Engineer's annual work summary personal general model essay (selected 6 articles) (1) Due to the manpower deployment of the company, I was transferred to xx project as a civil engineer at the beginning of the year. With the help and guidance of my project colleagues, I did my job wholeheartedly. Now I will briefly summarize my work and study in the past year as follows:
First, clear job responsibilities.
Responsible for the acceptance of engineering divisions, disciplines and inspection lots; Responsible for compiling and summarizing project supervision logs and supervision data; Conduct a comprehensive inspection of the key construction parts of the site and the station, report the quality and safety problems to the director in time, and take corresponding solutions. Responsible for on-site quality management, collecting, sorting and saving data management materials. Responsible for auditing budget, settlement, construction organization design, various construction schemes, material plans, on-site visas, design changes, etc. Responsible for on-site communication and written data transmission with the company and design institute on matters such as joint review of drawings, design change, slot inspection and subject acceptance. Responsible for coordinating the construction problems of the general contractor and subcontractors.
Second, the daily work
In the process of building construction, the main responsibility is to check the installation of labor and materials on site and report to the leaders regularly every day. If quality problems are found, it is required to rectify xx in time and report to the leader. Coordinate the construction problems of subcontractors and general contractors. Responsible for household acceptance and handover before property delivery. In the process of hardcover construction, he is mainly responsible for the design change of the construction model room, and conveys the relevant technical requirements of the company to the hardcover unit, and is responsible for reviewing and reporting the bathroom waterproof scheme and ceiling scheme. Responsible for the division, disciplines and inspection lot acceptance of two buildings. In the process of hardcover construction, he is mainly responsible for the audit of construction organization design, the budget audit and report of steel sandwich engineering quantity of the Fourth Bureau. Responsible for contacting designers to prepare valuable drawings. Responsible for the acceptance of ceiling keel, waterproof construction, kitchen and bathroom tiling, facade insulation and wall plastering on the construction site.
Third, find the shortcomings
Combined with the quality problems of engineering quality, problems such as ceiling cracking, toilet leakage, moldy wallpaper and alkali stone in the bathroom can be avoided during the construction of the first area, and the problem of ceiling cracking has been communicated. Double plasterboard is used in the design, and reinforcement measures are taken for weak parts. The problem of toilet water leakage has required the construction unit to report the scheme separately. In the cushion construction, steel wire mesh is used to strengthen the wall root, and the buried pipe construction is strictly required to avoid the brick sticking error caused by ultra-high buried pipe. When the waterproof construction is accepted, notify the regional engineer to carry out multi-party acceptance of the project, and strictly require the waterproof thickness and height; In the process of sticking bricks, the project engineer is required to stand by and avoid damaging the waterproof layer. The problem of uneven wallpaper requires strict acceptance of wall foundation construction. The problem of stone flashing requires you to strictly control the materials entering the site.
Engineer's Annual Work Summary Personal General Model essay (selected 6 articles) (Part II) In this year's work, I changed from an internship electrical engineer to a formal electrical engineer. During my internship, I mainly studied technical knowledge. Besides technology, I also studied management, which was a big problem for a young boy who just joined the work, but I was not discouraged. I humbly ask the old masters for advice in my work to enrich my experience. Only in this way can we manage it more reasonably and do electrical work better. As an electrical engineer, only by constantly summing up experience and lessons, and finding the shortcomings in work and production, can we make faster progress.
First, go deep into the scene and work hard.
At the beginning of this year, I was very happy to work in xx Project Department. Xx is a new power plant, and there are many defects left by the project. But I know that only such a site can make me enrich myself and learn a lot, and I will work with such a mentality. Although some things here are strange to me, because all I learned at school are things from books, this is the first practical application. I always work hard. Under the guidance of the master, I successfully completed the task assigned by the leader and further improved my professional level.
Later, I was officially promoted to engineer, and I deeply felt my responsibility. As an electrical engineer, my main responsibility is to be responsible for the support of electrical technology, formulate the maintenance arrangement of electrical equipment, the corresponding management regulations and technical operation measures, organize employees to do business training, and often go deep into the site to implement the technical transformation and minor repair projects proposed by the site to ensure the stable operation of the site equipment.
