experimental technical team and promote the scientific, standardized and modern laboratory management.
Third, the equipment management
1. Accounting management of instruments and equipment. After the end of the school post employment system, the name, functions and personnel of the department have changed greatly. In the next step, the equipment department will re-hire the equipment manager from all departments together with the State-owned Assets Office of the Finance Department, and adjust the accounts of instruments and equipment according to the actual situation. At the same time, strengthen the management of donated equipment, and account for the equipment donated by other units this year.
2. Disposal of abandoned instruments and equipment. There are more and more instruments and equipment to be scrapped in our school, which need to be solved urgently. This year, the Laboratory and Equipment Management Office will issue the Management Measures for the Configuration and Scrapping of Instruments and Equipment in xx College. The next step will be to scrap 1-2 times a year according to the capital investment of the school equipment, in accordance with the procedures and in line with the principle of urgency first and then delay.
3. Management of large-scale instruments and equipment. With the increase of precision and expensive large-scale instruments and equipment in schools year by year, the management demand for large-scale equipment is more and more urgent. In order to strengthen management, this year we completed the construction of a large-scale instrument and equipment resource sharing platform and the formulation of related management systems.
In a word, the level of laboratory construction and management is not only a sign of a university's running strength, but also an important embodiment of its teaching level, scientific research level and management level. With the development of schools, the construction and development of laboratories are facing new problems. As the competent department, the laboratory and equipment management office will continue to do a good job in organization, coordination and service, and strive to make the laboratory construction and management in our school distinctive and up to standard.
2. How to write the model essay on the work plan of the Equipment Department?
I. Equipment maintenance
1. Quickly find the cause and solve the fault according to the maintenance report.
2. Record the repaired equipment for future reference.
3. If the equipment exceeds the maintenance capacity of the department, it shall be sent to relevant units for maintenance in time.
4. Inform the repairman to take away the repaired equipment in time.
Second, the computer room maintenance
1, servers and switches are regularly maintained.
2. The computer room should be cleaned regularly.
Third, information equipment supervision.
1. Do random checks to see if any software unrelated to work is installed on the company computer without permission.
2. Conduct irregular spot checks on the daily use, maintenance and hygiene of the company's information equipment.
3, in violation of the provisions of the use of information equipment in accordance with the provisions of punishment.
Fourth, consumables inventory
1, the requisition of consumables shall be registered in writing.
2. Consumables inventory table is updated regularly.
3. Inform to buy consumables that will be used up soon.
3. How to write the model essay on the work plan of the Equipment Department?
First, working ideas.
The working idea of 20xx is "to ensure the good operation of equipment, improve the quality of equipment maintenance personnel, strengthen system implementation and post responsibility performance, comprehensively improve the level of equipment management, and give full play to the economic benefits of equipment management."
Second, the specific work objectives
(1) The equipment integrity rate is over 97%.
(2) Put an end to extraordinarily serious and major equipment liability accidents.
(3) The equipment repair expense rate meets the requirements stipulated by the factory to prevent the equipment from disrepair.
(4) Strengthen data management to ensure its authenticity, accuracy and practicality.
Three. Main work contents and measures
1. Change the thinking of equipment management from passive after-the-fact maintenance to active preventive maintenance. Strengthen the management of equipment maintenance, strictly implement various rules and regulations, formulate equipment maintenance plans and monthly maintenance plans according to the use and intact conditions of machinery and equipment in recent years, designate special personnel to be responsible for and inspect them, do a good job in machinery and equipment maintenance on time and step by step, conduct regular maintenance inspections, and earnestly make maintenance records of machinery and equipment.
2, do a good job of equipment inspection. Equipment maintenance personnel in each workshop shall conduct daily, weekly, monthly and annual equipment inspection according to the equipment inspection table, and make records. Find problems and deal with them in time, so that equipment maintenance can be truly implemented.
3. The equipment manager should often go deep into the workshop production line to check the operation of all important equipment, track the inventory and procurement of main spare parts, urge the purchasing department to purchase the main parts in short supply, check the processing and production of self-made parts in the workshop, and ensure that the main parts are available as needed; Check and urge the workshop to do the daily maintenance of equipment, and give technical guidance to do the installation, maintenance, use, maintenance, inspection and statistics of Yi Long; Coordinate production and equipment maintenance reasonably, strengthen equipment inspection, and adjust in time when abnormal conditions are found.
