Annual Work Summary of Equipment Maintenance Workers Part I
20x has been engaged in electrical work in X series since he joined the work in June. Among them, from June 60x 65438 to June 20x68, the power supply and maintenance of electrical equipment and facilities of Project X; From June of 20x to June of 20x, power supply and electrical equipment and facilities maintenance of Project X; I started working as an electrician in X in June, 20x. In 20x years, he obtained the professional qualification certificate of senior electrician.
Over the years, with the help and guidance of teachers, colleagues and leaders, my professional knowledge and maintenance technical level have been greatly improved through continuous study and work practice. I have successfully completed the work of this post and made some achievements. The work in the past few years is summarized as follows:
First, work actively and conscientiously complete the tasks assigned by the leaders.
Company X is a professional team focusing on geotechnical engineering construction, and its construction features are large capacity of electrical equipment, many electrical equipment, short construction period and open-air operation. Electricians are responsible for the selection, layout, arrangement, installation, inspection, maintenance, demolition and electrical maintenance after construction.
Through years of electrical construction work, I can successfully complete the selection, layout, arrangement, installation, inspection, maintenance and dismantling of electrical equipment in large-scale construction projects in strict accordance with the requirements of the organizational design of construction electricity consumption and the Technical Specification for Temporary Electricity Consumption in Construction Sites, and participate in the compilation of the organizational design of temporary electricity consumption in several projects, so that all construction projects can meet the national technical standards for temporary electricity consumption safety.
Such as: x path, x path, etc. During the construction, we worked actively, strengthened on-site construction electricity management and safety education, conscientiously implemented post operation procedures, and abided by various electricity safety management systems. In the construction projects we participated in, there was no electrical injury and electrical equipment accident, which created good social and economic benefits.
Second, pay attention to continuous learning and strive to improve their professional knowledge and level.
After taking part in the work, I continued to participate in the school and society, and learned the knowledge of electrical engineering, building construction and safety technology through self-study, and constantly improved my professional knowledge and business level.
The main technical learning and training are:
1, September 20x-July 20x; _
2.20x years165438+1October -20x years 65438+February; _
Through continuous study, I have mastered the professional knowledge of electrician foundation, electrician technology, power supply in the factory, technical specification for temporary electricity use on the construction site, construction safety technology, construction safety management and so on. My safety knowledge and awareness have been greatly improved, and I have continuously applied the knowledge and technology I have learned to production and construction.
Due to the different types of pile foundation, there are various mechanical equipment used in geotechnical construction, such as mud-protected bored pile drilling rig, long spiral bored pile drilling rig, prefabricated pile hydraulic press and so on. Mixers, dosing machines and delivery pumps for concrete mixing and conveying; It is the electrician's duty to do well the maintenance and electrical overhaul of butt welding machine and electric welding machine for steel bar welding. Pile foundation construction is a coherent process. If there is any problem with the electrical equipment of the drilling rig during grouting, it must be repaired as soon as possible to ensure that the drilling grouting is completed before the initial setting of concrete. Through years of study and practice, the fault source can be found in a short time and repaired well. Over the years, we have repaired a large number of building electrical equipment to ensure the normal construction of geotechnical engineering projects.
Third, pay attention to technological innovation to achieve safety and energy saving.
In recent years, the company has continuously encouraged technicians to carry out technological innovation in production and technology. According to the stipulation that AC electric welding machines should be equipped with electric shock protectors on the secondary side in the Technical Specification for Temporary Electricity Use in Construction Sites, I made a suggestion to the company at the end of 20x, and the company quickly replied to and popularized the welding special switch box for electric welding machines supervised by the safety supervision station, which not only implemented the Technical Specification for Temporary Electricity Use in Construction Sites, but also made great achievements in safe electricity use and energy saving.
In the process of construction, the electrician operation team constantly carries out technical innovation and transformation on the electrical system of the equipment. For example, in the X-way project in August of 20x, the electrical system of the X-way distribution box purchased by our company in 20x is obsolete, and the static and dynamic contacts of contactors are often damaged. After research, the electrician operation team of our company found out the problem, and completely updated the distribution box of the long auger during the construction interval, so that the equipment began to run normally, the electrical troubleshooting rate was reduced, the construction efficiency was greatly improved, and the project was successfully completed within the planned construction period. After the construction of each project, the company will organize electrician technicians to maintain electrical equipment and facilities. Over the years, I have participated in the maintenance of many electrical equipment and facilities, straightened out the power lines of equipment and replaced unqualified electrical facilities. It has made positive contributions to the company's safe production.
Fourth, actively teach technology, and pass on the knowledge and skills accumulated in technology and production practice to new employees without reservation.
