20 19 summary of mechanical maintenance electrician's work (1) 20xx years have passed. In this year, I deeply realized the sweat and happiness of this job, and I devoted myself wholeheartedly to the cause of mechanical maintenance that I love. This year's work has ended and gained a lot. Let me write a little about this year and set new goals for next year's work.
First, ideological understanding
During this year, as a mechanic, I was strict with myself ideologically, I loved my career, I was strict with myself, I pushed myself, and I tried to think that this comrade could bear hardships, be not too dirty and tired, work hard, and never delay from the beginning. I can take the initiative to participate in the equipment installation process. Over the years, I have successfully completed all the work arranged. I believe that in my future work, I will overcome my own shortcomings and make greater progress through my own efforts with the care of my leaders and the help of my colleagues. Next year, I will work harder, study harder and practice harder.
Second, the maintenance work
In terms of maintenance work, the task this year is very heavy, and there are several holidays. For the hoisting and normal installation of equipment, the company has arranged overtime, but in any case, in order to improve my maintenance level, I insist that the more I work, the better my maintenance technology will be. At ordinary times, we also strive for every maintenance opportunity at work. I consult my colleagues' maintenance experience, and I usually chat with my colleagues to learn. This year's work is over, and next year's work is also the beginning of tension. These are mostly jobs that need to be done seriously. We should learn from the work and understand and accumulate work experience every time.
Third, the system
While doing all the work well, strictly abide by the company's rules and regulations. Be strict with yourself. Handle the relationship between business and personal affairs, be careful about the interpersonal relationship of colleagues and avoid blushing with colleagues again. Next year, I will be more diligent, work harder, abide by the company system as always, learn the company system, study professional knowledge harder, and make my business level go up a storey still higher.
Fourth, safety work
Safety is the key point. Whether it is work or life, life safety and mechanical safety need our constant attention. This year, there have also been some individual safety accidents at work, and some have been slightly stumbling. These small problems prove that there is still some negligence, insufficient attention to the progress of road sections, and insufficient safety awareness to consider road sections. In the future work, it is necessary to make up for the security risks that are not fully considered and the details are not fully considered. It is necessary to seriously study safety regulations, safety production and safety precautions, pay attention to safety, ensure that equipment safety accidents and life safety accidents do not occur, and eliminate some safety hazards. Even in life, we should not relax our personal safety.
To sum up the above points, there are still many shortcomings. We should strengthen our study in next year's work and better complete the work in 20xx.
20 19 summary of electrician's work in machine maintenance (2) I have been engaged in electrician's work in X system since I joined the work in X. Among them, he was engaged in the power supply of X machinery and the maintenance of electrical equipment and facilities in X from XX to XX. Engaged in power supply and maintenance of electrical equipment and facilities in X from 20xx to 20xx; I have been engaged in electrical work in xx since 20xx. Obtained the professional qualification certificate of senior electrician in 20xx.
Over the years, with the help and guidance of teachers, colleagues and leaders, my professional knowledge and maintenance technical level have been greatly improved through continuous study and work practice. I have successfully completed the work of this post and made some achievements. The work in the past few years is summarized as follows:
First, work actively and conscientiously complete the tasks assigned by the leaders.
X company is a professional team mainly engaged in geotechnical engineering construction. Its construction features are large electrical equipment capacity, many electrical equipment, short construction period and open-air operation. Electricians are responsible for the selection, layout, arrangement, installation, inspection, maintenance, demolition and electrical maintenance after construction.
Through years of electrical construction work, I can successfully complete the selection, arrangement, installation, inspection, maintenance and dismantling of the model reference network TOP 100 of electrical equipment in large-scale construction projects in strict accordance with the requirements of the construction organization design and the Technical Specification for Temporary Electricity Use in Construction Sites, and participate in the compilation of the construction organization design for temporary electricity use in several projects, so that all construction projects meet the national technical standards for temporary electricity use safety.
Such as: project x, project x, etc. During the construction, we worked actively, strengthened on-site construction electricity management and safety education, conscientiously implemented post operation procedures, and abided by various electricity safety management systems. In the construction projects we participated in, there was no electrical injury and electrical equipment accident, which created good social and economic benefits.
Second, pay attention to continuous learning and strive to improve their professional knowledge and level.
After taking part in the work, I continued to participate in the school and society, and learned the knowledge of electrical engineering, building construction and safety technology through self-study, and constantly improved my professional knowledge and business level.
Through continuous study, I have mastered professional knowledge such as electrician foundation, electrician technology, power supply in the factory, technical specification for temporary electricity use in construction site, construction safety technology, construction safety management, etc., greatly improved my safety knowledge and awareness, and constantly applied the knowledge and technology I have learned to production and construction.
