Work plan of engineering personnel
Time flies, the blink of an eye has passed, and our work will be enriched in busyness and harvested in joy. At this moment, we need to make a detailed plan. How to draw up a plan specifically? The following are my five work plans for engineers, which are for reference only and I hope to help you.

Engineer's Work Plan 1 1. Engineering: Daily maintenance of the store.

1, the store engineers of the company completed more than 4,000 maintenance documents reported by various departments, and orally reported more than 20xx, handling many sudden equipment and facilities failures.

2. On the basis of last year's work, the engineering department made a detailed maintenance plan for equipment and facilities, which was broken down into quarters and months, and the maintenance contents were explained in detail, and implemented to everyone, ensuring the quality and efficiency of the work.

3. Complete large-scale maintenance and emergency repair projects throughout the year: ① Thoroughly dredge and clean the main water pipe under the kitchen of Xuanhua Store; (2) The drainage well of municipal residents is blocked, and the return water of the kitchen department needs to be dredged once; (3) the roof smoke exhaust pipe was rebuilt once, which solved the complaint problem of the top-floor residents; (4) In order to relieve the pressure of electricity consumption, Xinyang Store added and reformed two main cables, which not only solved the problem of electricity consumption, but also solved the problem of potential safety hazards; ⑤ In the reconstruction of Xinyang store's back corridor, through the research with the chef, it is found that the kitchen needs to add gas stoves to meet the needs of food production. However, due to the narrow space and great difficulty, after repeated research and calculation, it was finally decided to use the back corridor and add 380 kg fuel tanks, which not only solved the difficulty of purchasing oil in winter, but also ensured the use of departments; ⑥ The business area, toilet and main sewer of Xidazhi Street Store are blocked and cannot be opened; It was repaired all night. 7. The main switch on the first floor of Xidazhi Street burned out, and the first floor was completely cut off, which affected the business and was repaired all night.

4. During the renovation of Xuanhua Store, the infrastructure renovation project was based on the long-term planning of one-time construction, with the purpose of being ahead of time and having the potential to stay behind, and overcoming the harsh environment of short time, narrow space and complicated aspects, and completed the following work: ① Design and construction of integrated wiring; (2) After the comprehensive renovation of indoor heating facilities, the whole building is designed according to the type of household heating, and there is no need for indoor construction when household heating is carried out in the whole building. This work is done once and for all. (3) The original distribution of main tap water pipes is unreasonable, and there are many leaks after long-term corrosion of iron pipes. After asking the general manager, all the indoor iron pipes with hidden dangers were replaced with PPR hot-melt pipes, and the layout was reasonable, so as to achieve once and for all.

(4) For safety and warmth, two security doors, a small door bucket and a 400kg fuel tank are added in the back corridor.

⑤ The design of air supply, air exhaust, toilet ventilation pipes, air conditioners, pipes and circuits, and the rational use of space have been proved to be effective by practice.

5. Overhaul and maintenance projects completed throughout the year:

(1) Xinyang store heating boiler maintenance; (2) Remove the oil stain from the exhaust hood to the exhaust fan in the kitchen of Xinyang Store once (20 linear meters); ③ Xidazhi Street Store replaced the flat hot air curtain; (4) Remove the oil stain from the exhaust hood to the exhaust fan in the kitchen department of Xidazhi Street once (30 linear meters); ⑤ Complete the annual cleaning and maintenance of air conditioners, exhaust fans and outdoor units in all stores.

⑥ Management of fixed assets: purchase, management, supervision, repair and maintenance of fixed assets.

⑦ Tool placement between Xinyang Store and Xidazhi Street Store. According to the requirements of the company, the environmental sanitation of material storage has been improved. At the same time, the ideological education of employees has been strengthened. Make employees' overall ideological quality by going up one flight of stairs. It has laid a good foundation for improving the overall quality and long-term planning of enterprises.

Second, the night shift, safety and fire prevention work

1. Every store is on duty at night, with more than 8,000 safety inspections.

2. There were no off-duty, off-duty, personal leave and other disciplinary phenomena among night shift staff in various stores throughout the year.

3. The outdoor facilities protection net of each store is reasonable in layout, durable and free from potential safety hazards.

4, complete the night shift book 30 Yu Ben.

5. Each store should set up a patrol inspection mechanism to check the temperature of wires and cables at the peak of electricity consumption not less than 8 times every day to ensure safety.

