Current location - Education and Training Encyclopedia - Education and training - Summary of two probation periods of company oqc
Summary of two probation periods of company oqc
2 company oqc probation summary? Probation period? This is a process that every worker must go through. The following is a summary of oqc internship work. Welcome to read!

Oqc probation work summary 1

Through nearly three months' work, I have a deep understanding of the company's organizational structure, departmental responsibilities, information flow, document flow, physical logistics and capital flow, and have mastered the storage and transportation business process, job site management, work task arrangement, and peripheral business interface relations. , and has been able to integrate into the team well, and cooperate with sales, finance, warehousing service providers, transportation service providers, printing plants and so on. Complete the delivery target of the company correctly and timely.

probation work summary

1. With the assistance and guidance of the former supervisor, the third phase of the second batch of Friends of xxx and 1 & were completed from March 17 to March 24; The plan, resource organization, sorting, packaging and delivery of the fourth batch of 96,240 copies in the second phase * * * basically understand the logistics business process and interface relationship;

2. From March 24th to April 2nd, the consignment and forwarding of about 450,000 copies were completed in the fourth issue 1 batch * *, and the handover and inventory of warehouse assets (including equipment, accessories and tools) were completed. ), and 2065438+0x1&; 2, 3 inventory;

3. From April 3rd to June 5th, the second batch, 5, 6 and 7&; The eighth issue * * * is probably 17 1. Receiving, warehousing, sorting, packaging, delivery, distribution, etc. 40,000 copies, the inventory error rate of each period is controlled within the target range (the target value is 1? );

4. On the basis of historical business processes, some operations such as arrival, sorting, packaging and delivery have been improved without affecting the delivery quality, which has improved the utilization rate of inventory space, the turnover rate of inventory goods and the efficiency of sorting and packaging, and reduced the error rework rate;

5. In terms of information flow, the template integration of the scattered order information in the early stage reduces the adverse impact of information transmission errors and losses on the business, and reduces the workload of repeated confirmation between storage, transportation and market links; At the same time, the document inspection method was optimized, and the workload completed in the original 3 days was shortened to 2 days.

Follow up strategy

1. process: establish and gradually optimize the business processes of warehousing and transportation, such as planning, order processing, goods receiving, warehousing management, sorting and packaging, transportation and distribution, and customer service management. , to achieve standardization, standardization and institutionalization of related business operations, and to ensure evidence-based;

2. Personnel: establish a resource database of temporary counting personnel, temporary outsourcing personnel and related personnel through various channels, and maintain and update it regularly; Reasonably implement the post rotation system internally to reduce the impact of personnel changes on business;

3. Materials: By arranging the delivery plan more reasonably, the rhythm of arrival, packaging and delivery can be balanced, the conflict between resources and time can be reduced, and the rationality of parcel dispatching, inventory turnover rate and overall work efficiency can be improved;

4. Equipment: establish a regular maintenance system for equipment and strictly implement it to improve the availability of equipment and tools such as balers and forklifts to avoid affecting normal business development; 5. Cost: Through the analysis and comparison of historical data, reasonably adjust the packaging mode and transportation mode, reduce the use of packaging materials and consumables such as packaging tape, wrapping paper and woven bag, and reduce the cost of package transfer; At the same time, through the integration and reasonable planning of orders, the utilization rate of temporary personnel and equipment can be improved, the delivery time can be reduced, and the labor cost can be reduced.

The target value of P.S. related measures will be reflected in the detailed work plan after analyzing the historical data. Extension of job summary for employment confirmation application and probation period: What is the structural form of job summary? What does it include? Year-end summary (including comprehensive summary) or special summary, its title is usually written in two ways, one is the name of the issuing unit+time+language, such as "20xx Work Summary of Tongren Tobacco Monopoly Bureau"; The other is in the form of news headlines, such as the special summary of the credit rating management of cigarette retail enterprises by Daxing visiting and delivering department in Songtao County: "Customers compete for grades, and sales are stable with integrity".

?

Summary of Oqc Trial Work II

In 20xx, our technical quality department continued to abide by the company? Keep promises, pursue perfection, and bring expected projects and services to users? Our quality policy, earnest, pragmatic and hard work have contributed all our strength to the steady development of Ningbo Project Management Department. This year, we have overcome all kinds of technical problems, strictly implemented product quality standards, and carefully studied and applied them under the guidance of the company's refined management, which has better fulfilled the requirements of the project department for our department.

This year, our technical quality department has injected fresh blood, and the addition of new employees has brought new vitality and further strengthened the strength of the technical quality department. When the Year of the Loong comes, I will do my best to continue to be a good example and a good guide for everyone, and lead all my colleagues in the Technical Quality Department to make greater contributions to the development of Ningbo Project Department in the new year.

This year's work mainly includes Ningbo X project, Ningbo X phase II technical transformation project (including the construction and installation of new X separation unit, X tank farm and X tank farm and the technical transformation of X unit) and phase II X overhaul project, all of which have difficulties in heavy tasks and tight construction period. In particular, the X-ray unit of the X-phase technical transformation project includes a large number of large-scale equipment hoisting and process pipeline installation, which often needs to be cross-operated, and at the same time it also meets the challenge of putting into production in the first phase, and the construction process is complicated and cumbersome.

The maximum pressure of the pipeline is x3Mpa, and there are many qualified pipelines by x% ray inspection, which undoubtedly brings necessary difficulties to welding and pressure testing. In the overall coordination and continuous access to relevant information, in the serious preparation work, strictly abide by the requirements of design technical documents, formulate targeted construction organization design and various schemes in combination with the characteristics of the site environment, and continuously provide technical training and technical disclosure to workers.

On the one hand, the technical director is familiar with the construction drawings and thoroughly understands every detail in the construction drawings, so as to know fairly well. On the other hand, they carefully studied the specifications and relevant acceptance quality standards, and used these standards to guide the actual construction process on site, so that all the projects we did were qualified and stood the test. Under the guidance of the leaders of the project department and the unremitting efforts of the employees of all departments, the installation has been completed this year: the pipeline arrival coefficient 1x59, 4x sets of equipment (including x sets of non-standard equipment) and 2x sets of steel structures. 4 tons;

Civil engineering: complete the construction project of one process unit and two non-standard storage tanks and pipe gallery. At the same time, the technical department also assisted X Xing Chemical Co., Ltd. in bidding for X Food, X Project and X Expansion Project. ..

Secondly, in terms of the attention, profundity, perfection and presentation effect of the technical quality department data, I think our technical quality department has made obvious progress than before. On the basis of improving the handover data of previous projects and the technical quality control of projects under construction, the Technical Quality Department began to focus on the refined management of the company this year, seize the main line of accelerating the transformation of economic development mode, grasp the direction of becoming stronger and better, and unswervingly walk? New, special and refined? The road to strengthening enterprises and strengthening construction management.

?