Current location - Education and Training Encyclopedia - Graduation thesis - Development course of Xinjiang Yihua Chemical Co., Ltd.
Development course of Xinjiang Yihua Chemical Co., Ltd.
On March 20 10, Xinjiang Yihua was incorporated in Jimsar County, Changji Hui Autonomous Prefecture, Xinjiang.

On June 8, 20 10, the foundation stone was laid in Yihua, Xinjiang.

2010 July 12, Xinjiang Yihua started construction;

20111On February 28th, the first-phase project of 2× 200,000 tons of synthetic ammonia and 600,000 tons of urea in Yihua, Xinjiang started safely and smoothly at one time.

On February 20 18 12, Xinjiang Yihua Urea Plant reached the production standard and became the first coal-based fertilizer project in Xinjiang.

On July 26th, 20 12, Xinjiang Yihua 1# gas kiln was successfully ignited at one time.

September 20 10/2, Xinjiang yihua No.6 (40500 kva) large-scale closed calcium carbide furnace was successfully electrified;

20 12 10 15 and Xinjiang yihua lantan project 1# boiler were successfully started at one time;

201March 8th, Xinjiang Yihua 2X330MW power plant project 1# generator set was successfully connected to the grid for the first time.

20 13, 12, Xinjiang Yihua flake caustic soda products went offline smoothly;

On March 20 1313, Xinjiang Yihua PVC products were successfully rolled off the assembly line;

2065438+On March 24th, 2003, the 2 * 330MW unit of Xinjiang Yihua achieved 168 hour full-load trial operation successfully.

In May, 2065438, clinker was successfully produced in the calcium carbide slag cement production line with an annual output of 1 10,000 tons.

As of May 1, the first phase of Xinjiang Yihua Project has been fully completed and put into production!

On March 27th, 20 13, the groundbreaking ceremony of Xinjiang Yihua Phase II Project was held as scheduled.