Over the past year, I have worked hard, earnestly performed my duties, constantly improved myself from the technical and management levels, and made great progress in all aspects. At the scene, my comrades and I are the same as above. When there is a problem with the equipment, we should actively go to the scene to deal with the fault and eliminate hidden dangers. Insist on going to the site every day to check the operation of equipment and the power supply of high and low voltage equipment: learn various technologies. By systematically mastering the technology from the shallow to the deep, I have a further understanding of the production process of this technology, and effectively combine the knowledge I have learned before with the production practice, so as to better combine theory with practice, better promote production, better reduce the labor intensity of comrades, more effectively improve labor production efficiency, and create more benefits for enterprises and society, laying a solid foundation. In other aspects, I meticulously improve and perfect the electrical safety regulations and measures, and carefully supervise their implementation.
Timely and comprehensive material planning and accurate spare parts parameters ensure the normal operation of the equipment. I am responsible for reporting the material plan of electrical equipment. At work, we should go to the site in time to check the problems, so as to make the spare parts more comprehensive and reliable, and avoid the delay in production due to the lack of spare parts. For material planning, selecting models seems to be a simple task, but it is also a university question. The parameters of various materials and how to choose the model need to be selected according to actual needs. Under the humble guidance of the leaders, I am growing step by step.
At work, first of all, I will resolutely not do things that my strict requirements do not allow employees to do, and set a good example for the employees on the spot. When implementing rules, regulations and measures, I will treat the work on site strictly, and I will resolutely stop the illegal and irregular behavior of employees. I will carefully organize and analyze the safety accidents and accidents that affect raw tea in production, and pursue the responsibility without going through the motions or taking the form, so as to implement the responsibility, educate and warn everyone.
Considering the details of the work, making overall plans, there are both safety education and specific work arrangements, that is, production and electricity consumption are considered, so that everything is not missed, work is arranged, implemented and inspected. Pragmatic, through unremitting study every day, I have continuously improved my theoretical level, professional level, practical experience and personal quality. Solid work, not staying on the surface, not afraid of difficulties, not afraid of hurting people, realistic and effective, further improving their management level.
Second, be committed to technological transformation and be brave in innovation.
At work, learn from the master seriously, constantly improve yourself, and use other time to learn higher and newer knowledge. Actively participate in the transformation of the website. Every technological transformation is a good opportunity for us to upgrade our professional skills. Now I don't have the ability to carry out large-scale project transformation, but I have always maintained a good attitude, devoted myself wholeheartedly to these tasks, stepped forward when encountering problems, and constantly enriched, learned and improved in cooperation with the monitor.
Third, shortcomings and deficiencies.
Because in many aspects, my skills and experience are insufficient, and I can't handle many problems well. In the future work, we must insist on going to the scene more often, dare to find, solve and deal with problems, never escape when encountering problems, and learn from experienced masters with an open mind. In addition, organize the experience and lessons in time, record all the problems that you don't understand, take the time to solve them, and make records so as to deal with the same problems better and faster in the future. Seriously study management methods and means, so that I can better complete the work and tasks assigned by the leaders in the future production organization. In my previous work, I often didn't consider the problem comprehensively and didn't consider the consequences, which not only delayed myself, but also affected others. In the future work and study, I must strengthen my study and make myself mature more quickly.
Engineer's annual work summary personal general model essay (selected 6 articles) (the third article) Over the past year, after completing one design task after another, I have made my professional knowledge have more room for practice and expansion, further exercised and enriched myself, increased my knowledge and experience, improved my professional and technical level, and made great progress in all aspects.
First, the improvement of ideological and political quality.
In many years of work practice, I deeply realized that only by being firm in politics and sober in thought can we maintain a good work style and a diligent spirit of being loyal to our duties, loving our posts and being dedicated to their work. Therefore, at work, I pay more attention to constantly supplementing myself and improving my political and theoretical literacy.
1, do a good job in study, especially theoretical study, and guide the work with correct theories. In study, on the one hand, I take part in collective study according to the prescribed study system, and remember my study notes and experiences well. At the same time, I also make good use of my own work and spare time to do self-study, pay attention to broaden my study scope and improve my comprehensive knowledge level.
