1, the municipal administrative department shall organize relevant departments to prepare the city's heating planning in accordance with the prescribed procedures, and organize the implementation after the approval of the Municipal People's government;
2, new construction, renovation and expansion of heating facilities, shall comply with the heating planning;
3. Optimize the allocation of heat source facilities. No new heat source facilities shall be built within the heating capacity of urban pipe networks and regional boiler heating pipe networks. Existing decentralized heat source facilities shall be gradually incorporated into urban pipe networks and regional boiler heating pipe networks in accordance with the principle of rational allocation, except for the application of new energy and new technologies;
4, strengthen the management of heating energy saving, and gradually implement the charge according to the heat consumption;
5. The heating period is from June165438+1October 15 to March of the following year 15. The Municipal People's Government may adjust the heating period according to the actual conditions such as meteorology. During the heating period, the heating unit shall ensure that the room temperature of the bedroom and living room (hall) of residential users meets the temperature requirements of the current national residential design code.
During the heating period, the heating unit shall not postpone, suspend or end the heating in advance, and shall not withdraw or partially withdraw from the heating business activities; Units that supply water, electricity, gas, fuel oil, coal and heat energy to heating units shall ensure the supply and shall not interrupt without authorization.
During the non-heating period, if the heating unit really needs to withdraw or partially withdraw from the heating business activities, it shall properly arrange the related users, facilities management and protection, heating costs and other matters within the heating range, and complete the handover of heating facilities and technical files, user information, heating costs and other matters with the undertaking heating unit before July 15 of that year, and inform the original filing organ in writing at the same time. When the heating rights and interests of users cannot be effectively guaranteed, the heating unit shall not withdraw or partially withdraw from the heating business activities.
Article 13 of the Measures for the Administration of Heating in Beijing shall provide users with safe, stable and qualified heating services in accordance with relevant national and municipal standards and norms, establish and improve the heating operation management system, service standards and safe operation procedures, and abide by the following provisions:
(a) the establishment of heating facilities inspection system, inspection of heating facilities within the scope of management, and make records. Found that there are hidden dangers in heating facilities, it should be eliminated in time; If it is found that there are hidden dangers in the heating facilities for users' own use, it shall inform the users in writing to eliminate them in time.
(two) before heating, the heating system should be filled with water, pressure test, exhaust and trial operation, and announced in advance within the heating range.
(three) the establishment of user heating temperature sampling system, regular testing of user room temperature, temperature measurement records should be signed by users or other witnesses.
(four) the implementation of 24-hour service during heating, timely processing and answering questions reflected by users.