Due to the different types of pile foundation, there are various mechanical equipment used in geotechnical construction, such as mud-protected bored pile drilling rig, long spiral bored pile drilling rig, prefabricated pile hydraulic press and so on. Mixers, dosing machines and delivery pumps for concrete mixing and conveying; It is the electrician's duty to do well the maintenance and electrical overhaul of butt welding machine and electric welding machine for steel bar welding. Pile foundation construction is a coherent process. If there is any problem with the electrical equipment of the drilling rig during grouting, it must be repaired as soon as possible to ensure that the drilling grouting is completed before the initial setting of concrete. Through years of study and practice, the fault source can be found in a short time and repaired well. Over the years, we have repaired a large number of building electrical equipment to ensure the normal construction of geotechnical engineering projects.
Third, pay attention to technological innovation to achieve safety and energy saving.
In recent years, the company has continuously encouraged technicians to carry out technological innovation in production and technology. According to the stipulation that AC electric welding machines should be equipped with electric shock protectors on the secondary side in the Technical Specification for Temporary Electricity Use in Construction Sites, I made a suggestion to the company at the end of 20XX, and the company quickly replied to and popularized the welding special switch box for electric welding machines supervised by the safety supervision station, which not only implemented the Technical Specification for Temporary Electricity Use in Construction Sites, but also achieved great results in safe electricity use and energy saving.
In the process of construction, the electrician operation team constantly carries out technical innovation and transformation on the electrical system of the equipment. For example, in August of 20XX, in the XX project, the electrical system of the distribution box of * * * equipment purchased by our company in 20xx was outdated, and the static and moving contacts of contactors were often damaged. After research, our electrician operation team found out the problem, and completely updated and reformed the distribution box of the long spiral drilling rig during the construction interval, which enabled the equipment to start normal operation, reduced the electrical failure rate, greatly improved the efficiency of die writing construction, and successfully completed the project within the planned construction period. After the construction of each project, the company will organize electrician technicians to maintain electrical equipment and facilities. Over the years, I have participated in the maintenance of many electrical equipment and facilities, straightened out the power lines of equipment and replaced unqualified electrical facilities. It has made positive contributions to the company's safe production.
Fourth, actively teach technology, and pass on the knowledge and skills accumulated in technology and production practice to new employees without reservation.
In the usual work, I often have technical discussions and exchanges with other employees, share what I have learned with everyone, and learn what I don't know from others to make progress together. Under my guidance, two electricians in xx Company have obtained the qualification of senior engineer, and can independently complete the electrical maintenance tasks assigned by their superiors, and three electricians have obtained the qualification of intermediate engineer, which can basically complete the electrical maintenance tasks, effectively alleviating the tension of electrician shortage in construction projects.
Five, strengthen the education of workers' safe use of electricity and energy saving, and constantly improve the awareness of workers' safe use of electricity and energy saving concept.
In recent years, while doing my job well, I have continuously strengthened the education on the safe use of electricity and energy saving and consumption reduction for employees. I made full use of my spare time to walk into the construction team and dormitory to explain the knowledge of safe electricity use and energy saving and consumption reduction, and organized the publicity of "Question and Answer on Safe Electricity Use in Construction" and "Energy Saving Week". So as to improve the safety knowledge of employees and save energy consciously.
Sixth, correct attitude and make active efforts.
Over the years, I have always kept in mind the firm belief of "safety first, hard work". I am a * * * party member, a senior technical worker in electrical maintenance, and I must not be slack in my work. Only when I seriously abide by and implement the rules and regulations on production safety, study hard and work hard can I put an end to power accidents and realize safe construction, and can I be worthy of the training and education of the party organizations and leaders for many years.
The acquisition of all these honors is an inspiration and spur to my work. I will continue to strengthen my study and learn from each other. Only in this way can I keep up with the pace of the times, make steady progress, and better serve the unit and society.
20 19 Summary of Electrical Work for Machine Maintenance (III) The work of the Equipment Department for 20xx has come to an end. Looking back on the coming year, with the guidance and help of department managers and supervisors, my business skills have advanced by leaps and bounds, and under the direct leadership of managers and supervisors, my work has been carried out smoothly. As an equipment man in the equipment department, I can improve my skills first so that I can work better. In order to make my skills by going up one flight of stairs, I hereby summarize.
