1 personnel
The files are incomplete, the training plan is flawed, the training record information is incomplete, and the personnel authorization and technical ability confirmation are insufficient.
2 equipment
Equipment management is easy to find problems. Including equipment files, equipment calibration and result confirmation, equipment identification, equipment maintenance records, verification after maintenance, periodic verification, etc.
3 materials
Detailed implementation rules and quality acceptance records of material procurement supplier evaluation and quality acceptance. Quality management of laboratory water.
4? way
The updating of method standards, the comprehensiveness of method verification, the management of new methods and new projects, and the scope of application of methods.
5? environment
Environmental monitoring, environmental compliance with the requirements of methods and standards, environmental interference and environmental pollution.
6 quality
The whole process of quality control, sampling and testing process, various quality control means, quality control plan, quality control evaluation and capability verification.
Get used to reading the guidelines carefully and do everything well according to them. Read the methods and standards carefully, and implement everything according to the standards.