Personal work summary of oil recovery technology
The first personal work summary of oil recovery technology

! My name is _ _, and I graduated from _ _ Institute of Science and Technology in 20XX, majoring in petroleum engineering. Looking back on the past two years, I have gained a lot and been deeply inspired. I summarized my thoughts, work and study in the past two years as follows:

First, deepen study, improve professional level and comprehensive political quality.

Stepping into work from school means changing from classmates to comrades. As a technician, I can't lose my learning foundation, let alone forget my responsibilities. I always insist on putting learning in the first place and taking improving comprehensive quality as the urgent task to adapt to the new post. On the team, the master asked me to locate accurately, have a clear goal, know what I want to do and learn, take the initiative to learn, ask more why, give full play to my theoretical advantages in my work, and actively deal with work problems in combination with practical exercise.

At work, I carefully observed and recorded with a pen. I often consult my master and read materials in my spare time. In this way, I strictly followed the master's instructions, tried to expand my knowledge, and comprehensively studied the professional knowledge of oil production, water injection, gathering and transportation, operation and related supporting projects, so that I could handle various production problems independently and gradually grow into a generalist in my work practice. The No.6 Oil Production Team is an old team in the old oil area that started mining in the 1970s. Over the past 30 years, it has produced many technical models and work pacesetters.

I came to this team as an intern and was infected by his fine tradition and rigorous style. Just do it, not do it. This is a word that Deng Hongwei, the equipment vice captain of No.6 Oil Production Team, talks about. He taught me that all management measures and technical parameters should be accurately calculated and have reasonable basis, and can't rely on fuzzy estimation.

1 inch =33.3 mm, one inch for a polished rod. Under his leadership, I pay more attention to the operation site, pay attention to the cultivation of practical experience while strengthening my own theoretical study, think about the principle in construction and calculate the parameters in the design book. I still remember an encounter with Director Liu in a well factory. He asked me if I could work out the power diagram of an oil well without any instruments at the well site, and I was shocked.

I don't think how to make a dynamometer card just by looking at it with your eyes. Finally, factory director Liu smiled and taught this experience: the up-and-down load can be calculated by looking at the tightness of the whip, and the liquid filling situation in the pump can be judged by looking at the up-and-down current of the pumping unit. I deeply understand that I still need to make great efforts to combine theory with practice, truly achieve the purpose of maintaining normal production of oil and water wells, and gradually grow into a qualified oil production engineer and technician.

Second, help others, close the distance, and strive to create a working environment of unity and forge ahead, both inside and outside.

As technical cadres, we should not put on airs, pay attention to face, and be close to employees. Try to help, understand and solve employees' problems. The annual college entrance examination is a major turning point in life, and college volunteers are the most important. Many grass-roots employees in our team have never gone to college or even participated in the college entrance examination, but as parents, they are faced with the problem of volunteering for these children. After learning about this situation, I contacted them actively to find out their expectations and learning situation for their children, and collected information on college entrance examination volunteers and employment rates of various majors. Every child who asked me to volunteer, I personally made a full study of them, and combined with their wishes, I made two sets of volunteer programs for parents to choose from. I try my best to do good things for employees, solve problems and do practical things. Even if it is a glass of water, I will try to give up my seat.

Three, based on their posts, study hard, forge ahead, frontier oil production 17 team constantly create new oil production achievements.

Compared with the same period of last year, it was 104.2% of the planned water injection, and the actual water injection in the first half of 2000 was 25223m3, which was 106.6% of the planned water injection. In the first half of the year, remarkable achievements were made, among which Cao 8 inclined-1 took hole filling measures on 20 _. 12.27, plugging 3440 times and sealing mining. The moisture content was 40% on the first day, and increased obviously on the second day. Suspected packer failure. On June 5438+1October 65438+February, measures were taken to rework and unseal the lower mechanical bridge plug. At present, the daily output of liquid is 24t, the daily output of oil is 1. 1t, the water content is 95.3%, and the dynamic liquid level is 359m, so the production is relatively stable.

Cao 8 Xie 3 took measures in the first half of the year, and the packer failed for the second time, affecting the oil production of 56t. At present, the daily output of this well is 3.6t, and the water cut is 84.2%, H: 1 158m. The water content is relatively stable, but the dynamic liquid level and liquid supply capacity are obviously decreased, so it is necessary to strengthen the observation of its dynamic changes. Yaping 1 was put into production on May 20th, 2009, and the production horizon was 3 1 1. At present, the daily output of liquid 12.5t and oil 1.5 is 88%.

Fourth, the current problems.

