The job content refers to what kind of work or content the laborer is engaged in, and the labor obligations that the laborer should perform are the main contents of the labor contract, including the type of work, post, scope of work, tasks, job responsibilities, labor quota, quality standards, etc. The work content clause is one of the core clauses of the labor contract. The following is the contents of the supervision engineer's inspection that I helped you sort out. Welcome everyone to learn from and refer to. I hope it helps you.
Work content of inspection
Patrol is a regular or irregular supervision activity carried out by supervisors on the site for the parts or processes under construction, and it is the daily procedure of supervision work.
1. During the quality inspection and control of partial projects and processes during the construction process, the supervisors must conduct daily patrol inspection of the working area under construction. The chief supervision engineer must regularly organize various professional supervisors to carry out comprehensive net-pulling patrol inspection as planned, thus forming an institutionalization.
2. The main contents of on-site patrol inspection are as follows:
(1) Whether the construction is carried out according to the design documents, construction specifications and approved construction scheme;
(2) Whether qualified materials, components and equipment are used;
(3) Whether the construction site management personnel, especially the quality inspection personnel, are in place;
(4) Whether the technical level and operating conditions of construction operators meet the requirements of process operation, and whether special operators hold relevant certificates;
(5) Whether the construction environment has adverse effects on the project quality;
(6) Whether there are quality defects in the construction site.
3. Supervisors shall truthfully record the daily patrol inspection in the supervision diary of the day, and there shall be no omissions or omissions, so as not to cause serious quality problems or quality hidden dangers. Photographs, photography and other means should be used for recording.
4. The notice of the supervision engineer shall not only record the found engineering quality or construction safety problems, but also be sent to the construction unit for signature and reply in time. The important issues should also be copied to the construction unit.
5, to check out the important problems in accordance with the provisions, tracking and monitoring, record for the record.
parallel test
Parallel inspection refers to the engineering quality inspection activities independently carried out by supervisors in a certain proportion by using certain inspection or detection means on the basis of self-inspection by the construction unit. Parallel inspection embodies the independence of engineering supervision and the scientific nature of work, and is also the requirement of management specialization.
1. The inspection, test and reinspection of materials, components and equipment on the construction site shall be carried out according to the sampling scheme specified in the construction quality acceptance specifications of various disciplines and the way agreed in the contract, and a report shall be prepared according to the test site and data, which shall be included in the supervision file.
2. The inspection and test of the inspection lot of subdivisional work shall be carried out in parallel according to the contents and standards of construction quality acceptance specifications of various disciplines, and recorded in the supervision files. The sampling number of inspection lots shall not be less than 20% of the total number of inspection lots of this sub-project
3. Sampling inspection, visual quality inspection and evaluation of divisional projects and unit projects related to structural safety and functional testing. Should comply with the "unified standards for construction quality acceptance of building projects" and the requirements of the contract. The test results are recorded and filed in the supervision file.
4, the acceptance of concealed works should be in accordance with the relevant provisions of the relevant construction drawings and professional construction quality acceptance specifications for the necessary inspection, testing, and according to the actual records, classified as supervision files.
5. If the parallel inspection finds unqualified engineering parts, the supervisor shall not review and sign the quality control data of the corresponding engineering parts of the construction unit, and notify the construction unit not to continue the construction of the next working procedure.
6. Supervisors must sign the parallel inspection records and be responsible for their authenticity.
Extended reading: the key points and skills of supervision and inspection
A, patrol inspection plan and arrangement
To do a good job of on-site inspection, we must make corresponding preparations and plans, achieve "targeted" and achieve the expected results.
1, patrol preparation
(1) Be familiar with design documents and relevant laws, regulations, rules and regulations, standard drawings, local regulations and requirements, etc. , so that it can be well documented;
(2) Be familiar with the situation of the construction site, especially the current construction site and content, and understand the key points of the planned inspection tour. Such as: winter patrol to check the implementation of winter construction scheme, summer patrol to check the maintenance and effect of cast-in-place concrete structure, etc.
(3) Prepare patrol inspection tools, such as carrying common measuring tools, digital cameras and necessary safety supplies. Take photos of quality and safety problems or hidden dangers found on site in time and keep original records.
