Three Summaries of Budget Division's Personal Work
Everyone should be able to write a work summary, which is the embodiment of our ability and the importance we attach to our work. Do you know how to write a work summary? The following are three sample essays on personal work summary of budget personnel compiled by me for your reference.

Summary of personal work of budget officer 1 I have been engaged in cost budget work in the company for xx years. The number of engineering projects is also increasing rapidly. According to the usage quota, I have used the building quota, decoration quota, municipal engineering quota and garden quota of xx province. According to the structural form, there are brick-concrete structure, frame structure and frame-shear structure. According to the number of layers, there are single-layer, multi-layer and high-rise buildings. According to the use, there are industrial buildings and civil buildings.

Being a budgeter is not only limited to the familiarity with the quota, but also includes the familiarity with construction specifications, standard atlas and construction technology. For example, the hook, lap and anchorage length of steel bars. According to the specification requirements, different parts, different concrete grades and different environments have different lap and anchorage lengths. This has a great influence on the calculation of reinforcement. The steel bars of a frame project are only hooked, overlapped and anchored, accounting for about x%~x% of the total steel bars. Therefore, it is very important for a cost personnel to master the construction specifications and standard atlas.

Now I summarize the steps of the budget as follows:

A, after receiving the complete drawings, don't rush to calculate the quantity, should check whether the quantity is consistent with the drawings directory, read the drawings carefully, understand the engineering structure, understand the design intent. Have a detailed understanding of the project, form the basic three-dimensional structure of the project, and make drawings records.

Second, collect the atlas of specifications and standards required for drawings and master their work contents.

Three, carefully read the construction organization design of the project, understand the construction deployment, construction direction, personnel and machinery configuration, which is helpful to apply the project quota.

Four, select the required quota and supporting fee documents and relevant notices and adjustment materials, and make market inquiry for unspecified cost information or special materials and equipment.

Five, the calculation of quantities must be calculated in accordance with the calculation rules of the selected project quota. The order of engineering quantity calculation is: underground first, above ground, indoor first, outdoor first, structure first, decoration later. Some are calculated according to the order of quota projects, and some are calculated according to the order of drawings, depending on your habits. I like to calculate according to the construction sequence, so that the thinking is clear, the process is clear and the process is familiar. Of course, this requires cost personnel to be familiar with technology and understand the construction sequence.

Six, apply the quota subtitle, pay attention to whether the work content is consistent with the construction drawings, specifications and standard atlas, and adjust the relevant content of the quota when it is inconsistent. When applying special scaffolding, we must understand the essence of quota.

Seven, the fixed fee is determined according to the project category and the construction site area. Therefore, it is necessary to determine whether the project is a first-class, second-class, third-class industrial building or a civil building, and whether the construction site is in cities, towns or other areas, so as to accurately determine the rate.

Eight, the adjustment of material prices must be based on the engineering material cost information released by the municipal construction project cost management institution.

Nine, the preparation of instructions, generally including the preparation basis, preparation quota and the number of fees and cost information. Budget software adopted, etc.

Ten, a binder, stamped with the relevant personnel professional qualification chapter, and signed.

Since I entered the big family of the company, I have learned a lot of professional knowledge in these busy days. Thanks to the company, you let me grow and play freely on this promising stage; Thanks to the leaders, your encouragement and tolerance made me feel the warmth of this big family of the company; Thanks to my colleagues, your selfless help and concern have improved my professional knowledge in all aspects, and at the same time let me understand the truth of mutual help and love.

A year has passed since the personal work summary of the budgeter. Looking back on this year's work, with the careful guidance of the company's leaders and the enthusiastic help of my colleagues, my ideological consciousness and professional ability have been greatly improved, and I am now qualified for the job of a cost engineer. During this period of work, I worked hard to complete my work and actively cooperated with my colleagues and other ministries. As a budgeter, I work according to the rules and regulations of the company and the engineering department, and finish the budget work of the engineering department on time and with good quality. The following is a summary of my work, mainly from the following aspects:

1. According to the requirements of company leaders, the completed work is as follows:

(1) Budget Audit of Underground Garage Electrical Engineering, Outdoor Low-voltage Electrical Engineering and Outdoor Weak Current in Aviation School Community of Zhuozhou City, Hebei Province

(2) Monthly report of electrical engineering in Xinyang Railway Station of Henan Province in June and July.

(3) Budget of existing drawings and construction drawings of electrical engineering in Langfang maintenance point

(4) Construction drawing budget of Langfang Railway Station fire electrical engineering

(5) Guangdong Panyu "Freedom City Garden Project" electrical engineering construction drawing budget

(6) Completed the calculation of electrical engineering quantity of Daqing West Railway Station.

2. Obey the work arrangement of the company leaders and actively do a good job outside the engineering department.

Everything is based on the interests of the company and cooperates with other departments of the company.

