First, early planning, according to the capacity determined by the market, according to the land and funds, design the floor plan, design the office area, production area, yard, parking lot, living area, etc. , and then configure the equipment scheme according to the specific production needs, then design the scheme diagram and draw the basic diagram, and then design various components, such as the main workshop, belt conveyor, powder bin, etc. , according to the plan, and then draw the production drawings of the equipment.
Civil engineering, of course, requires civil engineers to design and draw civil construction drawings according to basic drawings.