4. Strengthen the assessment of equipment management. According to the newly formulated equipment management assessment management regulations, do a good job in the implementation of the new regulations. First, it is necessary to organize equipment maintenance personnel to seriously study and understand the new equipment management assessment regulations. Second, on the basis of comprehensive inspection, inspectors should strengthen the inspection and assessment of important equipment and key contents every month. Third, according to the actual needs of equipment management, constantly supplement and improve the equipment assessment regulations to make them more in line with the laws of equipment management and better promote and improve the level of equipment management.
5. Improve the equipment management system and regulations. Review, improve, supplement and increase the existing equipment management system, so that equipment management can constantly adapt to the company's production and operation environment.
6, do a good job in the training of equipment maintenance personnel, improve the quality of training. First, actively organize the selection of outstanding personnel and participate in skills business training organized by government departments. The second is to do a good job in internal training and learning, and learn the knowledge of equipment maintenance. Third, the joint professional manufacturers, the production process of operation, maintenance, failure of more equipment for special training, mainly to operate. The fourth is to invite professional and technical personnel to conduct on-site practical training for equipment maintenance personnel. Fifth, for trainees, it is required to write training experience, explain the gains of learning and suggestions for training, and enhance the training effect. Trainees should submit their training and learning experience to the Equipment Department within 7 days after the training.
7, clear data management subject, strengthen data management. Fill in the form required by the factory, standardize the content, and put an end to alteration and untrue data.
4. How to write the model essay on the work plan of the Equipment Department?
I. Use of mechanical equipment and vehicles:
1, the use of machinery, equipment and vehicles must implement the principle of "combining maintenance and repair, and the man-machine is relatively fixed", and implement the responsibility system of assigning people and posts. Machinery and equipment operated by many people and multiple shifts shall have a team leader, and a team leader responsibility system shall be established. For small and medium-sized machinery and equipment, the responsibility system for machinery and hands should be implemented.
2, without training qualified personnel, are not allowed to work, it is forbidden to driving without a license vehicles (including mobile construction machinery), it is forbidden to give the main mechanical equipment to migrant workers.
3. The captain is appointed and removed by the project department, and the captain can enjoy the captain's allowance.
4. The driver's driving subsidy and mechanical dust operation subsidy shall be implemented according to the relevant provisions of the company's documents.
Second, the operator's post responsibility system:
1, mechanical equipment operators, car drivers, must obey the work arrangement of production scheduling or maintenance department, strictly implement safety technical operation procedures, and it is strictly forbidden to operate locomotives after drinking, so as to ensure safe production, ensure construction quality, and strive to reduce energy consumption and other indicators.
2, earnestly do a good job in the daily maintenance of locomotive. Before starting the machine, carefully check the tightness of screws in all parts to find out whether the lubrication, fuel and cooling water are normal. After stopping the machine, carry out cleaning inspection, stop in an orderly manner, keep the machine in good condition and tidy, and do not disassemble parts and accessories.
3, the implementation of multi-shift operation succession system. During the shift change, the locomotive running records shall be disclosed to the successors to ensure that the handover procedures are complete.
4, adhere to the system of routine maintenance once a week, routine maintenance time is 4 hours, usually on Saturday, such as busy work can use spare time. When contracting operations, the person in charge of the contracting team shall arrange maintenance. Do not cheat, submit maintenance date records and monthly checklist to the maintenance department. If it is found that it is not implemented or poorly maintained, the maintenance department has the right to punish it.
5, the use of the car scheduling system. The vehicle is scheduled by maintenance or dispatching or office, and the driver leaves the car with the dispatching list.
6, mechanical vehicles unless the project department arrangement, otherwise no one shall operate without authorization, once found, maintenance or security officer has the right to punish.
7, locomotive drivers in principle, the implementation of the "three fixed" system, such as work needs can be flexibly arranged by scheduling.
8. Without anyone's arrangement, the operator shall not hand over the kept locomotive to others for operation or personal use without authorization. Otherwise, the parties concerned and the locomotive custodian shall take full responsibility and compensate all economic losses.
9. If the operator violates the operating rules of safety technology, resulting in machine damage accident or safety accident, the principle of "three-no-pass" shall be implemented according to the degree of injury and the seriousness of the circumstances, and punishment shall be imposed according to the relevant regulations of the company.