6. Each store completes the monthly joint safety inspection on time.

7. With the cooperation of all stores and departments of the company, no safety accidents occurred in all stores throughout the year, which laid a good foundation for the safe operation of the company.

Three. Outreach work

1. During the renovation of Xuanhua Street Store, for the sake of overall safety, convenience and hygiene, with the approval of the General Office, it is planned to transform the original gas tank used by the kitchen department into a gas pipeline. Through the application, it is known that there are no new users because of the lack of gas source in the old city. After the coordination of the relevant departments of the gas company and the assistance of the engineer Master Zhao, we overcame many difficulties and took great pains to finally complete the project smoothly.

2. The plaque at the main entrance of Xuanhua Store was affected by the overall facade renovation of Xuanhua Street. The construction party and the law enforcement bureau jointly issued a notice of demolition. After receiving the notice, our store reported to the General Affairs Office and decided to keep the original plaque as much as possible.

Yang Zong took the lead, with the Ministry of Administration as the main body, and coordinated efforts in many ways. In the end, most of the plaques on the facade of our store were preserved, which made our company show its strength and social benefits in the use of plaques in the future.

3. Dacheng Store requires our store to dismantle and rebuild the smoke exhaust pipeline due to the decoration of the building facade. After reporting to Yang, Yang Zong instructed to keep it as much as possible. With the support and help of Yang Zong, he negotiated with the responsible person of the construction party for many times, and negotiated with the neighbors upstairs, and gained their tolerance and understanding. Finally, other ways are used for thermal insulation decoration, which avoids economic losses for the company.

4. We have finished the renewal work of bedrooms in various stores, and there are still two bedrooms with unsatisfactory conditions to be replaced.

5. Stores handle temporary residence permits for employees and outreach work of police stations.

6. The outreach work of plaque licenses for Xuanhua Store, Xidazhi Street Store and Dacheng Store has been successfully completed.

After such a tense and orderly year, I feel that my work skills have reached a new level. I have a clear plan and steps, a direction of action, and a work goal when I do every job. I really have a bottom in my heart Basically, we are busy but not chaotic, tight but not scattered, clear in organization and clear in everything, and fundamentally get rid of the phenomenon of just working hard and not knowing how to sum up experience when we first joined the work. In this way, I walked into this year from infinite busyness and walked out of this year from infinite ease. Also, while working, I also understand the truth of dealing with people, and I also understand that I should have a good attitude, enthusiasm and sense of responsibility for my work! In order to do every job well. The new year is coming, facing the increasingly fierce competition in the catering industry. Aging of facilities and equipment. According to the current situation of the hotel, the administration department tries to make a good work plan for the next year to make up for the shortage of the previous year's work.

Work plan for engineering personnel Part II 1. Main tasks completed this month:

1. Complete all temporary tasks assigned by superiors.

2. Complete the installation and removal of holiday decorations at the entrance of the clubhouse.

3. Completed the decoration of the venue of the May 4th Youth Day party and the adjustment of the stage lighting.

4. Complete the maintenance of air conditioning units in the clubhouse, driving range, Luyuan Mountain Villa 1, 2, 3, 6 and 7, and switch the refrigeration mode for debugging.

5. Cooperate with the sanitation team to complete the cleaning of grease traps and septic tanks in each area.

6. Cooperate with Haier's after-sales service personnel to complete the air-conditioning installation of the club's weak current room and strong current distribution room and the installation of No.5 and No.6 water heaters in Harmony Garden.

7. Completed the installation of two TV sets in Harmony Garden No.6, and repaired the bathroom basin and the hot and cold water switch for bathing.

8. Cooperate with Luqiao Company to complete the repair of outdoor leaking pipeline between Road 6 and Road 7.

9. Dismantle the desk of the Human Resources Department and install the telephone.

10. Cooperate with the cleaning company to clean the smoke exhaust pipes of the staff dining room, floating dining room and kitchen of Xie Yuan 1.

Two. Contents and reasons of unfinished work this month:

Unfinished work: the maintenance of air conditioning units and indoor units in various regions has not been completed, and only some units have been repaired.

Reason: There are many maintenance items of equipment units and indoor machines in various regions, and the engineering and technical manpower is insufficient.

Three. Problems and solutions in this month's work:

Existing problems: With the depreciation of the service life of each equipment unit, four sewage pumps, such as Xie Yuan living quarters, sewage treatment station and 1, failed and could not be used normally.