In the usual work, I often have technical discussions and exchanges with other employees, share what I have learned with everyone, and learn what I don't know from others to make progress together. Under my guidance, two electricians of X Company passed the examination and obtained the post qualification of senior engineer, and were able to independently complete the electrical maintenance tasks assigned by their superiors. Three electricians passed the examination and obtained the post qualification of intermediate engineer, which can basically complete the task of electrical maintenance, effectively alleviating the tension of the shortage of electricians in construction engineering.
Five, strengthen the education of workers' safe use of electricity and energy saving, and constantly improve the awareness of workers' safe use of electricity and energy saving concept.
In recent years, while doing my job well, I have continuously strengthened the education on the safe use of electricity and energy saving and consumption reduction for employees, made full use of my spare time to walk into the construction team and dormitory to explain the knowledge of safe use of electricity and energy saving and consumption reduction, and organized the publicity of "Question and Answer on Safe Use of Electricity in Construction" and "Energy Saving Week". So as to improve the safety knowledge of employees and save energy consciously.
Sixth, correct attitude and make active efforts.
Over the years, I have always kept in mind the firm belief of "safety first, hard work". I am a * * * party member, a senior technical worker in electrical maintenance, and I must not be slack in my work. Only when I seriously abide by and implement the rules and regulations on production safety, study hard and work hard can I put an end to power accidents and realize safe construction, and can I be worthy of the training and education of the party organizations and leaders for many years.
The acquisition of all these honors is an inspiration and spur to my work. I will continue to strengthen my study and learn from each other. Only in this way can I keep up with the pace of the times, make steady progress, and better serve the unit and society.
Annual Work Summary of Equipment Maintenance Workers Part II
I started my internship in the maintenance department of shell factory, and it has been more than two years since I graduated from Metallurgical College in July of X. During this period, I worked hard. From an ignorant student youth, he has gradually grown into a little "master" who knows a little about mechanical maintenance, maintenance and safety.
During my work and study in the company, I abide by the company's rules and regulations every day. Never arrive late and leave early, seriously accept the teachings of the masters and actively learn various maintenance techniques. Now through more than two years of study, I have been able to independently judge the maintenance of equipment when I encounter minor problems. For example, the tool rest replacement of Shenyang Six-axis, the parts replacement of gearbox, including more difficult secondary maintenance, and the replacement of spindle bearing can all be operated independently. I can also coordinate with the masters to solve major equipment problems. For example, the gear replacement on the cutting and upsetting machine, the replacement of cold extrusion crankshaft bushing, and the key matching work of Shenyang six-axis distribution shaft. It has been well received by leaders and masters.
10 June, X, transferred to Shell No.2 Factory to continue the maintenance work, and started a new work course on the new work platform. Here, I not only do my own maintenance work well, but also come into contact with the knowledge about mechanics. Such as various equipment reports, safety knowledge, equipment spare parts inventory and planning. In addition, the most important thing is to start the transformation and digestion of equipment. There is still a Delphi six-axis in the process of digestion, and I believe it will be digested by the end of the year. In addition, because the equipment consumption of the top cutter is too high, I am also actively participating in the commissioning of the new Dan Chong purchased by the company. By then, the company will completely get rid of the bad production environment of high consumption and high cost of the top cutter. Moreover, the company is about to produce Outlett screws now, and the output will be several times, so the screw equipment will be very tight. So now actively participate in the debugging and transformation of screw equipment, and lay a solid foundation for the future.
In addition, I would like to put forward some simple views on some equipment management of shell factory:
One: As we all know, "If a worker wants to do a good job, he must sharpen his tools first. If he wants to improve the output and product quality, he must adjust the equipment to this state. However, some of these devices have some problems. For example, the feeding and pressing structure of Delphi integral screw machine can be directly controlled through the operation panel, and the operator sometimes does not need the feeding mechanism to feed when adjusting the equipment. At this time, the operator only needs to press a button, which is simple and convenient to operate and saves time and raw materials. The feeding mechanism of Antuo integral screw machine is mechanical. If the operator does not need to feed, he must go to the end of the equipment to loosen the screw, and then tighten the screw after adjustment. But it often needs to adjust the product model many times, which wastes a lot of time. If you do not loosen the screw and adjust it directly, it is easy to crush the mold. It is really not worth the loss. The equipment actually has this function, but it doesn't work after a long time, so as long as you add controls similar to Delphi equipment, you can save a lot of adjustment time and mold cost for Antuo equipment.