10. Vehicles, electric hopper cars, cranes, mixing stations, generators and other mechanical equipment shall be operated and maintained by maintenance personnel or teams according to the machine number, and shall not be changed without permission.
1 1. The operator shall timely and accurately fill in the operation records (filled in with carbon ink) of the locomotive, and submit the maintenance statistics report on the 25th of each month.
12. No one is allowed to leave the construction site or use it as a means of transportation without the arrangement of the leader, dispatcher or maintenance department. It is strictly forbidden to carry people in and out of the construction site at will. If they are found, they will be punished for violating the regulations.
13, actively do a good job in energy conservation, and implement energy consumption assessment for vehicles and construction machinery. The operator of the over-consumption equipment shall report the reasons in writing, submit them to the maintenance department for analysis, and implement the saving award and the penalty for exceeding the requirements.
14. Operators should study technology hard and achieve "five understandings" (structure, principle, performance, usage and common knowledge of oil use) and "three skills" (operation, daily maintenance and troubleshooting).
15. Operators must actively participate in the Red Flag Equipment Competition, and the maintenance organization will conduct assessment. Those who are rated as red flag equipment will be rewarded according to regulations.
Three, mechanical equipment, vehicle maintenance:
1, mechanical equipment and vehicle parts are planned by the maintenance department, and the materials department is responsible for purchasing and maintenance personnel, indicating the locomotive number. On 25th of each month, the Material Department forwards the purchase requisition to the maintenance department for single-machine accounting.
2, the repairman must obey the maintenance, scheduling arrangement, do urgent engineering needs, timely troubleshooting, to ensure the quality.
3. The second guarantee, third guarantee and overhaul of mechanical equipment shall be arranged by the maintenance plan. The locomotive sent for external repair shall be approved by the deputy manager in charge of the repair shop, and the repair items, repair grades and estimated repair costs shall be determined. After the maintenance, the maintenance technician shall inspect the mechanical equipment and vehicles before leaving the factory, and the maintenance technician shall be responsible for the inspection and acceptance.
4. When the car breaks down on the way, it needs to be repaired in the factory and the parts assembly needs to be replaced, it should be reported to the relevant leaders of the project department or maintenance department in time.
5. When new machinery enters the site and is handed over for installation, repairmen and operators should actively cooperate with maintenance technicians for installation and debugging.
6, mechanical equipment configuration for the use of subcontractors and contractors. When mechanical equipment needs maintenance, the project team and the contracting team should actively send people to cooperate with the maintenance.
Fourth, the reward and punishment system:
At the end of the year, the operators with outstanding equipment management, use, maintenance and repair work will be rewarded, and the operators with poor work will be punished.
5. How to write the model essay on the work plan of the Equipment Department?
First, team building.
1. Integrate team resources, put the right people in the right positions, let people make the best use of their talents, and gradually implement youthfulness, knowledge and specialization.
2. The management team implements fine-tuning and changes according to the work performance of 20xx, and strengthens the echelon construction of the management team. Implement internal post competition,
Second, the plan execution
Before the arrival of this year's peak season, we made a comparative analysis of the production capacity of the production department in the peak season of 20xx and the actual production situation in the peak season of 20xx, made a detailed forecast of the monthly production capacity, labor consumption and existing risks in the peak season, and took corresponding measures to ensure the realization of the plan.
Third, system construction.
1. Re-formulate the management table of equipment spot check to make it more in line with the requirements of equipment management;
2. Carry out 6S on-site management, and vigorously carry out target system, daily clearing system and incentive system.
3. Sign the responsibility form for equipment management objectives with all departments and strictly implement it. Break the pattern of doing a good job and eating from the same pot, and continue to promote the independent maintenance and improvement of TPM.
Third, the equipment transformation
Design and customization of 1 ××× complete sets of automobile production line equipment;
2. Design and customization of ×× conveyor belt and thickener;
3. New project of ×× drying room;
4. Introduce automatic packaging equipment and color sorter equipment.
Fourth, equipment and energy improvement projects.
1. Recycling of dust removal water from boiler water mill;
2. Reuse of washing water in each workshop;
3. Salt water concentration project;
4. Recycling of multifunctional steam circulating water.