Authority of supervisors
Terms of reference of the chief supervision engineer

(1) responsibility

First, determine the division of labor and job responsibilities of the personnel of the project supervision institution;

B, presided over the preparation of project supervision planning \ examination and approval of project supervision implementation details, and is responsible for managing the daily work of project supervision institutions;

C, review the qualifications of subcontractors, and put forward review opinions;

D, check and supervise the work of supervision personnel, according to the progress of the project can be deployed, the incompetent personnel should change jobs;

E, presided over the supervision work meeting, issued by the project supervision agency documents and instructions;

F. Examine and approve the commencement report, construction organization design, technical scheme and schedule submitted by the contractor;

H, review and handle engineering changes;

I, presided over or participated in the investigation of engineering quality accidents;

J. Mediation of contract disputes between the construction unit and the contractor, handling of claims, and examination and approval of project extension;

K, organize the preparation and release of supervision monthly report, supervision work stage report, special report and project supervision work summary;

L, review and sign the quality inspection and evaluation data of division projects and unit projects, review the contractor's application for completion, organize supervisors to conduct quality inspection on the projects to be accepted, and participate in the completion acceptance of the projects;

M, presided over the project supervision information.

N, complete the relevant matters assigned by the leadership temporarily.

(2) authority

A, have the right to reward the incompetent supervisor of the supervision department, and make punishment opinions.

B, have the right to issue the project commencement/resumption report and the project suspension order.

Terms of reference of professional supervision engineer

(1) responsibility

A, responsible for the preparation of the detailed rules for the implementation of the professional supervision;

B, responsible for the specific implementation of the professional supervision work;

C, organize, guide, inspect and supervise the work of professional supervision, and make suggestions to the chief supervision engineer when personnel need to be adjusted;

D, review the plans, schemes, applications and changes related to this major submitted by the contractor, and report them to the chief supervision engineer;

E, responsible for professional subdivisional work acceptance and concealed engineering acceptance;

F, regularly submit the report on the implementation of the professional supervision work to the chief supervision engineer, and timely report and ask for instructions on major issues to the chief supervision engineer;

G, according to the implementation of professional supervision work, completes the supervision diary;

H, responsible for the collection, summary and sorting of supervision data of this major, and participating in the preparation of supervision monthly report;

First, check the original vouchers, inspection reports and other quality certificates of the materials, equipment and components in the site and their quality status. If necessary according to the actual situation, conduct parallel inspection on the materials, equipment and components in the site, and sign after passing the inspection;

J, responsible for the professional engineering survey work, audit engineering survey data and original documents.

K, complete related matters temporarily assigned by the leadership.

(2) authority

A, have the right to refuse to sign and recognize the engineering materials, components and equipment that have not been accepted by the supervisor or are unqualified.

B, have the right to refuse to sign unqualified process and concealed work.

C, have the right to notify the contractor of the quality defects in the construction process of the supervision engineer, require the contractor to make rectification, and check the rectification results.

Terms of reference of supervisors

(1) responsibility

A, under the guidance of professional supervision engineer to carry out on-site supervision work;

B, check the contractor's manpower, materials, main equipment and its use and operation, and make inspection records;

C, review or directly obtain the relevant data of engineering measurement from the construction site and sign the original documents;

D, according to the design drawings and relevant standards, as a station work, found that the problem is pointed out in time and report to the professional supervision engineer;

E, completes the supervision diary and related supervision records.

F, complete related matters temporarily assigned by the leadership.

(2) authority

A, in the supervision work, found that the problem has the right to ask the contractor for rectification.

B, have the right to check the quality of materials put into the project by the contractor.

engineer

Supervision engineer refers to the engineering construction supervision personnel who have passed the national unified examination, obtained the qualification certificate of supervision engineer and registered. The supervision engineer supervises the project quality on behalf of the owner and is the bridge between the owner and the contractor. It not only requires practitioners to understand engineering knowledge and cost accounting, but also requires them to be very clear about building regulations. Chief supervision engineer refers to the supervision engineer authorized by the legal representative of the supervision unit in writing, who is fully responsible for the performance of the entrusted supervision contract and presides over the work of the project supervision institution. In addition, supervisors also include professional supervision engineers and supervisors, but in the whole process of information system engineering construction, the role of chief supervision engineer is very important for supervision quality.