Two: Our company's current maintenance system is a centralized maintenance system, and the maintenance department is responsible for the equipment maintenance of the whole factory. The operator will not help the maintenance worker, and the maintenance worker will not help the operator to look after the bed. This system is most prone to buck passing, and problems cannot be handled in time, which affects maintenance efficiency. Therefore, the first thing we have to do is to break "operators only care about operation, regardless of maintenance;" Maintenance workers only care about maintenance, regardless of the habit of operation; Instead, we should guide everyone to do it: operators should not only take the initiative to clean the equipment, but also take the initiative to take part in the troubleshooting of the equipment. Combined with the point inspection, maintenance and lubrication of the equipment, they should actively check and maintain the equipment while cleaning and improve its condition. Because a large number of equipment failures are due to the failure of maintenance and lubrication work. For example, there are many six-axis equipment in Shenyang, and the spare parts of the equipment are expensive (it costs thousands of dollars to change the spindle bearing). However, the operation of Shenyang six-axis is basically the transmission between cam and gear, and the parts are greatly worn, so the lubrication work is particularly important. Therefore, it is recommended to clean the oil circuit every weekend. If handled properly, the cost of spare parts for our equipment will be greatly reduced.
Thirdly, it is suggested that the computer management of equipment account can be established, just like turning on the computer at any time can see the product model, quantity, shortage and so on produced by which equipment in the month at any time. Computer management of equipment account is to randomly check the factory number, equipment name, equipment model, equipment specification, manufacturer, putting-in-service time, user, etc. Check all the equipment of the company, and check the usage of each equipment at random. When troubleshooting machine tools, maintenance personnel should fill in the "Equipment Maintenance and Troubleshooting Registration Form" to register the reasons, troubleshooting methods and spare parts used. All kinds of troubleshooting, as well as the troubleshooting time, the approval of the person in charge and the operator should be carefully filled in and signed, just like the management of the company now. Rather than a simple equipment maintenance record. This is not only the assessment of maintenance personnel, but also an important basis for finding out the law by year-end fault statistics. This will help us to sum up the maintenance experience of machine tools in time, classify faults and make statistics, which will be of great help to sum up the experience for spare parts ordering and maintenance in the future.
Annual Work Summary of Equipment Maintainers Part III
20 1x years have passed in busy and orderly work. Looking back on this year's work, I think there are two main aspects:
First of all, make your own work guidelines:
1, so that every job is operated according to the safety standard process to prevent safety accidents;
2. Visit the store at least once a month, communicate with the store management in time for the problems found in the inspection, solve them directly on the spot, and feed back the problems raised by the store to the department leaders in time, do the work that needs to be done well in the shortest time, find them in advance and solve them quickly, so as to nip in the bud;
3. Adjust the circuit decoration work of the shop, make plans in advance, prepare materials, resolutely not delay the shop decoration, and ensure high-quality and efficient completion of the work;
4. Communicate with the store by telephone in view of the sudden problems of electricity facilities, initially estimate where the problems are, and lead relevant personnel to prepare related objects and tools so as to quickly troubleshoot after arriving at the scene;
5. Adhere to the principle of saving: try to repair the damaged items in the store without replacing them with new ones, choose the ones that really need to be replaced with high quality and low price, and collect and sort out all kinds of reusable materials (such as plugs, etc.). ) for reuse;
Second, the main work in the past year:
The main work in June 65438 was the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket. In a month's time, I took the initiative to take the lead, carefully studied with my colleagues in the equipment department, strictly laid out the layout and standardized the construction, and ensured that the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket were completed on time and with good quality.
In February, the main work was the renovation and opening of major appliances in Xin 'an Shopping Plaza. Due to the tight time, there are many places where home appliances need electricity, and it also involves the layout and construction of brands and booths. According to the company's requirements and workflow, we worked overtime and strictly constructed, so that all the electricity facilities were successfully installed and the water test was successful at one time, which made preparations for the smooth opening of home appliances in Xin 'an Shopping Plaza on May 1 day.
From March 6 to September, it was mainly the renovation adjustment of the East Building of the head office and the preparation for the opening of Zhuoting Supermarket. The reconstruction of the East Building of the Head Office is this year's project, involving many facilities and heavy workload. The replacement of escalators, the adjustment of circuits, the decoration of suspended ceilings, the follow-up of the decoration of various characteristic pavilions, and the arrangement and follow-up of electricity consumption in characteristic pavilions all require equipment. So I have to work overtime every day for three months, but I am not intimidated by fatigue and workload. I carry forward Nakazawa Tomohide's spirit of not being afraid of hardship and tiredness, work actively and conscientiously, and complete all the tasks assigned by the company with clear thinking, and make my own contribution to the decoration of the East Building of the head office.