Treatment measures: use the sewage in the temporary water pump to drain the water tank in time and pull out the faulty water pump. After inspection, the motor coil is burnt out and needs to be rewound. If the coil cannot be repaired, report to the company leader, ask professionals to wind the coil, and with the consent of the leader, cooperate with the procurement to pull out the motor for maintenance. Now the three pumps have resumed normal use.

Fourth, the work plan for next month

1. Complete all temporary tasks assigned by superiors.

2. Cooperate with the sanitation team to complete the cleaning of grease traps and septic tanks in each area.

3. Cooperate with the air conditioning system installation unit to complete the maintenance of Luyuan No.5 air conditioning unit and water flow switch to ensure normal operation.

4. Continue to repair and maintain the air conditioning units in Luyuan 1/Villa and Heyuan1,2 and 3 Mansions, and switch the refrigeration mode for trial operation and debugging.

5. Complete the cleaning of air conditioning vent filters of all wooden houses in Harmony Garden.

6. Control and save water and electricity, reduce energy consumption of water and electricity, and switch landscape lighting, street lamps and air conditioning units on time.

Verb (abbreviation for verb) is the work content that needs to be coordinated by the company or other units.

With the normal operation of the stadium, the service life of all kinds of equipment and facilities is depreciating, the maintenance rate of all kinds of equipment is increasing, and our engineering and technical maintenance personnel are in short supply. I hope the human resources department will speed up the recruitment of engineering and technical personnel.

The third part of the engineer's work plan thanks Manager Hou's recommendation and XXX's recognition and appreciation. I entered XX Company with joy and yearning on April 28th, 20xx, and it has been 1 year and 8 months since today. During these 65,438+0 years, through the training and leadership of General Manager Yuan and the care, support and help of colleagues, I realized that I was making progress and could really do something for the company. Be responsible for the management of the company's website, check the promotion of products on various platforms and customers' browsing, reply customers' messages in time, check customers' emails, draw up contracts for suppliers/demanders, purchase products, regularly ask about the latest prices of products to be purchased, product sales, customer tracking, company document management, and temporary affairs explained by General Manager Yuan and colleagues. ...

Since I joined the company, I have loved my job. I have always done the following: hard work, dedication, conscientious, obeying the arrangement of the leaders, getting along with my colleagues in harmony, and taking the company as my home ... Although I have some advantages, I still have many shortcomings, such as low efficiency, lack of long-term and systematic consideration, lack of business knowledge, poor communication with customers, and lack of boldness in doing things.

My future efforts are: to establish a good self-image, to be an example to my colleagues at work, to take his/her personal affairs as my own responsibility, and to be a trusted partner of my colleagues in life. Carefully arrange the specific time of each work, distinguish the priorities of the work, and be rational, disciplined, orderly and effective. Finish the specific work assigned by the leader on time, avoid the possibility of mistakes as much as possible without delay, finish what you started and report the work progress to the leader in time, so that the leader can make overall plans and make flexible arrangements. Learn working methods from leaders and colleagues with an open mind, coordinate and communicate with you in your work, think, plan and learn from others from the general trend and pattern, and improve your work level; Improve the quality of work, have a strong sense of professionalism and a high sense of responsibility. After everything is finished, we should think and summarize the work, so as to really make the work planned and implemented. Find out the shortcomings in the work and be good at self-reflection; I love my post and work hard, I can't work for work's sake, I take the initiative rather than passively handle my daily work, I take the initiative to work, I am good at doing things, I am willing to work, I dare to work, I can work, I can work; In daily work, meetings, leadership speeches, etc. , to have concentrated attention, sensitive response, profound understanding, solid memory, comprehensive wit, delicate taste; In the process of doing things, don't say unfounded words, don't do uncertain things, don't make a wish easily, and do what you say. Cultivate your comprehensive quality, improve your business ability, contribute your strength to the future of XX, and make greater contributions to your career.

Since I joined XX company, I have always regarded myself as one of the bosses of XX company. Everything in the company has the responsibility and obligation to take care of it. Even if the ground is a piece of garbage, I hope it will become a green lawn or flower because of my existence. I'm glad to study and make progress with you here, because I hope everyone I contact is a talented person with quality, self-cultivation and flexibility, so that everyone who has been to XX company can feel the culture and enthusiasm of XX, and everyone who has contacted XX company can leave a deep and beautiful impression on each other! My life creed is: live every day without regrets!