2, the scope of the inspection tour
(1) The quality of the completed inspection lot, subdivisional work and divisional work;
(2) the operation of the construction face;
(3) The mobilization, manufacture, processing and use of engineering materials/components on the construction site, as well as the quality inspection and inspection of the mobilization engineering materials. Dynamic control;
(4) the use and maintenance of mechanical equipment and safety facilities on the construction site;
(5) Safe operation and civilized construction of each operation surface on the construction site;
(6) Protection and utilization of engineering reference points, control points and environmental inspection points.
3, patrol work arrangement
(1) Division of labor and cooperation of personnel in the supervision department
The project chief supervision engineer should fully understand the professional expertise and horizontal ability of all members of the project supervision organization, and then arrange the inspection objectives and contents reasonably according to their respective professional expertise and horizontal ability.
(1) The inspection of engineering quality, engineering materials/components/equipment shall be conducted by the supervisor/professional supervisor;
② Patrol inspection of safety supervision shall be conducted by full-time safety supervision personnel;
(3) Strengthen information communication, intercommunication and mutual cooperation within the supervision department, so as to achieve clear division of labor, unity and cooperation, and avoid "blind areas" and "misunderstandings" in the work, resulting in missed inspection of the project and avoiding loopholes in the construction.
(2) Selection of patrol inspection route
Patrol inspection should not be aimless "wandering" or "browsing", but should plan the patrol route in advance to ensure that the patrol monitoring covers the business scope of project quality, progress, safe and civilized construction, investment control and so on, so as to carry out patrol inspection with purpose and pertinence.
(3) arrangement of inspection time and frequency
A conduct on-site inspection in time after work every day. In case of abnormal conditions such as strong wind and rainstorm, the site should be inspected in time according to the actual situation, so as to control the site situation as soon as possible, find problems and solve them in time;
B, for the completed inspection lot, disciplines, division of the project must be timely patrol inspection, to ensure that all completed inspection lot, disciplines, division of the project after at least one patrol inspection;
C, for the working face under construction (including safety), according to the importance of its parts and the difficulty of construction, check at least once or twice a day (once in the morning and once in the afternoon);
D. Supervisors should check at least once a day the quality inspection of the main engineering materials entering the site and the products entering the site, especially the engineering materials that affect the safety and use function of the engineering structure, such as cement, sand, stone, steel, bricks, concrete blocks and waterproof materials.
Second, the patrol inspection content
1, raw materials
Focus on checking whether the procurement and stacking of raw materials/components on the construction site meet the requirements of the construction organization design (scheme): whether its specifications and models meet the design requirements; Whether to witness the sampling and pass the test; Whether it has been reported to the supervisor for acceptance according to the procedure and allowed to be used; Whether to use unqualified materials, materials with insufficient quality certification materials, etc.
2. Construction personnel
(1) Whether the management personnel in the construction site, especially those in key positions such as quality inspectors and safety officers, are in place and qualified, whether their internal cooperation and work coordination are normal, and whether they can ensure the timely implementation, stability and effectiveness of various management systems and quality assurance systems;
(2) Whether the special operations personnel hold relevant certificates, whether the witness certificates are consistent, and whether the corresponding education and training, safety technical disclosure and records have been made;
(3) Whether the on-site construction personnel organization is sufficient and reasonable, whether it meets the requirements of the time limit for a project plan, and whether the construction is carried out in accordance with the approved construction organization design (scheme) and design documents.
3, construction machinery
Inspection key points: whether the entry, installation, acceptance, storage and use of mechanical equipment meet the requirements and regulations; Whether the quantity and performance meet the construction requirements; Whether the operation is normal and whether there is any abnormality.
