In the process of waterway engineering management for many years, through practice and theory, we have explored a set of management measures "Waterway Maintenance Management Measures" which are more suitable for the project of fixing the sea and lifting water, and introduced them to you. On the one hand, a more reasonable and humanized management concept is introduced into the management concept; On the other hand, it can inspire other management aspects and play a role in attracting jade, so as to better connect with advanced management systems and provide links. At the same time, I think this management system is a model formed under the specific historical and natural conditions of Guhai Management Office, and it is impossible to apply it mechanically to other places. However, this idea and method can be used for reference in electromechanical, plumbing, personnel and other aspects, so I want to introduce this management concept to everyone, so that it can be used for reference by other management workers. At the same time, managers who formulate management systems are required to be very familiar with their jobs and have rich management experience. Only in this way can the established management system be more in line with the development law of things, closer to reality and truly serve the purpose of guiding practice with theory. First, the assessment object is all the staff of the channel maintenance post of Guhai Management Office. Two. Assessment Contents The work contents of waterway maintenance workers can be summarized into ten items, namely: building integrity, tree preservation, labor discipline, illegal occupation, dangerous situation treatment, canal embankment leveling, pit and groove repair, internal slope weeding, sundries removal and voluntary labor. These "ten work contents" are the work contents that channel maintenance personnel must complete. The assessment shall be conducted in accordance with the "Ten Work Contents". Three. Assessment standard 1. Building integrity: all kinds of hydraulic structures are intact, and no points will be deducted if they are lost, damaged or stolen. Theft damages buildings, each deduction 15 points.
2. Tree preservation: The trees in the waterway protection area are kept intact, and no cattle, sheep and other livestock enter the waterway to bite people, artificially cut down and other destructive phenomena, and no points will be deducted. Deduct points according to the degree of damage if it fails to meet the requirements: 2 points will be deducted for each tree with a ground diameter less than 5cm, and 5 points will be deducted for each tree whose bark is bitten by livestock; /kloc-below 0/0cm, 3 points will be deducted for each tree if the bark is bitten, and 8 points will be deducted if the tree dies or is cut; 10cm above, 4 points will be deducted for each tree whose bark is bitten by livestock, and 4 points will be deducted for each tree that dies or is cut off 10.
3, labor discipline: seriously abide by labor discipline, stick to the post without deducting points. AWOL, not according to the provisions of the inspection channel, found a deduction 15 points, was investigated by the management office once this item does not score.
4. Illegal occupation: there are no illegal buildings and illegal occupation within the scope of protection, and no points will be deducted. There is a new phenomenon of illegal occupation, this item does not score.
5. Danger handling: During the water cut-off, before and after the water cut-off, and after the rainstorm, timely check the dikes, large fill, aqueduct entrances and exits, trench bottoms, etc. Such as cracks, collapse, concrete slab collapse, water level exceeding warning level, etc. If found, report and deal with it in time without penalty points. If the report and treatment are not timely, 50 points will be deducted at a time, and those that cause adverse consequences (need to be repaired or cause danger or accident) will not be scored.
6. Leveling of the canal embankment: the daily maintenance is timely, the canal embankment is leveled, and there are no obvious potholes, ruts and water pits, and no points will be deducted. Maintenance is not timely, the flatness of the canal embankment is poor, and there are obvious puddles and ruts. The flatness is greater than 10 cm, and every 300m is deducted 10, and less than 300m is counted as 300m; For heavy vehicles (with a load of more than 3 tons) passing through the canal embankment, every deduction 10 will be found; Causing dike damage (need maintenance) does not score.
7. Recovery of holes and pits: The pit washed by rain within 2m3 will be backfilled and compacted within two days, and the rat hole and snake hole will be blocked by grouting in time without penalty points. Backfill is not dense, blocking is not complete 10 points; 50 points will be deducted if there is a rat hole or a hole in the canal embankment that is not handled in time.
8. Shovel grass on the inner slope: during the non-operation period, weeds between concrete slab joints shall be cleared in time as required, and no penalty will be deducted. If the task is not completed as required, it shall be ordered to complete the task within a time limit (or deduct the cost required to complete the work), and 10 points shall be deducted per kilometer.
9. Debris removal: Debris that affects water, traffic and beauty, such as stones with diameters greater than 10cm in the canal and outside the dike, will be cleared and buried in time without penalty points. If it is not completely removed, it shall be ordered to complete the task within a time limit (or deduct the expenses required to complete the work). At the same time, every kilometer will be deducted 10. The article is provided by /shualigongcheng/