I have always been very grateful to General Manager Yuan and the leaders for their careful cultivation and support. The progress of our work is inseparable from the suggestions of leaders and colleagues. At the same time, I would also like to thank the leaders and colleagues for telling me that I have no work experience in the past year or sometimes my colleagues tell me that some things are not done in time and in place. Please forgive me. I will definitely work hard on time and efficiently in the future.

Today, I am very happy to share my work experience with all of you here. In the future, we will join hands to create a better tomorrow for XX Company. The year of 20xx is coming to an end. I wish you all a happy New Year. 20xx will live a long and invincible life. I wish XX a new career and a bright future! Thank you!

4 xx year is a heavy year for the project department of 12 bid section, and it is also a key year to ensure the construction period and complete the overall goal on time. In order to clarify the responsibilities of the engineering department, implement the quality policy of "striving for the first-class in the industry, realizing customers' expectations, and dedicating to satisfying the project", and realize the goal of "the qualified rate of project completion acceptance is 100%, and the quality reputation reaches the advanced level in the industry", the work plan of the engineering department for xx years is formulated in combination with the actual situation and engineering characteristics of the project department. The work plan for xx mainly includes the following aspects:

First, the training of new students.

A few technicians in the engineering department have just graduated, and their work enthusiasm, initiative and technical theoretical knowledge reserve can meet the work needs. However, there are still some shortcomings in the combination of theory and practice, the handling of daily affairs on the construction site, the handling of emergencies, and the details and key points of project quality control. In daily practical work, we should strengthen the support, help and guidance for freshmen, so that they can become independent technical talents as soon as possible, and at the same time improve the overall quality level of the engineering department. Combined with the characteristics of this project, engineers and technicians are required to subdivide the key points of sub-item control, so as to know the problems existing in the construction site and be able to deal with them, enrich their own knowledge and improve their own quality. Taking the bored pile currently under construction as an example, engineers and technicians are required to master the following knowledge:

1, drilling pile mud control

Mud control standards should be mastered during drilling and before concrete pouring. Different strata require different mud indexes. During construction, the mud must be determined in time according to the specified test method to ensure that the specific gravity, viscosity and sand content of the mud meet the requirements, so as to lay a good foundation for smooth drilling and qualified concrete pouring.

2. Bored pile reinforcement system.

The inspection of reinforcement shall check the variety, grade, specification and quantity of reinforcement; Longitudinal reinforcement joints, quantity and quality; Diameter of reinforcing cage; Longitudinal reinforcement spacing; Length of longitudinal reinforcement; Stirrup spacing; Strengthen stirrup spacing, etc. If unqualified products are found, replace them in time to ensure that the next construction will not be affected.

3. Concrete pouring of bored pile

Before pouring the bored pile, it is necessary to check the mud index, sediment thickness at the bottom of the hole, installation depth of reinforcing cage, concrete slump, duct air tightness, duct length, etc. Meet the requirements, unqualified can't pouring; In the process of pouring, attention should be paid to the initial pouring amount of concrete, the buried depth of conduit, the slump of newly poured concrete and the total pouring time of concrete, so as to ensure the smooth pouring of bored pile and the quality of pile body.

4, underground continuous wall construction

The construction technology of diaphragm wall is basically the same as that of bored piles, and new students will be organized for collective training at the construction site when construction starts. Explain the matters needing attention and control points in construction. The same is true of other subdivisional work. Before construction, we should master the construction methods and quality control points of the project, observe, think and communicate more at the construction site, be responsible for the quality evaluation of the sub-projects and ensure the quality of the delivered projects. The accumulation of technical experience, in addition to their own practice, can not be separated from the guidance and help of others. In addition to internal discussion, on-site guidance and mutual learning, the personnel of the engineering department also plan to invite leaders to give lectures from time to time. The leaders of the project department all start from technicians, and have accumulated solid and rich construction experience, which is a valuable asset for engineers and technicians. Inviting leaders to give lectures can not only transfer knowledge, but also inspire the younger generation.

Through lectures, technicians can improve their knowledge level, accumulate experience and enhance their confidence in construction practice. The accumulation of technical experience and the effect of training new people are not only reflected in the improvement of the actual control ability of on-site construction, but also in the academic performance. Accumulate materials through the usual QC activity group and other practices. By the end of the year or the end of the year, all the staff of the Engineering Department will strive to complete one or two papers or achievements through the results of QC activity group, five small achievements and scientific papers, and report the growth of xx years to the leaders.