2. Seriously practice the purpose of serving the people wholeheartedly in work and study, look at problems from the perspective of scientific development, and pay attention to people-oriented and environmental sustainable development when designing projects. Be strict with yourself, improve work efficiency, abide by professional ethics and pay attention to maintaining a good professional image. Correctly treat personal fame and fortune, adhere to a solid, serious and conscientious work attitude, and successfully complete various tasks.
Second, the level of technology and business has been continuously enhanced.
Since I joined the work, my technical level and professional ability have been greatly improved and strengthened. In my work practice, I often realize that the professional theory I learned in school is still relatively weak. Therefore, I continue to strengthen my study, humbly consult engineers and scholars with professional expertise, and never miss every opportunity to learn and improve, so that my technical level and ability are constantly strengthened. My major is civil engineering, and I am mainly engaged in structural design after I joined the company. At present, I can not only skillfully complete the special planning of structural specialty, but also skillfully design common industrial and civil buildings such as multi-storey brick-concrete structure, multi-storey reinforced concrete structure and steel structure.
Through one year's work, study and practice, my business technology and professional knowledge have been greatly improved, and at the same time, I have completed many design tasks for our hospital. In the past year's work, I participated in the structural construction drawing design of several residential quarters, accumulated rich experience and created benefits for the company.
Of course, this achievement can not be separated from the cultivation, trust and help of colleagues of the leaders. After all, my personal contribution is limited, but in these achievements, I can have my own efforts and dedication, as well as the joy of hard work, then I will be gratified. Because I didn't live up to the trust and care of the leader, I successfully completed the task given to me by the leader.
In the future work, I will continue to study hard, make continuous progress and continue to work hard to be a qualified engineer.
Engineer's Annual Work Summary Personal General Model essay (selected 6 articles) (the fourth article) Under the leadership of the company's Party Committee, all employees worked hard to practice Scientific Outlook on Development, united and cooperated, worked hard, successfully completed the supervision task of 20xx, and achieved a double harvest of spiritual civilization and material civilization. Under the correct leadership of the project department and the reasonable arrangement of the factory director and the factory director's representative, the company's quality goal is taken as the work goal. Based on the enterprise spirit of "unity and hard work, pioneering and pragmatic, scientific and fair, dedication and dedication", through one year's efforts, I basically achieved this year's work objectives, mainly including daily supervision and completion acceptance, as well as information management in the early stage of supervision. As a member of the supervision company, we will report our work and study this year to the leaders as follows:
20xx65438+1October-65438+1October, I was mainly responsible for the supervision of buildings 2# and 7#. Due to the shortage of manpower in the later period, I undertook the supervision of 5# building and outdoor landscaping, so I always insisted that I was a qualified supervisor and loved my job. Have a good work style and hard-working spirit; Strict working attitude and correct ideology and morality; Abide by national laws and regulations and the rules and regulations of enterprises; Obey the organization's distribution, suffer first, then enjoy, do your duty, and conscientiously complete all the work assigned by the supervision department. In daily work, I can be strict with myself, strictly perform my duties, stand on a fair stand and solve practical problems independently. In my life, I can respect my leaders, unite with my colleagues, and help comrades in need to solve problems in life and study.
The website is very confusing in terms of contract and website management. In the absence of bidding for individual projects, the construction unit organizes the construction unit to start construction, and the construction strength of the construction unit is weak and the construction team is complex. For example, in the late renovation project of Building No.7, no information (technical scheme of sub-project construction, application for personnel inspection, application for equipment inspection, application for commencement of sub-project, etc.) was submitted before construction. ), the construction team was subcontracted by Party A for more than a dozen times. The work of submitting xx is complicated and lacks unified management, which leads to confusion in on-site management. Due to the weak technical and economic strength of the construction unit, I actively put forward suggestions on the construction technology and construction technology of the construction unit; The problems found in the process require the construction unit to rectify in time, which avoids the reduction of the unqualified rate of finished products and speeds up the project progress.