In September, with the renovation of the East Building, there were preparations for the new store Zhuoting Supermarket. Originally, the equipment department was understaffed, and the stores near the Mid-Autumn Festival were busy, so there was no staff to be transferred. Facing the work, we have a group of equipment people who are not afraid of difficulties and prepare all the equipment needed for opening in time in strict accordance with the company's requirements. For facilities that need electricity, from the lighting of the main light strip to each socket that needs to be used, the installation of UPS and the electricity construction of tenants are carefully put in place. After unremitting efforts, we successfully completed the transformation of the East Building and the opening of Zhuoting Supermarket.
The main work after 4.9 months, in addition to the daily shop patrol, part of the maintenance work that shops need is to make a statistical summary of the water pipes that need to be insulated in winter in advance, and handle all the water pipes that need to be insulated in each shop to prepare for winter. Another major task is to sort out idle equipment. All the idle shelf equipment and accessories are concentrated in Liuhuapo's equipment warehouse, and everything is sorted out for standby.
In the new year, we will continue to carry forward the spirit of Nakazawa Tomohide, strictly abide by the company's safety operation norms and various management regulations, and complete all the work in a timely, safe, efficient and economical manner under the guidance of leaders.
Chapter IV Annual Work Summary of Equipment Maintenance Workers
In the busy work, 20x years passed quickly. In a year's time, with the care and help of leaders and colleagues, I have given full play to my work skills, and my work and business level have made great progress through my continuous efforts. Continuously improve working methods and improve work efficiency. Summarize the past and learn good work experience. Let me sum up all the work in the past 20x years.
1, working conditions
Our main job is to cooperate with maintenance, emergency rescue, spare parts collection, or clean up the garbage, scrap steel and old spare parts left over from on-site production and maintenance. Can complete the tasks assigned by the leader, check spare parts quickly and safely, and clean up. Sometimes equipment maintenance can cooperate with maintenance work with heart. When the equipment maintenance is busy, most of them are fighting at work for more than 0/4 hours a day. Because the car use plan is not standardized and the demand is tight, they have to run back and forth in the workshop hundreds of times every day, sometimes it takes a long time to fix it, and they can't rest after working overtime. In addition, my car is noisy, the cab temperature is high and the heat dissipation is poor, so the whole person is like taking a bath. Moreover, under the working environment of narrow road surface and poor road conditions in our workshop, we all have no complaints, can treat them correctly, work hard and complete various tasks seriously.
2. Security aspects
At work, we can consciously and strictly demand ourselves, consciously abide by labor discipline and safety operation rules, seriously study traffic regulations, and strictly abide by traffic regulations and factory rules and regulations. Earnestly complete their own work, so as to achieve the safety production policy of sounding the alarm, putting safety first and putting prevention first. It plays a preventive role. There were no illegal accidents and no duty throughout the year. Under the condition of ensuring driving safety, we have achieved: study hard and constantly improve safety quality. As a driver, I try to make the motor sound, concentrate, turn the steering wheel and pay attention to safety. Although the driver's job is monotonous, he needs a strong sense of responsibility and cannot be careless when driving. He should concentrate on driving a good car, always want to be safe, prevent accidents everywhere and be safe.
3. Respect discipline and discipline
Strictly abide by the rules and regulations formulated by the company, do not fight, steal, do anything that will damage the corporate image, respect leaders, unite colleagues and work hard. Concentrate on work, do not violate labor discipline and factory rules and regulations, take the factory as the master and safeguard the interests of enterprises.
4. Main problems and next steps.
I. Main issues
1, lack of serious work, lack of initiative, and little understanding of unsafe factors in the workshop.
2. Due to the poor road conditions, narrow roads and many intersections in our workshop, there are overspeed behaviors caused by unsafe factors.
3, vehicle maintenance, maintenance, repair and other work is not in place.
Second, the next step.
1. In the new year, we have to deal with the production of two engines, which is twice as busy as this year. Then we must do our job well, do not overspeed, overload and other illegal acts, ensure safe production, and strengthen the maintenance, inspection, repair and maintenance of vehicles. Only good maintenance can ensure safe driving. It brings favorable conditions for the needs of production and maintenance.
In the new year, we should study the traffic laws and regulations harder and strengthen our self-safety awareness. We should correct our shortcomings, unite as one, do our own work well, strive to better complete the tasks assigned to us, and strive for a higher level of military work.