I. Daily inspection
In the face of 24-hour uninterrupted operation of equipment, only by strengthening inspection can we better understand the health status of equipment, eliminate hidden dangers in advance, and prevent problems before they happen. Before going to work every day, I will check the operation of each fan in the paint line, check whether the motor and shaft of the fan are abnormal, and whether the fixed seat and bolt are loose or fall off; Check the heat exchanger of EN air intake system for cracks and water leakage; Check whether the water cooler works as an alarm; Check whether the air pressure, water pressure and working temperature of the incinerator are normal and whether the motor is noisy; Check whether the pressure difference of the dehydrator is within the range and whether there is an alarm (if there is an alarm, solve it according to the fault); Check whether the motor in the dewatering area is running normally (I have been monitoring the abnormal operation of a motor in the dewatering area); Check whether the chain line runs normally; Check the pressure, temperature and working conditions of four air compressors and two dryers in the air compressor room; Check the water temperature and water pressure of steam room and softened water room, and check whether the motor water pump is running normally. Through the inspection of the whole spraying line equipment, I can know the running state of each equipment at any time, and carry out maintenance work according to the actual situation of each equipment, so as to prolong the service life of the equipment, reduce the production and maintenance costs, and finally realize the maximization of enterprise benefits.
Second, the equipment operation and maintenance records
In addition to the inspection of equipment, I also advocate good interaction between equipment maintenance personnel and production operators, strive to realize early detection and timely maintenance of equipment defects, fully understand the temper and focus of each equipment, so as to facilitate rapid and predictable equipment maintenance, and focus on tracking the inventory of vulnerable and consumable parts and spare parts. Lubricate each refueling point of the equipment regularly, so as to avoid increasing the failure rate due to equipment wear caused by poor lubrication. I not only check the exhaust fan in each spraying room of the spraying line every day, but also regularly monitor the temperature of the fan shaft and motor with infrared thermometer and make records. Not only that, I keep records of bearings, belts, water pipe fittings, screen cotton, water pump seals and all other commonly used things. And track the inventory situation at any time, so that maintenance and replacement can be more timely and rapid. Also cooperate with department leaders to formulate work instructions, maintenance procedures, equipment operation, inspection and maintenance records, etc.
Third, the equipment maintenance
The hidden dangers I found in the normal production process of the company have been eliminated in time if they can be solved in time. Write down some problems that need to be solved when the line is stopped, and eliminate them at the first time. If it can't be solved, please consult the manager and supervisor. For example, in the middle of the year, I usually monitored the vibration of the exhaust fan in the spray booth. Under the leadership of the manager, all the fans were corrected and balanced, and the hidden dangers were solved. For the phenomenon of high conductivity of reverse osmosis equipment, I strengthened observation, increased cleaning times and replaced the filter element of security filter, and the effect was obvious. Every time I stop the line, I will comprehensively maintain the chain equipment, air intake equipment, air exhaust equipment, various circulating pumps, as well as the air compressor, dryer, dehydrator, cooler, incinerator, slag scraper, lithium bromide equipment, 2TDI system, 3TDI system and hot water circulation system of the spraying line, so as to ensure the auxiliary equipment to run 24 hours a year with low failure rate.
Fourth, skills upgrading.
I think that if a worker wants to do a good job, he must sharpen his tools first. You sharpen his tools, he should put them down first. Only by strictly strengthening the management and maintenance of equipment and changing the passive situation of equipment maintenance can the production run normally. After nearly two years of equipment maintenance, under the careful training of managers and supervisors, my skills have changed greatly compared with those when I entered the factory. I also used books and the Internet to inquire about the relevant information of my equipment, so as to learn and master their performance, safety regulations and maintenance as much as possible. At the same time, I also strengthen the study of electricians, and strive to be unique in the field of mechanical and electrical maintenance.
Verb (abbreviation of verb) needs to be improved
By improving the level of self-maintenance, we strive to save money on equipment maintenance costs, such as decomposing and repairing damaged and expensive parts, making the maintenance work detailed into parts, narrowing the fault range, maintaining the equipment with the lowest maintenance cost and avoiding directly replacing new spare parts. Reduce the number of external repairs of equipment and increase the intensity of internal repairs. For equipment maintenance, the service performance of the equipment can be ensured by changing the maintenance frequency and the downtime can be reduced.
To sum up, as an equipment member of the company's equipment department, I have the responsibility and confidence to continuously strengthen my study and improve my maintenance skills. I will work diligently and pragmatically around the annual target set by the company, and fully cooperate with the direct leadership and the production department. At the same time, strengthen the cooperation between colleagues, improve their mutual cooperation ability, and make the team department more United and more fighting. In my future work, I believe I have the ability and confidence to face difficulties and meet challenges bravely under the leadership of the department manager.