Strict company attendance discipline, due to the heavy tasks and few personnel in the later period, and the construction unit requires that the project progress coordination meeting must be held every night, I volunteered to work overtime at night and do a good job in sorting out the meeting minutes. It has become a habit to work overtime to 1 1 at night, which has achieved the goal of 24-hour supervision proposed by the company.
I was transferred to the construction site from 10 to 10 in 20xx, engaged in site management and information management.
As information management, first define its characteristics:
(1), with a large amount of information and complicated relationship;
(2) The information management system is strict to avoid omissions. Information is not only the basis of supervision engineer's control, but also the basis of supervision decision-making, and it is also an important medium to coordinate the relevant units of project construction. There are many names of documents or materials from owners, contractors, design units and geological units. In order to facilitate the inquiry, it is necessary to classify and summarize them, which is complicated to do. I do this work from the following aspects:
Correspondence between each unit should be registered by unified number, and then the receipt record should be filled in, handed over to the reading clerk according to the specialty and the person in charge, and promptly urged to handle it on schedule. The on-site materials are managed by the on-site supervisor, and I have urged them to be handed over in time, but this work is still blank. Therefore, the field data management system still needs to be improved and strengthened. In order to facilitate the preparation of meeting minutes, basically every meeting is attended on time and recorded. Because the summary is an incisive exposition and high generalization of the meeting content, it is higher than the meeting summary. This involves the conversion from oral language to technical terms. If I don't understand anything, I will actively consult my colleagues and try my best to make the work more perfect and minimize the error rate of meeting minutes. Most of the data in the monthly supervision report comes from the supervision log. Before making the monthly report, you must study the supervision log carefully and understand the details thoroughly. Only in this way can the monthly report be perfected.
Looking back on one year's work, I have worked hard and sweated. While affirming my achievements, I still have many shortcomings: sometimes I feel that I exercise my supervisory power, pay little attention to the opinions of construction workers, pay little attention to working methods, and my working methods are not flexible enough; Due to the lack of understanding and thorough understanding of norms and supervision procedures, the decision-making ability in the work is lacking, and the work cannot be well coordinated in an all-round way; The overall arrangement ability is poor and the problem is not comprehensive enough. I intend to learn more about management coordination and on-site technical ability from leaders and colleagues in my future work. Rigorous words and deeds, speak according to, pay attention to grasp the scale when giving suggestions to the construction unit; Strictly abide by company discipline; Make more efforts in document processing and writing to ensure the accuracy and high universality of writing. Further do a good job in editing and editing engineering memorabilia, and improve the practicability of the monthly supervision report; Establish and improve various account management forms to ensure that all kinds of information are well documented. In the future work, I will try my best to practice Scientific Outlook on Development, correct my shortcomings, give full play to my advantages and make my own contribution to the construction and development of the company.
Engineer's annual work summary Personal general model essay (selected 6 articles) (the fifth article) served as engineer's professional technical post, worked in X special maintenance project successively, and served as project chief engineer and project manager successively. The quality of many projects has reached excellent engineering standards. During the five years of front-line work in construction, under the direct leadership of the general manager and chief engineer of the company, I meticulously carried out technical management and strictly controlled the project quality. After several years' efforts, the project management department of all construction projects of the company has established a strict management system and obtained the internationally recognized X certification of quality management system of construction enterprises. In the past five years, my professional and technical potential has also been enriched and improved in the process of contributing my intelligence to the development of the company. In a word, I have done some useful work in the past five years, but there are still many problems to be improved.
First, promote the use of new technologies and build quality projects.
Engineering quality is the life of construction enterprises. In order to obtain excellent engineering quality, technical managers are required to have the advanced consciousness of creating excellent projects. As the technical director of the project, I will take the lead in establishing and improving the relevant technical and quality management system of the project department. According to the construction method of the project, with me as the person in charge, the project quality objectives are decomposed into various professional and technical posts, and the construction is organized according to the requirements of technical posts. A series of management systems, such as technical review system, engineering quality inspection system, hidden acceptance system, quality common fault control measures and semi-finished product protection measures, have been established successively, which is conducive to ensuring engineering quality. Construction was carried out in strict accordance with the requirements of design and construction drawings, national specifications, procedures and general atlas, and all sub-projects were carefully completed in accordance with the requirements of creating quality products, thus achieving the quality goal of "creating quality products with high standards and high quality". Through the direct participation and control of the technical work of the project, the quality, progress and benefit of the project have received good results.
