Summary of Engineer's Professional and Technical Work (1) Time flies, and I have graduated for three years in a blink of an eye. I have worked in xx Company for more than two years. Due to the need of work and improving my technical level, I entered the technical department of xx Power Distribution Equipment Co., Ltd. to study and work. I have worked in xx Company for more than two years and have grown into a qualified electrical engineer.
When I first entered the company, I had to practice in the electrical workshop. During the period, I was mainly familiar with the products, laying the foundation for future design. After the internship, I officially entered the technical department.
At first, I was mainly responsible for designing some small orders, such as small boxes, pgl, ggd, and some relatively standard XGN36 (15)- 12. Usually several orders, or orders with output value less than 65438+ million. During this time, I studied with the chief engineer and the old engineer, trained professional skills and basic knowledge at night, and then checked the learning results on the order. I was deeply impressed and influenced by my study and work during this period.
Some standard engineering instructions, such as star delta step-down start, full pressure start, autotransformer step-down start, motor forward and backward rotation, etc. I learned them all at school, but I was not impressed at that time. After doing these motor control projects, the previous theory and practice are combined to design a control product with its own style. Such as temperature control box, gas control box, street lamp control box, etc. The main problem encountered by this kind of products is the arrangement of components, which directly affects the overall size of boxes or cabinets and the direction of cables. Once you are not careful, users will encounter many problems during installation and use. When making this kind of products, we must be careful, go to the site to communicate with customers, and after understanding customers' intentions, it is best to design the general plan and outline map for customers to confirm.
With the growth of experience, we began to make a relatively large set of gck, usually dozens or hundreds, and the output value usually exceeds 500,000 yuan or even one million yuan. The main functional units are: metering cabinet, incoming cabinet, capacitance compensation cabinet, feeding cabinet, municipal power generation conversion cabinet and contact cabinet. Basically, every two years, Dongguan Power Supply Bureau of Guangdong Power Grid will put forward new requirements for metering cabinets. Usually, within one month of putting forward new requirements, there are the most problems. For example, the former transformers of 3 15kva and above are required to be equipped with two sets of current transformers, one active meter and one electronic meter, and charged with low voltage. At present, a group of current transformers and an active meter must be equipped with a 10kv high-voltage metering cabinet, and the high-voltage charging method is adopted. If we don't pay attention to this problem, the goods will not be connected to the site and will not pass the acceptance. The amount of on-site decoration works is very large, which will bring negative influence to the company.
The feeding unit commonly used in gck is drawer cabinet, which is a relatively advanced cabinet type in China. It is usually necessary to pay attention to whether there is a "non-fireproof load" in the load, which must be cut off in case of fire to prevent the accident from expanding. A dc24v fire-fighting shunt coil is usually added to the molded case circuit breaker to realize tripping. Many people interpret it as "not a load that must be protected by fire fighting", which leads to the wrong position of the trip coil and jumps off some fire fighting loads, such as fire fighting fans and pumps. In fact, the fire load cannot be cut off. Once a fire breaks out, it will lead to a more serious fire. It should be understood as "non-fire-fighting load that must be protected".
After that, we began to make the high-voltage cable distribution box DFW- 12, the high-voltage and low-voltage pre-installed power station ybp(m), and then to XCN15 ring network cabinet, Kyn28A- 12 central cabinet, as well as more complicated plc and frequency conversion control cabinet, DC screen (gzdw) and signal screen. From simple to complex; From small projects and small batches to large projects and multiple large orders; With the increase of design projects and experience, I can skillfully and reasonably master the design of system schematic diagram and secondary control wiring diagram of various cabinets, including various non-standard motors, fans, fire control boxes, and various dual power supply and multi-power supply three-in-one and five-in-one systems. At the same time, I am very familiar with the structural characteristics of various cabinets.
Summary of Engineer's Professional and Technical Work (II) I graduated from xx University in October, 20___ _, majoring in architectural budget and final accounts and architectural accounting. As soon as I graduated, I joined xx Company as a budget officer and information officer. He started work in October, 20___ _ _/kloc, and was employed as an assistant engineer in early October, 20___ _ _/kloc. Since 20___, he has served as deputy section chief of quality inspection department of technical quality department, and as project technical director since 20 _ _ _. Looking back, I have made some achievements in my eight years of work, but there are still many problems to be improved. The professional and technical work in recent years is summarized as follows:
I. Political Thought and Morality
I, in my work, try my best to explore, make positive progress, pay attention to integrating theory with practice, analyze and solve problems in time when I find them, constantly enrich and improve my working ability and professional level, and always strictly demand myself for political qualification and professional competence.
