Please click to enter a picture description.
Then, after the base surface is allowed to stand for about 3 ~ 4 days, it will be segmented, and at the same time, the standard points of the surface layer will be attached to control the surface smoothness.
Please click to enter a picture description.
three
Then, the mixture of tile glue and water is stirred evenly with a low-speed electric stirrer to form a paste, and the mixture is smeared on the wall surface, and then a rock slab is laid on the paved tile glue base surface. Finally, tamp and smooth the rock slab with a rubber hammer.
Please click to enter a picture description.