Current location - Education and Training Encyclopedia - Education and training - How long does it take to get an aerial work permit in Xiamen Lake?
How long does it take to get an aerial work permit in Xiamen Lake?
After passing the exam, the time to obtain the certificate varies from 5 days to 30 days.

There are two types of work at height: 1, and the work permit at height refers to work on high-altitude platforms, such as scaffolding and spider plants. The aerial work permit is that the human body hangs a sling to work outside. 2. The aerial work permit is a special work permit that personnel engaged in aerial erection or aerial installation, maintenance and demolition must obtain. The certificate is issued by the Safety Supervision Bureau. The work permit for climbing is to use special equipment to decorate, clean and decorate the inside and outside of the building, erect power and telecommunications lines, erect overhead pipelines, install and maintain small air conditioners, install, overhaul and maintain various equipment and outdoor advertising facilities, and dismantle high-rise buildings, equipment and facilities.

Both the Work Permit for Climbing High and the Work Permit for Working High belong to the Work Permit for Working High, and they are special work permits that must be possessed by personnel engaged in climbing erection or installation, maintenance and demolition at high altitude. This certificate is issued by the Safety Supervision Bureau, reviewed once every three years and renewed once every six years. Special operations personnel must undergo systematic safety technical training and pass the examination, and only after obtaining the special operation certificate can they work at their posts.