3. Use the rest time after work to strengthen study.

Usually pay attention to collecting the current quota documents and material prices in Henan Province, strengthen the study of quota calculation rules, quota description and engineering quantity calculation skills, and install professional knowledge such as software calculation and pricing;

4. Make a good work plan for next year, so that you can do every job in an orderly way.

I have come into contact with many new things, met many new problems, learned a lot of new knowledge and experience, and improved my ideological understanding and working ability. While learning a lot of new knowledge, I also understand my own shortcomings.

First of all, it is very important to improve the professional knowledge and skills of cost. Now is the era of automation, and the quotation of modern engineering is mostly the mode of list quotation. Fast electronic budgeting software is very important for a cost maker. After such a long training, I have basically mastered some basic skills of using Guanglianda pricing software and installing calculation software. I will strengthen this exercise and pay attention to learning skills in the future, which will not only improve the accuracy of the budget but also shorten the budget time.

Secondly, it is very important for a good cost engineer to be familiar with the quota. In my previous work, there were some technically complicated projects. Because I am not particularly familiar with the quota, my work efficiency is not high, and sometimes I am prone to make mistakes. In the next period of time, I plan to spend some time to get familiar with the budget quotas in Beijing, Hebei, Henan, Daqing and other places carefully, and I will be able to use them freely slowly, which will be of great help to the accuracy of the budget and final accounts of engineering quantities in the future, and I will also be able to do my work on time and with good quality.

Thirdly, some of the projects we received are only budget estimates, which require us to constantly sum up experience and analyze the cost indicators of different types of projects, so as to facilitate future work. At the same time, the relevant documents of the second-class expenses also need us to study and study constantly. Only by being familiar with the provisions of the document can we accurately calculate the project investment and complete the task well.

One more thing, in terms of work attitude, it is not enough just to be willing to study and not afraid of being tired. What I want to learn now is working methods, and what I want to learn is working attitude. I am responsible for the work I do. Unlike in school, it can be solved by correcting mistakes or saying sorry; It's real money now, and I have to be responsible for the company. So I will do everything carefully. In next year's work, I will continue to work hard, learn more work and experience from leaders and colleagues, correct and make up my own shortcomings and defects in time, and make better contributions to the company.

The above is my year-end summary. If there is anything wrong, please ask the leaders to criticize and give directions.

Summary of three people's work of budget officer In a blink of an eye, I have worked in the company for three years. Looking back on my work in the past three years, with the care and help of the company's leaders and colleagues, I have a deep understanding and understanding of the company's working environment, management model, organization, rules and regulations, and have made some progress in ideological awareness and business ability, and successfully completed all the tasks assigned by the company.

In order to do a better job in the future, sum up experience and draw lessons, the work in the past three years is summarized as follows:

First, seriously study business skills and actively participate in budget work.

Having good political quality and professional quality is the prerequisite and necessary condition for doing a good job. As a budgeter, I am a newcomer in the field of engineering budget, and I have little knowledge of the industry I am engaged in. In order to improve my own quality and adapt to the enterprise environment and work position quickly, I will be diligent and eager to learn from my colleagues if I don't understand anything. With the trust and help of company leaders and colleagues, I will constantly improve my business skills and adapt to the needs of my job as soon as possible. For the future, I will quickly integrate into this big group in a short time.

Second, in strict accordance with the rules and regulations of the company and departments, complete all the work arranged by the company on time and with good quality.

Since entering the company, with the support and help of leaders and colleagues, I have participated in the completion of the company's annual settlement; Actively participate in the company's bidding registration and bid opening. By personally participating in the whole process of budget work, I have a preliminary understanding of budget, deepened my understanding of budget concepts, and thus have a deeper understanding of budget work.

Three. Obey the work arrangement of the company's leaders and actively do other work arranged by the leaders.

At work, I can focus on the overall situation, respect my work and love my post, regardless of personal gains and losses. In addition to doing my job well, I can obey the work arrangement of the company leaders and take other tasks assigned by the leaders seriously, without shirking or neglecting. Use time scientifically and reasonably, and actively assist other departments and colleagues to carry out their work and complete other tasks arranged by the company while completing their own work.

Fourth, actively adapt to and abide by the implementation of the company's various management system reforms, and further strengthen the sense of responsibility.

In the past three years, the company's rules and regulations have been improved or further improved. I can actively respond to the company's rules and regulations, respect the leadership, obey the management of the company's leaders, strictly demand myself according to the company's existing rules and regulations and the professional ethics of budget officers, strengthen the sense of responsibility, and do my job in time. At the same time, we can actively unite colleagues, help each other and create a harmonious working environment.

Fifth, use the rest time after work to strengthen study.

In order to constantly improve my business skills and better serve my job, I can pay attention to searching the current quota documents and engineering calculation rules related to budget work after work, and strengthen my business knowledge such as engineering quantity calculation skills.

Summing up the work of this year, although we have made some progress and achievements in our work, there are still some shortcomings. Therefore, in my future work, I must carry forward my advantages, correct my shortcomings, foster strengths and avoid weaknesses, strive for greater achievements and constantly improve myself. Do your job well, give full play to your best ability and contribute to the development of the company.