Among them, "construction project cost management" and "construction project pricing" are basic subjects, and the basic system and content of project cost management, the composition of project cost and the basic pricing basis are examined. "Building Engineering Technology and Measurement" is a professional discipline, which examines engineering geology, engineering structure, engineering materials, construction technology and other professional technologies; Case analysis of construction project cost is a comprehensive applied discipline, which examines the ability of candidates to comprehensively apply the knowledge of the first three disciplines to analyze and solve practical problems of construction project cost.
There are multiple-choice questions, multiple-choice questions and case analysis questions in the first-level cost engineer examination, among which there are many calculation questions. Specifically, the exam topics of "Construction Project Cost Management" and "Construction Project Valuation" are 60 multiple-choice questions, each with 1 point; 20 multiple-choice questions, 2 points for each question, total score 100. The examination questions of Building Engineering Technology and Measurement are different. Candidates majoring in civil engineering, water conservancy and transportation are required to complete 60 multiple-choice questions, each with 1 point; 20 multiple-choice questions, 2 points for each question, with a total score of 100; Installation professional candidates need to complete 40 multiple-choice questions, each with 1 point; 20 multiple-choice questions, each with 1.5 points; Choose 20 questions, each with a score of 1.5 and a total score of 100. The course of "Case Analysis of Construction Engineering Cost" will set different numbers and scores of case questions according to different majors, including 5 courses in civil engineering, with a total score of120; Installation and water conservancy, with a total score of120; There are 7 transportation majors, with a total score of 120.
Generally speaking, the first-level cost engineer examination covers the basic system and content of project cost management, the composition and valuation basis of project cost, engineering technology and measurement, and examines the practical application ability of candidates through case analysis. There are multiple-choice questions, multiple-choice questions and case analysis questions, among which there are many calculation questions. Candidates need to fully grasp the relevant knowledge and skills in the preparation process and answer questions in strict accordance with the examination requirements in order to successfully pass the first-class cost engineer examination.