The water conservancy projects mentioned in the preceding paragraph refer to all kinds of water conservancy and water supply projects managed by water conservancy departments. Article 3 The water fee standard shall be approved and levied on the basis of the water supply cost, which includes: normal maintenance of water conservancy projects, salaries and benefits of personnel, operation management, power fuel consumption, major repair costs, depreciation costs and other expenses that should be included in the water supply cost according to regulations. Fourth water charges and water charges standards of various water conservancy projects in our province are approved and adjusted by the provincial people's government.
The industrial water fee is approved according to the water supply cost, and the unified collection standard of the whole province is implemented.
Agricultural and animal husbandry water charges, water conservancy projects have been gradually put in place, water charges are gradually charged according to the cost of water supply, and engineering depreciation charges are not included in the cost of water supply; New water conservancy projects shall collect water charges according to the approved water supply cost.
Water charges for agriculture and animal husbandry shall be determined by the people's governments at or above the county level within the scope of water charges approved by the provincial government according to local conditions. Article 5 People's governments at all levels and water administrative departments shall implement the responsibility system for water conservancy project management and protection, and supervise the water conservancy project management units to collect water fees according to law. Educational water units and individuals cherish water conservancy facilities, rationally utilize and protect water resources, and pay water charges on time. Chapter II Water Fee Standards Article 6 The water fee for industrial use shall be collected by the water conservancy project management unit according to the actual water supply and collected quarterly:
(a) industrial water consumption, according to 0. 10 yuan per cubic meter;
(two) water supply (after returning to the original water supply system, there is no pollution, and the water quality can still be used for agricultural irrigation), according to 0.06 yuan per cubic meter;
(3) For water supply and power generation of water conservancy projects, it is charged at 15% of the on-grid electricity price for power generation combined with irrigation, and 30% of the on-grid electricity price for power generation without irrigation. Article 7 Water fee standards for agriculture, forestry and animal husbandry:
(1) For the irrigation system with Party A's charging conditions, the water fee shall be charged by Party A with the water inlet of the branch canal as the metering point:
1, grain crops, 2-4 kilograms per 100 cubic meters of wheat;
2, water conservancy irrigation project, according to the water outlet measurement, 2 kg per 100 cubic meter of wheat; The electricity fee for irrigation shall be charged separately by the electric power department;
3. Water for fish farming is 2-4 kilograms per 100 cubic meter of wheat according to water resources.
(two) the irrigation system does not have the conditions of charging by the party, and the water fee is charged by the mu:
1, irrigation areas over 10,000 mu and terraced agricultural irrigation areas in the Yellow River and Yellow River Basin, with an annual yield of 6- 12 kg of wheat per mu;
2, small agricultural areas in high and shallow mountainous areas and other agricultural irrigation areas, 5-8 kilograms of wheat per mu per year;
3, Qaidam agricultural irrigation area, the annual yield of wheat per mu is 7-65438 05 kg;
4, vegetables according to the similar areas of food crops water fee standard 2 times; Orchard according to the similar areas of food crops water fee standard 3 times;
5, woodland irrigation, according to the same area of 50% per mu to collect water charges;
6, artificial forage grass, forage base irrigation 0.5 kg of wool per mu, natural grassland, grassland irrigation according to 0.25 kg of wool per mu;
7, multiple cropping of food crops or other cash crops, multiple cropping part, according to the local water fee standard of 25%. Article 8 The basic water fee per mu of wheat 1 kg, which belongs to the effective irrigation area of water conservancy projects and the farmland that was not irrigated in that year, shall be used for the expenditure of water conservancy projects in the annual overhaul. Ninth people and livestock drinking water project water fee standard:
(a) urban water supply projects, rural and pastoral water supply projects to households, according to the cost of water supply, according to 0. 1.5 yuan -0.5 yuan per cubic meter, monthly or quarterly billing;
(two) rural and pastoral drinking water supply project, according to 4-8 yuan per person per year;
(three) livestock drinking water, water charges according to the annual 2 yuan per sheep, 4 yuan per pig, 8 yuan per head (horse) of large livestock. Tenth new types of water conservancy projects in our province, in the project feasibility study and design stage, the water supply cost should be taken as the content of project approval and financial analysis, and the water supply cost price of the project should be approved. If the water price cost does not exceed the standards stipulated in these Measures, it shall be calculated according to the water supply cost; If the cost water price exceeds the standard stipulated in these measures, the water fee collection standard for water conservancy projects may be separately approved by the provincial administrative department in conjunction with the provincial price and finance department. Article 11 For watershed reservoirs with clear benefit scope, according to the principle of who benefits and who contributes, the water users who benefit shall sign a water transfer agreement with the water conservancy project management unit to implement paid water transfer, and the water conservancy project management unit shall transfer water according to the agreement. Chapter III Management of Water Fee Collection Article 12 The water fee collection standards for agriculture and animal husbandry shall be put forward by the water conservancy administrative department in accordance with the administrative subordination of water conservancy projects and the provisions of these Measures, reviewed by the price administrative department of the people's government at the same level, reported to the county or state (prefecture, city) people's government for determining the local water fee collection standards, and reported to the provincial water administrative department for the record. If the benefit scope of water conservancy projects crosses counties, the same water fee collection standard shall be implemented in the place where the water conservancy project management unit is located.