The specific steps include 1, surface treatment of the inspected workpiece, generally grinding or solvent cleaning;
2. Apply penetrant; Spraying, brushing, soaking, etc. can be used, and the soaking time is generally 10 minute or according to the instructions of penetrant;
3. Remove excess penetrant, generally wipe it with a rag, pay attention to one-way wiping, and the rag should not be depilated;
4. Generally, the developer is applied by spraying, which should be uniform, not too thick and cannot be applied repeatedly;
5. The defects are evaluated after a certain period of time, usually 5-60 minutes.
* * * * * penetrant flaw detection is mainly used to detect surface opening defects of workpieces. *********