4. Earthwork excavation of deep foundation pit
(1) Whether the preparatory work before earthwork excavation is in place and sufficient, whether the excavation conditions are available, and whether the mechanical equipment configuration is appropriate;
(2) Whether the sequence and method of earthwork excavation are consistent with the design working conditions, and whether it meets the requirements of "slotting support, first supporting and then digging, layered excavation, and over-excavation is strictly prohibited";
(3) Whether the excavation is carried out in layers and blocks, whether the layered height and slope gradient meet the design requirements, and whether the slope treatment and shotcrete are timely;
(4) Whether the stacking load on the foundation pit edge and support meets the requirements and whether there are potential safety hazards;
(5) Whether the construction machinery collides with or damages the foundation pit enclosure and supporting structure, engineering piles and dewatering wells;
(6) If the excavator walks on the poured concrete support, do you take measures such as covering soil and laying steel plates? It is forbidden to walk and operate on the support members hollowed out at the bottom;
(7) Whether there is a special person who is responsible for repairing the leakage of the enclosure surface and the waterproof curtain and handling it, and whether it meets the requirements of the design and technical treatment scheme;
(8) Whether clods, mats and bamboo basketry attached to the bottom of each bracket are cleaned in time to avoid falling and hurting people;
(9) Whether the erection of safe passage and limb protection on each support is timely and meets the requirements;
(10) Whether the excavator is commanded by a special person and whether there is any illegal operation.
5, the construction site mixing mortar, concrete mixture ratio inspection.
(1) Whether to use the regular mixture ratio provided by qualified material testing units, it is also necessary to check whether the mixture ratio has been adjusted according to the actual water content;
(2) Whether the production and placement of the on-site mix ratio signs are standardized, and whether the contents are complete, clear and operable;
(3) Whether there is a special person in charge of measurement, whether it can achieve "measurement per board", especially whether the dosage of additives and water is strictly controlled within the allowable range, and whether the measurement records are true and complete;
(4) Whether the weighing instrument has a certificate of conformity, whether the physical evidence is consistent, whether it is qualified by the legal metrological verification department and used within the validity period, whether the use and storage are normal, and whether there is any damage or artificial disassembly and adjustment.
6, masonry engineering
(1) Whether the base is cleaned as required and leveled with fine stone concrete;
(2) Whether there is the phenomenon of intensive use of "broken bricks" and unqualified appearance quality;
(3) Whether the skin pole is used as required, whether the model, specification, size and position of the wall Rachel are correct, whether the mortar fullness is qualified, whether the mortar joint thickness exceeds the standard, and whether there are transparent joints, "blind joints" and "false joints";
(4) Whether the first layer of hollow masonry is grouted as required.
7, steel engineering
(1) Whether the steel bars are rusted, polluted by isolating agent and silt, and whether they are cleaned;
(2) Whether the specifications and dimensions of the pad meet the requirements, whether the strength can meet the construction needs, and the phenomenon that the cement mortar (or concrete) pad is replaced by useless wood blocks and marble slabs;
(3) Whether the lap length, position and connection mode of steel bars meet the design requirements, and whether the stirrups in the lap section are "encrypted" as required; For the "core area" of beam-column or beam-column intersection, is there any phenomenon such as main reinforcement being cut off and stirrup missing?
8, template engineering
(1) Whether the installation and removal of the formwork meet the requirements of the construction organization design (scheme), whether the load-bearing formwork with special requirements has been demonstrated by experts, and whether the hidden contents before mold sealing have been accepted by the supervisor;
(2) whether the template surface is clean, whether there is deformation and damage, whether it is coated with isolation agent, whether the template flat-fell seam is tight, and whether the installation is firm;
(3) Whether the form removal is reported to the supervision engineer in advance according to the procedures and requirements and signed by the supervision engineer, and whether there are illegal and risky behaviors in the form removal; Whether the binding, hoisting and stacking of formwork meet the requirements.
9, concrete engineering
(1) Whether the protection of cast-in-place concrete structural members meets the requirements, and whether stacking and trampling are allowed now;
(2) Whether the dimensional deviation of concrete members after form removal is within the allowable range, whether there are any quality defects and whether the repair treatment meets the requirements;
(3) Whether the maintenance measures of cast-in-place components are effective, feasible and timely.
(4) Whether all kinds of embedded reservations are made according to the size, position and size required by the drawings.