Second, the professional and technical level
At the beginning of 20___ _ years' work, I learned from old comrades with an open mind when I was a budgeter, and I was serious and responsible for the project budget work. After each budget work is completed, I carefully check it to ensure the accuracy of the project budget and final accounts. In terms of project construction, I have to start over. I use my past work experience, learn from builders with an open mind, ask old comrades for advice, take notes on various professional problems encountered in my work, diligently consult experienced technicians, consult various materials, and strive to improve my professional and technical level. In the second half of 20___, at the company's paper exchange meeting, I wrote "Causes and Prevention of Cracks in Brick Masonry of Ordinary Buildings", which was well received by the leaders. In April of 20___, I participated in the compilation of three system documents of the company: quality, environment and occupational health and safety. As a result, I travel between the company and the project department every day, and successfully compiled internal management documents, quality, environment and occupational health and safety management manuals, quality, environment and occupational health and safety management system program documents and other system documents. During this period, I was also responsible for the system implementation of the company's quality inspection department, so that the company successfully passed the verification of the system certification of the certification center.
At the beginning of 20___, due to the successful completion of the first phase of xx Garden, I was highly trusted by the leaders and was appointed as the technical director of the second phase of xx Garden 10# and 1 1# buildings. 10# building is a five-story brick-concrete building with a construction area of 5080m2 and a cost of 2.726 million yuan. 1 1# building is a five-story brick-concrete building with a construction area of 5,526 ㎡ and a cost of 2,943,500 yuan. As the technical director of the project, he is responsible for the cost, schedule and quality control of the project, establishing rules and regulations, and standardizing the operation behavior according to the system. In terms of cost control, we must shop around for goods, and establish a strict supervision and control mechanism in every link of material collection, transportation, collection, management and distribution. At the same time, it is necessary to improve construction technology, actively promote the use of various new technologies, new processes and new materials, and reduce material consumption. Strengthen labor cost control, establish human resource management operation mechanism, optimize the overall labor force, realize the best combination of labor supply and project demand, and follow up regularly to maximize the use of labor resources. It is necessary to actively implement the quota contract law to improve the technical level of employees and the organizational management level of the construction team. Strictly control the cost of machinery, strive to improve the utilization rate of main machinery, pay attention to multi-purpose of one machine, and reduce the number of equipment maintenance personnel and spare parts costs. Streamline the project organization, reasonably allocate the cost of the project department and reduce the indirect cost. At the same time, strengthen contract management, strengthen the concept of claim, make good use of price adjustment documents, accurately calculate the price difference, and handle the settlement in time. Strengthen the cost inspection of construction projects. Conscientiously manage the construction site and work overtime without complaint, which fully embodies the vanguard and exemplary role of a young professional and technical personnel. During my tenure as technical director, I also set up a qc team in the fourth bid section of Tsinghua Campus Phase II, and wrote the qc results of "Anti-seepage Treatment of Pre-reserved Holes in Sanitary Pipes", which won the first prize in the scientific papers and qc results appraisal held by Gaoyou Construction Engineering Bureau in 20 years.
Since 20___, I have been transferred to xx Garden Phase II Project Department as the technical director of 10# building and 13# building. 10# building is a five-story brick-concrete building with a construction area of 5170m2 and a cost of 3.75 million yuan. 13# building is a five-story brick-concrete building with a construction area of 5 170m2 and a cost of 3.75 million yuan. Because I have accumulated a lot of project management experience in the first and second phases of Tsinghua campus, I am very satisfied with my work. I applied my successful experience in the second phase project management of Tsinghua Campus to the construction of Longteng Garden Project, and achieved good results, which saved a lot of manpower, financial resources and material resources for the company in project management and contributed to the company's development. In 20___, more excellent articles came from. At the end of the year, due to the needs of the company's super-level qualification examination, several employees of our company spontaneously organized and established a patent research group. In their spare time, they devote themselves to researching patented inventions. With everyone's joint efforts, two patents I participated in, "Accurate Measurement of Cutting Profile" and "Limited Direction Control Device Manpower Transport Vehicle", passed the examination of Yangzhou Jinjiang Patent Office. At present, the second phase of Longteng Garden has been successfully completed, and the third phase has started as scheduled. I continue to be the project technical director of Building 20 and Building 2 1 in the third phase of the project.
Third, learn to update knowledge.
The development of modern society is changing with each passing day, and knowledge is updated very quickly. If you don't add new knowledge in time and continue to learn and communicate, you can't meet the needs of enterprise technology management and will be eliminated. To this end, I took every opportunity to participate in various training courses and technical exchange activities. In 20___ _, I passed the national adult college entrance examination, and now I am taking part in the undergraduate study of engineering management in Nanjing University of Technology. In the past three years, I have constantly overcome the conflict between work and study, and tried my best to spare all the time to participate in study. At present, I have passed all the courses and am preparing my graduation thesis and bachelor's degree exam. Through these three years of study, I have enriched my professional theoretical knowledge.