Two, to study professional and technical business, do a good job.
In many projects, due to tight time and heavy tasks, I have to take the initiative to put down my personal rest time, devote myself to my work and work overtime without regrets, which fully embodies the vanguard and exemplary role that a young professional and technical personnel should have.
In daily work, with solid professional knowledge and theoretical foundation, I feel like a duck to water in my work, and I am proficient in everything from technical guidance and quality inspection and acceptance on the construction site to verification and management of construction technical data. The technical documents and all kinds of application materials formed in the work are rigorous and standardized, which has won the honor for the enterprise.
Three, the implementation of computer office, the use of high-tech means to improve the economic efficiency of enterprises.
While learning professional technical knowledge, I also tried to explore and learn computer software and hardware knowledge, and successfully applied X series software to daily construction management. Through continuous study and practice, I worked hard to promote computer management of engineering management materials, complete word processing and print various record forms and text materials. Using Excel to store and analyze engineering information brings quantitative basis for engineering decision-making. Using X to make electronic slides for training, using modern multimedia forms to vividly explain the knowledge of architectural technology and common sense of architectural structure, completely changing the traditional education and training methods, and making high-tech and modern technical means really serve production and quality management. The popularization and application of X computer-aided design drawing software in the work has completely freed the construction technicians from the heavy burden of drawing by hand with drawing boards and pencils, making engineering drawing extremely simple.
Through the study and study of computer software and hardware knowledge, I completed the construction of the company's internal computer local area network, so that computers in all departments can enjoy resources, besides data, they can also enjoy printers, saving a lot of valuable funds and achieving good economic benefits. In order to meet the needs of the development of the times, we must constantly learn and update our knowledge. To this end, I took every opportunity to participate in various training courses and technical exchange activities. During my tenure as an engineer, I participated in various special trainings organized by relevant departments many times and obtained the certificates of registered supervision engineer and testing engineer of the Ministry of Communications.
Engineer's annual work summary personal general model essay (selected 6 articles) (6 articles) Unconsciously, I have been in xx company for almost 3 years. In my work, I have experienced many ups and downs, met many mentors and gained many lessons. Thanks to the leadership for giving me room to grow up, courage and confidence.
In the past few years, through our unremitting efforts, we have made some achievements in our work, but there are also many shortcomings.
Looking back at 20xx, the work is summarized as follows:
First, manage and maintain the auxiliary tools needed in production. Those that are oxidized or cannot be maintained should be scrapped and re-purchased.
Secondly, in order to assist production and have a higher production pass rate, we regularly check the production test points every day to check whether the equipment is in good condition and carry out maintenance, repair and replacement. When the production elongation is abnormal, it will also inform us to analyze and deal with it in time to ensure the smooth production.
II. Preliminary statistics of auxiliary material production in 1 year are as follows
1. 100 Rong & gt III. Statistics of maintenance tools in daily work
1. Maintenance of constant temperature soldering iron: about 150 sets.
2. 100 Rong & gt; Fourth, work experience.
I used to know that doing my job well was a good job. A good job is for the enterprise. Actually, it is not. In this year, the unity and friendship among colleagues have rendered my enthusiasm, and the encouragement and support of my boss have strengthened my confidence. Let me gradually understand that doing my job well is not entirely a good employee, but a good employee needs a sense of responsibility. A good job is not only for the company, but also for yourself.
I learned a lot in the big family of xx, how to deal with people better, how to communicate with people better and how to deal with problems better. Of course, I also have many shortcomings. I occasionally do things that have nothing to do with work at work. I hope the leader can tolerate my temporary misconduct. I will definitely get rid of these bad habits and be an excellent employee in my future work.
Verb (abbreviation for verb) Work plan for next year.
Study hard, strive to improve their own quality and work ability, and fulfill their duties and responsibilities as soon as possible. Do a good job at the same time, seriously complete other affairs arranged by the leadership. And cooperate with relevant departments. Finally, I wish you all new achievements in the new year, and I wish our company prosperous and rich in financial resources!