Two. Office data management

In order to improve the management and filing of completion data, make the data more orderly and easy to manage, and meet the requirements of data collection and collation, the data to be collected in xx years include: 2. 1, construction management record 1) unit project commencement report (overall commencement report) 2. testing unit qualification application data 3. Design change notice 4. Records of blue prints.the design and meeting minutes 5. Overall construction organization design and approval 6. The submitted special construction scheme needs to be completed in xx years: ① Complete the construction scheme of the main structure and waterproof structure of the four stations on time. (2) Complete the preparation and reporting of the special safety plan for the four-station scaffolding, high formwork, underground excavation and demolition blasting project on time. The reporting time of the special construction scheme is preliminarily determined as shown in the table.

Construction plan submitted to the schedule unit project name compilation content main structure construction plan waterproof engineering construction plan people and stations scaffold engineering safety special plan high formwork engineering safety special plan demolition blasting engineering safety special plan main structure construction plan waterproof engineering construction plan Longgui station scaffold engineering safety special plan high formwork engineering safety special plan demolition blasting engineering safety special plan main structure construction plan waterproof engineering construction plan Gaozeng station scaffold engineering safety special plan. All-purpose scheme: high formwork engineering safety special scheme: demolition blasting engineering safety special scheme: slope construction safety special scheme: over 6m main structure construction scheme: auxiliary retaining structure earthwork excavation and support special scheme: auxiliary waterproof engineering construction scheme: scaffolding engineering safety special scheme: demolition blasting engineering safety special scheme: underground excavation engineering safety special scheme: completed. xx-5-30xx-5-30xx-7- 1xx-7- 1xx-7- 15xx-7- 15xx-8- 1xx。 -25xx-3-25xx-3-15xx-2-20 to be drawn, and then confirm. XX-6- 1xx-6- 10 will be drawn and then determined. 2.2. Engineering survey records (guarantee seven copies. 2 copies for the supervisor, division 1 copy) 1) record form of engineering survey handover pile (the seal of all pile extension units shall be fully covered) 2) record of engineering positioning survey (retest of construction pay-off inspection sheet) 3) record of engineering axis survey (retest of construction pay-off inspection sheet) 4) report of control survey test results 5) construction survey scheme 6) report of encryption point 2. Structural test records (4 copies are guaranteed by the project department, only one witness record is required) 1) test report of building materials 2) incoming raw material inspection list and accessories (accessories include: quality certificate and raw material inspection report), including supervision sampling report. 3) Witness records (only two sets, one set of original) 4) Mix proportion design report, notice and attachments of commercial concrete 5) Pile foundation test data 6) Strength report of all concrete 7) Inspection report of semi-finished products (mainly welded steel bars) 8) Notice of ingredients for commercial concrete construction, periodic inspection report of raw materials (including inspection report of raw materials such as sand, stone and fly ash) and concrete quality certificate (provided by the mixing station). 2.4, construction records and inspection lot 1) according to the partial project to collect and fill in. 2) All the above materials in the construction log (only two sets and one set of originals) must be signed, and there can be no missing items and signs, and they should be sorted and filed in time.