Chapter V Annual Work Summary of Equipment Maintainers
Since I took up my post, I have been constantly strengthening my self-cultivation, striving to improve my ideological and moral level, earnestly studying various cultures and professional knowledge, constantly exploring new knowledge, pioneering and enterprising, actively carrying out all the work within my intellectual scope, fully performing the duties of technicians and playing a good role as an example. Taking an active part in technical exchanges and scientific and technological innovation activities, Dida has done a good job of passing on, helping and leading, and fully completed various tasks and indicators assigned by superiors, which has played its due role in the company's production development. I will summarize my professional and technical work since I took office as follows:
First, consciously strengthen theoretical study and strive to improve personal quality.
Without a firm and true political direction, there will be no positive guiding ideology. In order to constantly improve my political and ideological quality, I have been paying close attention to national affairs and domestic and international situations in recent years, analyzing the impact of changes in the situation on enterprises, and putting this idea into practical actions in the production process to ensure that I am always consistent with the party and enterprises in thought and action. At the same time, I also bring this idea into my work and study, and constantly pursue my own progress. Some people say that if a person wants to become a talent, he must be a man first, which makes sense. In other words: if a person wants to succeed in his career, he must first learn how to be a man! Especially those who do our highly technical work, we should look at things attentively, concentrate on things and learn with an open mind. There is no room for carelessness and mistakes. First of all, we should have a correct working attitude, good professional quality, be serious and responsible for our work, obey the arrangement of leaders, listen to others' opinions and suggestions with an open mind, unite colleagues, be polite to others and serve warmly.
Second, correct working attitude and play a leading role.
Since I joined the company, I have been engaged in all mechanical and electrical affairs, including safety and quality supervision and inspection during all infrastructure construction. I am well aware of the importance of electromechanical management during construction, especially including most invisible electrical infrastructure and projects. It is necessary to supervise and inspect at any time. When you find a problem, you have to solve it. Otherwise, the future trouble will be endless and will never be eradicated. This is a test and responsibility for our electromechanical management. As the monitor of the electromechanical class, as an electrician, I am duty-bound to bear the responsibility and burden. Therefore, in the usual work, I not only ask the team members to be careful in supervision and inspection, but also know that while the iron is hot, they must be hard. I made some strict demands on myself: first, I should walk in front of the workers when I encounter dirty, tired and dangerous work, and do more and more effectively than the workers; Second, when encountering technical difficulties, we should stand up and try our best to overcome them; I always insist on doing everything well and putting the interests of the company first. Including the production process after completion, sometimes dozens of electrical equipment failures, large and small, are handled against time, which has won valuable production time for the company, laid a solid foundation for the company's development, and provided a strong backing and strong guarantee for the company to create economic and social benefits. Third, I ask myself to take responsibility; I think since I am a technician, I should be better than ordinary workers in many aspects, such as business level. When the company assigns tasks, ordinary workers should take the initiative to undertake difficult tasks, and can't shirk their responsibilities with workers. They should shoulder the burden bravely like teachers. Usually, I not only ask myself this way, but also do it according to these requirements in practice. Therefore, my performance has been well received by the company's leaders and employees, played my due role as a technician, and established a good image of technicians.
Third, strengthen business study and improve technical level.
It is my motto to be too old to learn. Today, with the continuous development of science and technology, you will fall behind if you don't study for a day. Especially electrical automation, no one can fully grasp everything. It is constantly developing and updating, just like computer software, it is updated every day and has been developing. Maybe you knew it yesterday, but it will be different in two days, and more advanced things will be put in. So I usually read more professional books as long as I have time. Over the past year, I have collected a large number of new professional books and materials, constantly enriching myself and mastering new knowledge. For example, electrical design and drawing, electronic technology, modern frequency conversion technology, DC application in industry and so on. In the process of learning this knowledge, I learned a lot of new knowledge, such as PLC programming control principle, ABB inverter setting and control principle, SIPMOS high-power bidirectional thyristor control principle and so on, which really benefited me a lot! Not only did I broaden my knowledge, but also greatly improved my technical level, which also made me interested in learning higher-level theoretical and technical knowledge.
Annual work summary, 2020 equipment maintenance worker, wrote 5 related articles:
★ Annual work summary of equipment maintenance personnel: 5 model articles for year-end summary of maintenance personnel in 2020.
★ Five short articles summarizing the annual work of machine maintenance in 2020.
★ Personal year-end summary of equipment maintenance personnel in 2020
★ 2020 maintenance work summary 5 articles
★ Five model essays on maintenance work summary in 2020.
★ The latest 2020 maintenance electrician's personal annual work summary is 5 articles.
★ 2020 equipment maintenance year-end summary report
★ 2020 maintenance annual work summary model essay
★ Model essay on personal work summary of equipment maintenance management in 2020
★ Five summaries of personal work of maintenance electricians in 2020.