20 19 summary of mechanical maintenance electrician's work (iv) undoubtedly, in the past work, all the employees of mechanical maintenance electrician group, under the leadership of the factory, the production and operation department and the equipment and technology department, strictly abide by the various rules and regulations of the factory and strictly demand themselves from all aspects. Always adhere to the actual situation of the factory as the starting point, to ensure the normal operation of equipment as the premise, to minimize maintenance costs and shorten maintenance time as the goal, and constantly learn and summarize work experience and lessons. Although the working environment of mechatronics is complex, every member of the mechatronics group is diligent and willing to work, carrying forward the spirit of unity and unity, and constantly improving their professional ethics and professional skills. So as to successfully complete various tasks in a series of challenges and lay a good foundation for each workshop to complete various production tasks on time.
The following is a summary of several aspects, and leaders at all levels are requested to criticize and correct the improper points.
First, security.
Mechanical maintenance electrician group always regards safety production as the core of all work, because safety production is the life of enterprises and the guarantee of enterprise benefits. Only by doing a good job in safety production enterprises can employees benefit and increase their income. To achieve safety, we must start from me, start from the details, establish the concept of zero violation, and adhere to the combination of unity and cooperation. This paper is collected by the paper alliance, and the division of responsibilities is clear. We clearly realize that each member is the basic link of safety production management, and do a good job of safety awareness of each member to flaunt the company's safety production work.
Second, study.
It is not enough to have knowledge of safety production, but also to improve the technical professional level and practical work ability. From the beginning of the team's establishment, we should pay close attention to business learning, learn from each other's strengths and strive for perfection. Under the leadership of the team leader, the whole team began to do the activities of rest assured, and the team leader strictly checked and strengthened the inspection to avoid unnecessary losses to production.
Third, production.
With the joint efforts of leaders and all mechanics and electricians, we have done the following work.
1, installation, inspection, debugging, line inspection, replacement of excess sludge pump, etc.
2, can correctly check the cause of equipment failure, equipment maintenance, replacement of equipment failure electrical components.
3. Weld the track depression of the bridge sand suction machine and the propeller fixing iron bar.
4. Maintain and improve the power distribution cabinet, surface aerator, motor, equipment and machinery, secondary sedimentation tank and electric hoist in the pump room.
5, sludge dewatering machine and bridge sand suction machine to replace the roller bearing, equipped with walking iron wheel.
6. Check and repair all street lamps and lighting equipment in the factory, and replace the voice control switch of the complex building.
7. Complete vegetable planting and green weeding. Repair the greening pipeline in the factory and connect the dosing pipeline.
8, clean the propeller and agitator wire rope grass, replace the rope buckle and wire rope.
9. Replace the lubricating oil and filter element of the gear box of the surface aerator. Maintain the ultraviolet lamp, add lubricating oil and replace the water sampling pump.
10. Repair the greening pipeline in the factory and connect the dosing pipeline. Clean moss and aquatic plants in Bashir pond and secondary sedimentation pond.
1 1. Maintain the ultraviolet lamp, add lubricating oil and replace the water sampling pump.
Of course, there are also some shortcomings in the work process, mainly including:
The theoretical level of maintenance personnel needs to be improved, especially in the aspects of mechanical principle, electrical knowledge, the role of various mechanisms in machinery, tolerance fit, hydraulic system, etc., and the related maintenance technology is relatively weak.
Comments and suggestions:
(1) Energy conservation, emission reduction and production cost reduction only remain in the embryonic stage of the theory, and failed to be implemented in various departments, workshops and individuals in time. Moreover, most employees think that it has nothing to do with individuals and cannot fully realize their role in the influence.
(2) Only when there is pressure can there be motivation. Long-term step-by-step management and working methods have bound the individual's way of thinking and formed a mindset. Therefore, it is easy to make the same mistakes several times without looking for the root cause, thinking about improvement and lacking creative thinking and working methods. It is suggested to increase the discussion time of the meeting, and put forward the issues to be discussed at the next meeting according to the actual situation of the company. Please make a speech. This can not only objectively, truly and comprehensively reflect the characteristics of the problem, but also facilitate decision makers to brainstorm and make more accurate conclusions.
(3) Trade unions should give full play to their roles and serve the employees.
In the future work, the mechanical and electrical group will constantly sum up work experience, improve working methods, flexibly use various resources according to actual conditions, and improve work enthusiasm. Combined with the actual development of the factory, overcome all difficulties, strive to ensure the normal operation of the machine, reduce maintenance costs, improve work efficiency, and cultivate a maintenance team that meets the needs of the company's development and has excellent comprehensive quality. We have reason to believe that with the wise decision of the company leaders and the joint efforts of all employees, the company will usher in a broader development space.
The first 202 1 college entrance examination composition social hot material