Fill in academic qualifications
"Education" and "degree" refer to the highest education, and the column of "graduation time, school and major studied" indicates the initial education and the later education. "Professional and technical post qualification evaluation form" "learning and training experience" column should also indicate academic qualifications.
Project scale filling
For the filling method of "project scale", please refer to the Classification Table of Civil Building Engineering Design Grade, Classification Table of Gas Professional Engineering Project Grade and Scale Table of Road and Bridge Professional Engineering Project, etc. If it is not convenient to divide the scale according to this, you can fill in the division method suitable for this group, such as the project scale belongs to the whole industry, unit and department. If I undertake a sub-project (sub-project), I should clearly state the scale of the project I undertake.
I'll play the role.
The column of "My Role" is filled in according to my role or position in the project, such as the person in charge of the work, the person in charge of the project, the documenter, etc.
Fill in the completion of the project
Project completion refers to whether it has been completed (completed), put into use or under construction (under construction), and the completion progress of the project under construction can be clearly stated.
Reward filling
"Award Name" fill in the full name or standard abbreviation of the winning project, such as "XX Science and Technology Progress Award"; "Grade" should be marked with Grade X and Grade X, such as "Provincial Grade II"; "Time" refers to the time of winning the prize rather than the time of the project; "Ranking" refers to the ranking of the applicant in the award certificate (description of the award); The listed awards should be proved accordingly, otherwise they will not be recognized.
Fill in the representative thesis
In the item of "representative papers", rank the column. If it is an independent work, fill in "independent works". If it is a co-author, indicate my ranking.
Fill in other documents
"Other papers" refers to papers other than the above three representative papers. According to the classification in the table, the number of articles can be listed item by item.
The application materials are true and correct.
All application materials must be true and correct. If the performance of the original unit is involved, the original unit must issue a performance certificate.
Customs declaration printing
The application form must be printed, and the spreadsheet can be downloaded from China Construction Human Resources Network.