Summary of Engineer's Professional and Technical Work (III) I graduated from xx University of Science and Technology on _ _ 10, with a four-year undergraduate course. After that, I worked as an engineer in xx Group. Outstanding performance in "virtue, ability, diligence and achievement".
First, political thought and moral quality.
First of all, we should actively demand ideological progress, keep up with the pace of the times, seriously study the principles and policies of the party and the state, and understand the latest social trends. Although I haven't joined the China * * * Production Party, I have always been strict with myself according to party member's standards, consciously accepted the supervision and help of party member and my colleagues, and made unremitting efforts to overcome my own shortcomings and make up for them, so that I can stand the test in the long years to come and join the great China * * * Production Party as soon as possible.
As a city planner, I have always adhered to the professional ethics of planners, and tried to find the greatest intersection and balance point among administrative means, developers' interests and the needs of the masses, so that every project I am responsible for is truly pragmatic. Therefore, it is the basic principle of my work to treat every project seriously and attentively. This point has also been unanimously recognized by the planning bureau and hospital leaders.
Since I joined the work, I have a strong sense of ownership, closely linking the development of the company with my own development. I always abide by the company's rules and regulations, actively obey the leadership's work arrangements, successfully complete various tasks, and safeguard the collective honor. Work hard at work, study relevant professional knowledge, sum up work experience and skills, and constantly enrich and improve yourself. At the same time of self-improvement, we also strive to shoulder the burden of "academic leader" of the unit, organize colleagues to summarize exchange projects at ordinary times, help new colleagues enthusiastically, enhance the cohesion of the unit and promote the overall progress of the team.
Second, the construction engineering intermediate title professional and technical work summary
Since taking up my present post, I have been determined to forge ahead, work hard, obey the leadership, obey the arrangement, abide by the law, unite with comrades, be helpful, care about the collective, be conscientious, down-to-earth, be loyal to my duties and do my duty. Actively participate in political and professional studies, attend classes on time, leave early and return late, pay attention to moral cultivation, actively fulfill the obligations of party members, earnestly perform the duties of first-class teachers, coach and train young teachers to participate in education and teaching reform, and guide teaching research.
Do a good job in students' work, behave in a more standardized way, be a teacher, behave in a standardized way, and be responsible for students. In our work, we put our love for students in the first place. The relationship between teachers and students is harmonious, and we are comfortable with our work. Many things have been solved. We love, respect, trust, care and cherish students, and treat them equally regardless of their grades. Give more enthusiastic help and care to students who are withdrawn. Therefore, the teaching achievements are outstanding, the students' moral character is excellent, and the education and teaching work is well completed. Therefore, it has won the trust and respect of leaders and teachers.
In education and teaching, we are dedicated to our posts and strict in teaching. In classroom teaching, I insist on studying the syllabus carefully, analyzing the intention of compiling teaching materials carefully, preparing lessons carefully, paying attention to designing the teaching methods of each class, studying the application of modern educational technology in classroom teaching, and paying attention to cultivating students' various abilities. At work, learn with an open mind, don't be ashamed to ask questions, digest in time, absorb the essence of others, practice in your own teaching, and constantly sum up and improve.
Three. Work performance and performance of duties
Since I joined the work, I have always insisted on participating in a number of construction projects in the front line of construction projects. In practical work, I have always maintained a serious and responsible working attitude, studied hard with an open mind, constantly strengthened my theoretical knowledge and improved my professional level. After seven years of training, I have grown into the backbone of engineering technology. In these projects, I can combine theoretical knowledge with practice and guide practical activities with theoretical knowledge. Cooperate with the construction unit to successfully complete the project on the premise of ensuring the quality and safety of the project. After delivery, it was well received by users and supervised by relevant units.
In order to reach a new level, I sincerely hope to be promoted to an engineer with intermediate title, so as to better carry out my work and serve the society. Although I am serious and responsible for my work, my theoretical knowledge and professional level have improved rapidly, but the construction industry is a deep and wide-ranging industry, and my management ability and overall ability need to be further improved. I will, as always, be meticulous and diligent in my work, study hard for professional knowledge, keep improving my business, be brave in innovation, constantly strive to enrich my theoretical knowledge, improve my working ability and strive for greater progress. After working for six years, I have been trying to be an excellent technical manager of construction engineering and contribute my strength to the construction industry.