10, steel structure engineering
Main inspection contents: whether the processing conditions of steel structures are qualified (such as site, temperature, mechanical properties, etc.). ) and whether the installation conditions are met (such as whether the foundation has been accepted, etc. ); Whether the construction technology is reasonable or not, and whether it complies with relevant regulations; Whether the processing, welding, assembly, installation and painting quality of raw materials and components of steel structure meet the design documents and relevant standards and requirements.
1 1, roofing engineering
(1) Whether the base is smooth, firm and clean;
(2) whether the overlapping position, width, construction sequence and construction technology of waterproof coiled material meet the requirements, and whether the ends, nodes and details of coiled material are qualified;
(3) the quality of roof block lap and paving, and whether there is any damage, etc.
12, Decoration Project
(1) Whether the primary treatment is qualified, whether the vertical and horizontal control lines are used as required, and whether the construction technology meets the requirements;
(2) Whether the parts and contents that need to be concealed are submitted for inspection according to the procedures and passed the acceptance;
(3) Whether the detail production, installation and painting meet the design requirements and relevant regulations;
(4) Ask each major whether the insertion process is reasonable and whether there is mutual pollution and destruction.
13, installation works and others
Focus on checking whether the construction is carried out in accordance with specifications, procedures, design drawings, atlas and construction organization design (scheme) approved by the supervisor; Whether there is a responsible person, whether the construction is normal, etc.
14, safe and civilized construction
(1) Whether all emergency rescue plans are feasible, approved by the supervisor and fully prepared;
(2) Whether there are potential safety hazards in the construction site and whether there are illegal operations in various constructions;
(3) Whether the safety system and facilities are complete, effective and sufficient, and whether the relevant safety inspections and records are true and timely.
15, construction environment
(1) Whether the construction environment and external conditions adversely affect the control of project quality, safety, progress and investment, whether the construction unit has taken corresponding measures, whether it is safe, effective and in line with regulations and requirements, etc.
(2) The setting and protection of various benchmark control points, the surrounding environment, whether the monitoring points of the foundation pit itself are normal, whether there is pressure loss, whether someone cleans and restores the damaged monitoring points, whether it can be completed in time, whether the monitoring work can be carried out normally, etc.
Third, the problem handling
During the patrol inspection, the supervision engineer shall timely notify the relevant personnel of the construction unit to carry out rectification according to the time, place, nature and severity of the problems found (some problems can be pointed out face to face on the spot) or in written form (with original records such as photos taken on site when necessary); If the construction is not carried out according to the drawings, the materials have not passed the inspection or are used without authorization, or there are other serious hidden dangers, which may cause or have caused safety and quality accidents, after reporting to the construction unit, the engineering shutdown order shall be issued in time, requiring the construction unit to stop work and rectify, so as to prevent the occurrence or expansion of safety and quality accidents. And track the supervision and handling situation until the re-inspection is qualified, and record the related problems and handling situation in the supervision diary and other documents. Preparing for the handling and verification of related problems not only provides rich and detailed reference materials for the regular meeting of project supervision and the next on-site inspection, but also provides favorable evidence for the settlement of construction claims in the future.
Fourth, pay attention to the problem.
(1) For the problems found in the patrol inspection, the original records shall be kept by taking photos, videotaping and sealing the original.
(2) Pay attention to work efficiency and quality. Problems that can be solved immediately at the scene must be solved in time, and those that cannot be solved for some reason should also have a sense of time and be solved within a time limit to avoid irresponsible delay and affect work and coordination.
(3) Pay attention to the working attitude and methods to solve problems. Once a problem is found, it is forbidden to fly into a rage, blow your beard and stare, make a loud noise, or even insult each other's personality and reputation, resulting in emotional opposition and intensified contradictions between the two sides. Not only can it not solve the problem, but it will disturb the overall situation and make the supervision work fall into a "passive and embarrassing" state.
(4), to have a scientific attitude and spirit, insist on using data to speak, for things not people. Don't be in a hurry to express your position on uncertain issues, but pay close attention to familiarity, research, targeted decision-making, statement or notice, and avoid specious, "possible" and "maybe" tone.
(5) At all times, supervisors must always keep in mind the concept of "long-term planning, quality first, safety first", strictly enforce the law, do their duty, avoid ignoring principles and standards, and adopt a "smooth" style.
;