Ensure a dry installation environment.
After buying the floor, you can install it after checking the quality, variety, specification and quantity. Of course, before installation, it is best to put these floors in a dry and dark place in the living room or bedroom of the new house 1-2 days, so that the water content of the floor can reach a balance with the indoor water content, which is conducive to paving.
The "expansion rate" of floor products should be well grasped.
Whether it is solid wood floor or ordinary composite floor. There is a question of' scalability'. Construction must be operated by professionals, and only installers specially trained by the manufacturer can accurately grasp the' expansion rate' of their products and install the floor properly.
In order to prevent the floor from cracking after paving, the decoration owner must pay attention to supervising the construction personnel to reserve expansion joints when paving, so as to avoid the floor from cracking and deformation when the weather is dry and humid.
After a day or two of rest.
In the renovation project, many people hope that the project progress can be faster and the project can be completed as soon as possible. Actually, this is a misunderstanding. In summer construction, it is very necessary to have a 1~2-day "rest" after each small project is completed, so as to ensure the project quality.
Within 48 hours after the floor is laid, the owner should try to avoid walking on the floor or placing heavy objects, so as to leave enough time for the bonding of the floor adhesive.
Before laying the floor? The ground needs to be dry.
Generally speaking, the ground decoration is carried out after the completion of the wall construction. Because, in the process of wall paving, it is inevitable to spray water and water indoors. Therefore, the floor laying time can be arranged as far as possible after the completion of other projects.
Before laying the floor, the owner should pay attention to the spraying (sprinkling) of water on the floor one week in advance, and try to keep the floor dry for a long time to prepare for the laying of the wooden floor. The wooden floor cannot be installed on uneven or wet ground, especially after leveling the ground. The newly paved cement floor must be completely dried before paving.
The above are the problems we often encounter when installing wooden floors. The installation of wooden floor must ensure that the environment is dry. If it is in a humid environment, it will easily lead to the decay and deterioration of the wooden floor, and the installation gap of the floor must be well grasped. It should not be too tight or over-delivered, and it is best not to trample it immediately after installation. Leave it for a day or two before use to avoid damaging the installation structure. It is suggested that experienced construction personnel must be found when installing wooden floors.