1. Compilation basis 6
1. 1 construction contract 6
1.2 engineering design documents and geological exploration report 6
1.3 main specifications and procedures 6
1.4 main standard 6
1.5 Main Atlas 7
1.6 main regulations 7
1.7 others 7
2. Project overview 7
2. 1 general introduction 7
2.2 Surrounding environment and site conditions 8
2.3 Engineering Hydrogeology 8
2.4 Overview of Architectural Design 8
2.5 Overview of Structural Design 9
2.6 mechanical and electrical equipment design overview 1 1
2.7 Typical plan and profile of the project 12
2.8 Analysis of Engineering Features and Difficulties 12
3. Construction deployment 12
3. 1 construction management objectives 12
3.2 Construction deployment principles and overall construction sequence 12
3.3 Construction Organization 12
3.3. 1 construction organization setting 12
3.3.2 Project Department Leaders and Department Responsibilities 14
3.4 Number of major projects 14
3.5 Construction progress plan 14
3.6 Processing and Procurement of Materials and Equipment 14
3.7 labor force plan 14
3.7. 1 workforce planning 14
3.7.2 labor force curve distribution map 15
3.8 Coordination and Cooperation 15
3.8. 1 division of construction tasks 15
3.8.2 Organization and Coordination 15
4. Construction preparation 15
4. 1 technical preparation 15
4. 1. 1 general preparations 15
4. 1.2 Configuration Plan for Measuring, Measuring, Monitoring and Testing Instruments 16
4. 1.3 Construction Team and Scheme Preparation Plan 16
4. 1.4 Work Plan for Construction Test 16
4. 1.5 Plan of sample and sample room 17
4. 1.6 new technology promotion plan 17
4. 1.7 elevation survey and building positioning 17
4.2 Site Preparation 17
4.2. 1 temporary arrangement 17
4.2.2 Temporary water use arrangement 18
4.2.3 Temporary electricity utilization arrangement 18
4.2.4 Material stacking 18
5. Main construction methods 18
5. 1 dividing water section 18
5.2 Selection of main mechanical equipment 19
5.2. 1 Selection of large vertical transportation machinery
5.2.2 Main mechanical equipment 19
5.3 Construction method of divisional and sectional works 19
5.3. 1 construction survey plan 19
5.3.2 Foundation pit construction scheme 19
5.3.3 Waterproof Construction Scheme 19
5.3.4 Reinforcement Construction Scheme 19
5.3.5 Template Construction Scheme 19
5.3.6 Concrete Construction Scheme 19
5.3.7 Scaffolding Construction Scheme 19
5.3.8 Construction Scheme of Secondary Structure 19
5.3.9 Roof Construction Scheme 19
5.3. 10 Decoration and Decoration Construction Scheme 19
5.3. 1 1 seasonal construction scheme 20
5.3. 12 electromechanical installation construction scheme 20
6. Main management measures 20
6. 1 Subcontracting management measures 20
6.2 time limit for a project guarantee measures 20
6.3 Quality Assurance Measures 20
6.4 Safety Assurance Measures 20
6.5 Civilized construction and environmental protection management measures 20
6.6 Fire Management Measures 20
6.7 Technical management measures 20
6.8 Emergency Plan for Construction and Production 20
6.9 finished product protection management measures 20
6. 10 cost management measures 20
7. Construction site plan 20
Annex 20