What did you learn in the exam?

Supervision is divided into five majors: industrial and civil construction, water supply and drainage and equipment installation engineering, HVAC and equipment installation engineering, electrical installation engineering and road and bridge engineering.

Examination time

There is no fixed examination time. After signing up for a certain number of people, organize training and then conduct a unified examination.

subject of examination

1. Basic knowledge of laws and regulations related to construction projects and engineering supervision (hereinafter referred to as "basic knowledge") for 90 minutes.

2. Professional engineering basic theory and supervision practice (hereinafter referred to as "supervision practice") 120 minutes.

registration requirement

Those with technical secondary school education or above (including high school education) and engaged in on-site quality inspection of building decoration for more than two years.

tuition

Training fee 500 yuan (including examination fee and data fee).

Registration materials

1, copy of ID card.

2. Six one-inch bareheaded color photos with the same background.

3, "National Construction Technology Management Post Training Examination Registration Form" (see annex, sealed by the unit).

Obtain a certificate

Generally, you can get the certificate after three months of examination.

construction supervision

subject of examination

There are four examination subjects, specifically: basic theory of construction project supervision and related laws and regulations, construction project contract management, construction project quality, investment and schedule control, and case analysis of construction project supervision. Among them, "case analysis of construction project supervision" is the subjective question, which is answered on the test paper; The other three subjects are objective questions. Answer them on the answer sheet.

Examination requirements

Candidates can bring pens or ballpoint pens (black or blue), 2B pencils, erasers and calculators (mute, no storage and editing functions) during the examination.

Examination procedure

The examination is divided into four and a half days, and the examination time for "Engineering Construction Contract Management" and "Basic Theory and Related Regulations of Engineering Construction Supervision" is 2 hours; The examination time of "Engineering Construction Quality, Investment and Progress Control" is 3 hours; The examination time for case analysis of engineering construction supervision is 4 hours.

Apply for qualification

(a) who abide by the law and meet one of the following conditions of China people and citizens, can apply to participate in the national supervision engineer qualification examination.

1, 1970 (including 1970), graduated from a technical secondary school majoring in engineering technology or engineering economy, has a college degree or above, and has obtained an intermediate position in engineering technology or engineering economy in accordance with relevant state regulations, and has served for three years;

2, in accordance with the relevant provisions of the state, to obtain senior positions in engineering technology or engineering economy;

(2) Applicants who are engaged in engineering construction supervision and meet the following four conditions at the same time may be exempted from the two subjects of Construction Project Contract Management and Construction Project Quality, Investment and Progress Control, and only take the exams of Basic Theory and Related Provisions of Construction Project Supervision and Case Analysis of Construction Project Supervision.

Graduated from technical secondary school (including technical secondary school) majoring in engineering technology or engineering economy before 1 and 1970 (including 1970);

2, in accordance with the relevant provisions of the state, to obtain senior positions in engineering technology or engineering economy;

3. Engaged in engineering design or engineering construction management for 15 years;

4, engaged in supervision work 1 year.

The requirements for academic qualifications in the registration conditions refer to the official academic qualifications recognized by the national education administrative department, and the deadline for calculating the working years of related majors is 201kloc-0/year 65438+February 3 1 day.

Hong Kong and Macao residents who meet the registration requirements can sign up for the national supervision engineer qualification examination according to the spirit of the Notice of the former Ministry of Personnel on Doing a Good Job for Hong Kong and Macao Residents to Participate in the Professional and Technical Personnel Qualification Examination held in the Mainland (No.9 [2005] of the Ministry of Personnel). When applying for registration, Hong Kong and Macao residents shall submit the corresponding professional qualifications or degree certificates recognized by the administrative department of education of the State Council, proof of working experience in related occupations, identity cards of residents and other materials.