1. Existing sewage treatment process at the foot of cliff (as shown in figure 1). The fluid in the well enters the pressure tank (60m3). After oil-water separation in the pressure tank, crude oil enters the oil storage tank (50m3) and sewage enters the grease trap (105m3). After degreasing and sedimentation, the sewage directly enters the water injection tank (99m3) and is injected into the stratum through the water injection pump.

2. The injection-production correspondence rate is low, and the newly put into operation Yaping 1 well has no corresponding water well due to the insufficient supply of formation energy, so the production declines rapidly. It is suggested to invest in a water well and improve the injection-production well pattern.

3. There are 4 oil wells with production but no injection in Cao 8 block. The sewage injection well Cao 9 has not been inspected for five years, and the daily sewage treatment is about 1.50 cubic meters. Once there is a problem in the oil well, it is difficult to treat the sewage in Cao 8 block. It is suggested to add a sewage injection well in this block for standby.

4. The long-term water injection effect of duck feet is not obvious. The analysis shows that the main reason is that there are many problems in water injection wells and the water injection effect is poor. In view of the frequent perforation of the ground pipelines of two water injection wells and 1 sewage injection well, the chemical process was added in Yajiao Water Station to improve the quality of injected water.

Finally, once again, I would like to thank the leaders, colleagues and masters who have helped me in my life and work. No matter where I go in the future, I will remember that Guanghua operation area of oil production plant is where I started and grew up.

Chapter II Summary of Personal Oil Recovery Technology

My name is _ _, and I graduated from Northwest University in July 20XX, majoring in petroleum geology. At the same time, I was assigned to the eighth oil production team as a trainee technician. 20XX 65438+ 10 to the geological formation of No.1 Oil Production Mine; 1994 served as captain of geological team in March and director of mine production office in June. In the same year, he was rated as an engineer. 20XX was transferred to the third mining room of Geological Institute as deputy director in August; He is currently the deputy director of the Development Office of the Institute of Geology. Since/kloc-0 was promoted as an engineer in 1994, I have firmly established the consciousness of developing oil by science and technology, studied hard, and tried to explore new ways of tertiary oil recovery in Gudao Oilfield, and achieved certain results. At present, tertiary oil recovery by polymer flooding in Gudao Oil Production Plant has developed to a certain scale and is a global polymer injection area. The cumulative oil production of polymer has reached 2.06 million tons, but the annual oil production accounts for about 4 1% of the oil production plant. Up to now, * * * has participated in 2 scientific research projects, bureau-level scientific research projects 1 1, 5 factory-level scientific research projects and rationalization proposals 12. And among them, 3 won the first prize of the excellent development plan of the Administration 1, 2 won the third prize of the oil production plant, 7 won the first prize of the plant 1, 2, 3, the rationalization proposal 1 won the first prize of the plant 1, 2 won the second prize and 3 won the third prize. Published 5 papers at scientific and technological conferences above the provincial level. He has been rated as an advanced individual of double civilization in oil production plant for many years, and 1996 was rated as a model of double civilization in oil production plant.

First, based on the organic combination of theory and practice, give full play to business advantages and make positive contributions to maintaining the overproduction and stable production of crude oil in No.1 Oil Production Mine.

In 20XX, he served as the captain of the geological team of No.1 Oil Production Mine. Geology is the forerunner of development. I give full play to my business advantages, actively organize and carry out various geological research, production operation and development index control, and the geological work level of No.1 Oil Production Mine has always been at the forefront of the oil production plant. At the same time, we attach great importance to the application of new theories, new processes and new methods in our work. For example, in 1994, we cooperated with the University of Petroleum to carry out the "heterogeneity study" in the western region, which provided a reliable basis for putting forward various production measures in the western region. Diligent and good at thinking, in order to ensure the smooth completion of crude oil production tasks, we have taken ingenious measures and put forward more than 30 effective production measures every month on the basis of in-depth investigation. We should be diligent in summing up, be good at summing up, find and explore the law of oilfield production in summing up, and constantly improve our professional quality and ability to control knowledge in summing up. 1speech at the seminar on development technology of oil production plant in the spring and the first half of 1995 won the second prize. 1June, 1994 to1August, 1995, served as deputy director of the production office of No.1 Oil Production Mine. While doing a good job in geological work, he constantly strengthened the coordination and operation of production and paid close attention to production management. At the same time, he made full use of his spare time, systematically studied the theoretical knowledge of oilfield production management, humbly learned from the old master, went deep into the field construction line, paid attention to accumulating experience and learning lessons in practice, quickly adapted to the work, became a pioneer in leading and directing production, and played an active role in crude oil production in No.1 Mine.