Third, the site construction control

On-site construction control includes several aspects: technical preparation before construction, control during construction, inspection and control at completion, construction survey and engineering test. Among them, construction survey and engineering test run through the whole construction process, which is the basis and focus of engineering construction. 3. 1 technical preparation before construction The technical preparation stage before construction is the next engineering task for deployment. To understand and plan the next step, we should do the following work well: 1, project overview, construction conditions and external environment, and sort out the information that has an impact on project construction; 2. Construction deployment and task division; Determination of key projects and construction arrangements; 3. Technical organization measures: including adopting new technologies, new processes, increasing production and saving, quality and construction safety measures, etc. 4, the number of main mechanical equipment and power supply, transportation and water supply; 5, the main material quantity and supply plan; 3.2 Control in Construction Control in construction is the key to the success or failure of engineering quality. The contents and requirements of inspection during construction are as follows: 1. Construction survey setting-out should be correct, and the accuracy should meet the specified requirements; 2. Organize the construction in strict accordance with the design documents, construction drawings, technical specifications and operating procedures; 3, materials, finished products, semi-finished products and equipment and other products of the factory inspection certificate, and in accordance with the provisions of the field test; 4, concrete, mortar specimens, earthwork compaction density test in accordance with the provisions, and meets the requirements; 5, the team to carry out "three inspection" activities, and recorded; 6, check the parts and quantity of the completed project, and check the quality level. 3.3 Completion inspection Completion inspection is the overall grasp and summary of the sub-projects. If there are any problems, they should be solved as soon as possible, so as not to affect the next construction. Contents and requirements of completion inspection: 1. Check whether the position, size, elevation, quantity and quality of the completed project meet the requirements of the contract, design, specification and standard inspection. When problems are found, they should be dealt with separately and completed within a time limit. 2, the provisions of all kinds of completion data is in line with the requirements. 3, check whether the engineering quality evaluation data is complete, and check whether the quality rating is correct. 3.4 Building survey engineering survey should follow the "Surveying and Mapping Law of People's Republic of China (PRC)" and the "Surveying and Mapping Regulations" where the project is located, and strictly implement the relevant national survey standards, technical specifications and relevant regulations on project quality, environment and occupational health and safety management. The quality of construction survey is the key to the smooth development and quality control of construction projects. In order to provide high-quality and efficient services, ensure the quality of engineering investigation and ensure the completeness and accuracy of investigation files, the investigation plan for xx years is as follows: 1. Organize the connection between the traverse and elevation measurement of adjacent projects with the supervision engineer to ensure the correct spatial position of the projects. Ensure the correct connection with adjacent projects and establish a complete quality assurance system. 2. Organize all business divisions to prepare investigation plans and monitoring plans. 3. Organize the survey engineers of each division to carry out the blue prints.the design work of each station. 4. Organize the calculation and review of detailed lofting data of two divisions. 5. According to the specification requirements, organize the contact measurement (throwing point) of each division. 6. Organize two divisions to regularly survey traverse points to protect encryption points. In strict accordance with the requirements of relevant subway regulations, the monitoring work of the two branches was carried out. 3.5 Engineering Test In order to strengthen the four-station test work and ensure the excellent engineering quality and the collection of completion data, the engineering test plan for xx years is as follows: 1. Supervise, guide and manage the testing work of branches; 2, supervise and urge the station operator to do a good job of sampling, sample delivery and data collection of raw materials, and make records (account). 3. Do a good job in quality control of concrete (commercial concrete) construction, such as slump, workability and bleeding. , and do a good job in the identification and maintenance of concrete specimens according to relevant specifications and standards, as well as the management of temperature and humidity records in standard curing rooms, timely inspection and pressure testing, and collect relevant reports in time. 4. Make weekly test and inspection plan and related management measures. 5. Go to each station every Sunday to collect test data and file them. 6. Carry out the test of four stations in strict accordance with the requirements of national standards and subway engineering related measures.

Fourth, summary.

Through freshman training, mutual learning of engineers and technicians, leadership guidance, construction site practice, etc., we strive to improve the overall business level of technicians in the engineering department, ensure that technicians are competent for their jobs, and strictly control the quality of the project, so as to ensure the realization of high-quality engineering goals and transport new talents for enterprises. The xx work plan of the engineering department is the action guide of the engineering department. All technical personnel in the engineering department strictly follow the work arrangement, fulfill their duties, conscientiously implement the quality policies of the state and the group company, earnestly study and implement various construction specifications, standard inspections, rules and regulations, be responsible for reviewing the quality evaluation of divisional and sub-divisional projects, ensure the technical quality, and make contributions to the smooth completion of the project and the realization of expected benefits.

Time flies, time flies, and it's going to enter the new year XX in a blink of an eye. The new year should have a new look. While summing up the past, I should have a good work plan for the new year in order to make greater progress and achievements in the new year.

XX is a very important year for the development of our company, and it is also a year full of challenges, opportunities and pressures for myself. I will continue to adhere to the concept of "careful design and dedicated service" and do my job well.

In next year's work, I will constantly sum up my work experience, analyze my work, find out the shortcomings and correct them. Keep up with the general direction of enterprise development and improve its own technical level. While completing my job wholeheartedly, I actively participated in the engineering construction examination related to my major. Be strict with yourself, constantly improve the requirements for yourself and improve the quality of work to meet the development of the company and itself, and more importantly, implement it in daily work.

The new year means a new starting point, new opportunities and new challenges. The future always fills us with passion because of its uncertainty. I seem to see that our department has become stronger. I will keep the essence and discard the dross. I will not work purely to complete the task, but improve my value by creating profits. I will devote myself to all the work with more enthusiasm, learn from all the employees of the company, build harmony and create brilliance together!