See the words like a face, hope to show your letter. The stars have changed, and the warm winter has arrived. In Tengchong, where the annual average temperature is 15. 1℃, the beauty is accelerating, and the outline of home is becoming clearer and clearer with the ingenuity of staying up late. At this time, I send you this letter from home to broadcast the latest information on the progress of the project. Finally, may the time remain warm, and may you and your family be well!
M5-M 13
M5
Facade: completed;
Public areas: the construction of wall and floor tiles, suspended ceiling and putty paint has been completed;
Living room: floor heating, ceiling, wall putty, floor tile and wall putty are completed, latex paint is completed, hardware installation is completed, and wall covering is completed;
Bedroom: putty is completed, floor tiles are completed, windowsill boards and lamps are installed, suit doors are completed, and wall covering is completed;
Kitchen: wall and floor tile construction is completed, ceiling and lamps are completed, wall-hung boiler construction is completed, cabinets are installed, table stones and vegetable pots are installed, and kitchen partition frame is installed;
Bathroom: wall and floor tile construction is completed, ceiling, bathroom, shower and yuba are completed; Outdoor landscape: completed;
M6、M8、M9
Facade: completed;
Public areas: the construction of wall and floor tiles, suspended ceiling and putty paint has been completed;
Living room: ceiling, putty, floor tile, sill stone, aluminum alloy sliding door, latex paint, switch panel, lamps and beautiful seams are completed in the wall covering.
Bedroom: putty completed, floor tile completed, sill stone completed, aluminum alloy window construction completed, latex paint completed, switch panel completed 95%, lamps installed, sewing completed, suit door installed 95%, wall cover the installation;
Kitchen: ceiling, wall tiles, threshold stones, aluminum alloy windows, cabinets, table stones, switch panels, lamps, beautiful seams, suit doors and wall-hung boilers are completed.
Toilet: ceiling, wall and floor tiles, threshold stone, aluminum alloy window, bathroom cabinet, table stone, basin, switch panel, lamps, sewing, suit door, shower room, toilet and bathroom mirror;
Outdoor landscape: 90% completed;
M 10、M 1 1、M 12、M 13
① Building ①M 10: After the construction of ceiling decoration, waterproofing, floor heating and protective layer is completed, it is planned to enter the site next week to blow the second floor putty.
② Building M11:The floor heating and protective layer are finished, and the waterproof construction is completed by 60%. Next week, it is planned that the suspended ceiling team will enter the site to complete the construction of 1 unit and 1 floor, and waterproof the second unit and floors 6-8.
③ Building ③ 3m 1 2: After the completion of floor heating and protection decoration, it is planned that the ceiling team will enter the site for construction next week 1 unit1floor.
④ Building ④m 13: 1 Unit 2-7 floor decoration, floor heating, protection and ceiling have been completed. Next week, it is planned to complete the construction of floors 8-9 of 1 unit, and the waterproof construction of floors 1-3.
B 1C 1 area (remaining 1 10 sets)
Facade: 95% completed;
Living room and bedroom: ceiling, wall decoration and floor tiles are completed 85%; Bedroom: the construction of putty, floor tile and aluminum alloy window is completed;
Kitchen: ceiling, wall and floor tile 75%, hanging cabinets and sanitary ware hardware10%; Toilet: 75% of ceiling, wall and floor tiles are completed, and kitchen cabinet construction10%; Outdoor landscape: 95% completed;
B2C2 area
Facade: the main structure of C2 area is completed, masonry is completed, the roofing project is about 90%, indoor backfilling is about 80%, external wall putty is completed, and external wall latex paint is 85%;
In B2 area, the main structure is completed, the masonry is completed, the roofing project is about 80%, the external wall plastering is completed, the external wall putty is 90%, and the external wall latex paint is 85%.
Living room: wall plastering project completed;
Bedroom: wall plastering is completed;
Kitchen: wall plastering is completed;
Toilet: wall plastering is completed;
Outdoor works: F and N series sewage pipes are buried, and K series sewage pipes are buried by 30%.
Hydropower situation of the project:
The final delivery time is subject to the on-site progress and the notice of repossession, and the service life is long, and only your special needs are taken care of in this season. Tengchong Enlightened Double-Creation Snow and Ice Town, and the letters from home spread well!
With your understanding and trust, ingenuity and dedication, we will show the progress of the project more comprehensively at the end of each month and broadcast the latest information for you.
Di qi bing Xue townlet
on sale
Reference price: The reference average price is 5800 yuan/m2.