Examination time

The examination is held once a year, and the examination time is generally arranged in late May. In principle, set up test sites in provincial capital cities.

Examination time: 20 12. Examination time for supervision engineer: May 26th and 27th.

20 12 supervision engineer examination time:

On may 26th, 9:00- 1 1:00, contract management of construction project.

14:00- 17:00 quality, investment and progress control of construction projects

On May 27th, 9: 00- 1 1: 00, the basic theory of construction project supervision and related laws and regulations were presented.

14: 00 ——18: 00 construction project supervision case analysis

Achievement management

The examination takes two years as a cycle, and those who take the examination of all subjects must pass the examination of all subjects within two consecutive examination years; Those who meet the exemption part of the subject examination must pass the prescribed two subjects within an examination year before obtaining the qualification certificate of supervision engineer.

Book information

Title: Producer Qu

Press: Huazhong University of Science and Technology Press

Release date: 2065438+March 00.

ISBN: 9787560959 1 15

Format: 16

Pricing: 45.00 yuan

brief Introduction of the content

The supervision is divided into eight chapters, which are the basic theory of engineering construction supervision, the quality supervision of basic engineering, the quality supervision of main structure engineering, the quality supervision of underground waterproof engineering, the quality supervision of building ground engineering, the quality supervision of building decoration engineering, the quality supervision of building water supply and drainage and heating engineering, and the quality supervision of building electrical engineering.

"Supervisor" can be used as a teaching material for the post qualification training of supervisors in construction enterprises, and can also be used as a reference for high and intermediate vocational and technical education and teaching and construction technicians in industrial and civil buildings and civil engineering.

Library catalogue

1 basic theory of engineering construction supervision

The basic concept of 1. 1

1.2 steps of construction project supervision

1.3 Project Supervisor

1.4 construction project supervision contract management

1.5 investment control in construction stage of construction project

1.6 implementation, inspection and adjustment of construction progress plan

1.7 safety management of project supervision institutions in construction stage

2. Quality supervision of building foundation engineering

2. 1 quality supervision of foundation engineering

2.2 Pile Foundation Engineering Quality Supervision

2.3 Foundation pit engineering quality supervision

2.4 earthwork quality supervision

3 main structure engineering quality supervision

3. 1 Quality Supervision of Concrete Structure Engineering

3.2 masonry engineering quality supervision

3.3 steel structure engineering quality supervision

4 underground waterproof engineering quality supervision

4. 1 quality supervision of underground building waterproof engineering

4.2 Quality Supervision of Waterproof Works with Special Construction Methods

5. Quality supervision of building ground engineering

5. 1 quality supervision of base course laying

5.2 Quality Supervision of Integral Surface Laying

5.3 Quality Supervision of Board Laying

5.4 Quality Supervision of Wood Surface Laying

6. Quality supervision of architectural decoration engineering

6. 1 Quality supervision of plastering project

6.2 Windows and doors engineering quality supervision

6.3 Quality Supervision of Ceiling Project

6.4 Quality Supervision of Lightweight Partition Wall Project

6.5 Quality Supervision of Finishing Works

6.6 curtain wall engineering quality supervision

6.7 Quality Supervision of Finishing Works

7 building water supply and drainage and heating engineering quality supervision

7. 1 Indoor Water Supply and Drainage System Engineering Quality Supervision

7.2 Quality Supervision of Sanitary Ware Installation Project

7.3 Indoor heating system installation engineering quality supervision

7.4 Outdoor water supply and drainage pipe network installation engineering quality supervision

7.5 Quality Supervision of Outdoor Heating Pipe Network Installation Project

7.6 Quality Supervision of Heating Boiler and Auxiliary Equipment Installation Project

8 quality supervision of building electrical engineering

8. 1 quality supervision of distribution system

8.2 Power supply and distribution system installation quality supervision

8.3 Quality Supervision of Electric Lighting Installation

8.4 Quality supervision of lightning protection grounding and equipotential bonding