On March 12, I was hired to work in Changzhou Cheng Zhen Construction Engineering Supervision Company, and was assigned to three nearby construction sites (far from my home) to supervise civil engineering. I have been working for three months. With the help of company leaders and comrades, I successfully completed the corresponding supervision tasks in the past three months, which was recognized and praised by the owners and contractors, and the work of municipal engineers was summarized. During the supervision work, I worked hard, conscientiously, did not dare to be tired, worked carefully, and had a good professional ethics and a strong sense of responsibility. Now I will make the following report on my work and management experience in the past three months.
I. Work situation
When I first arrived at the construction site, I was in a different place, but I was faced with objective unfavorable factors such as a large amount of supervision tasks, a wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties. In practical work, I actively contacted the owners and contractors, communicated with them and coordinated various relationships, so as to carry out supervision work as soon as possible, and take the time to get familiar with the construction drawings and related design instructions. In the shortest possible time,
In the actual supervision work, I ask the construction unit to implement total quality management, establish and improve the quality assurance system, and ensure that there are commencement reports, construction measures, technical disclosure, positioning review, material and equipment testing, concealed engineering records, quality inspection, special inspection and completion data.
In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submitting relevant documents (copies), understanding the general situation of technical force, main building installation experience, etc. , check the supply of sand, stone, cement, steel and other materials and the mixture ratio of concrete and mortar.
According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.
Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.
For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring project of civil engineering, the leveling of beam is a key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once negligence may cause engineering quality accidents, once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take side-by-side supervision measures, strictly supervise the construction of various parts, and strictly supervise the construction quality.
In the process of supervising the construction, Wujin Jian 'an Construction Team found that there were quality problems in the building material fly ash brick used by the team. Although the contractor has a laboratory quality inspection report, in the attitude of being responsible to the owner, the batch of bricks are sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the parts with quality defects to meet the quality standards required by the design and specifications.
In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality. The construction unit is required to strictly implement the national and local construction and installation quality inspection system during the construction of each working procedure, timely check and confirm the relevant construction quality reports submitted by the construction unit, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.
Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly. During my supervision of the third construction site, I actively coordinated the relationship between various units, making them cooperate with each other, support each other, make good connections, and ensure the construction quality and progress. Through the above work, I completed the supervision of the workshop office building project of Tian Li Turbocharger Equipment Co., Ltd., the workshop office building project of Changzhou Yamazaki Motorcycle Equipment Co., Ltd. and the civil engineering project of Zhongdi Electric Co., Ltd., and gained a lot in three months' supervision, but there are still some shortcomings. For example, I am an environmental engineering major, and I don't know much about the professional knowledge of civil engineering, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries. Therefore, I need to continue to study hard in various subjects and constantly improve my professional ability and level.
Good summary. First of all, through more than three months of internship and practice, I have learned a lot of practical knowledge. The so-called practice is the only criterion for testing truth. Through practice, I have closely observed the whole building construction process and learned a lot of applicable and specific construction knowledge, which is often rarely contacted and paid attention to by my school, but it is also very important and very basic knowledge. After studying and practicing many specific construction methods in and out of class, I have a more real and in-depth understanding of many specific construction details and management processes. Construction project is the construction process and achievement of a building product by the production object of a building construction enterprise, which can be the construction of a building project, or the construction of a single project or a unit project. Its main features are: first, the construction task of building projects or single projects or unit projects; Second, the enterprise construction enterprise is the main body of management; Third, the scope of the task is determined by the project contract. Construction project management includes the following aspects:
A, the organization and management of construction projects
Second, the construction quality management
Third, the cost management of construction projects
Four, construction safety production and civilized construction management
To manage a project well, it is necessary to control the specific construction steps from all aspects. The management experience and practices mentioned above are obtained from my knowledge study and construction site work in recent years. College life is tense and full of expectations. In my spare time, I always look forward to packing my bags, staying away from my relatives and friends and teachers, and going my own way. However, when we can finally leave the nest built for us by our elders like a newly feathered eagle and step onto the big stage of social work alone, we find that the road of life is so bumpy that anyone's success has experienced ups and downs. During the short three-month internship, I learned a lot. I continued to work hard and study in society, adjusted my mentality, changed from a passive state when I first started social work to an active state when I started to adapt to society, and continued to devote myself to intense work with a relaxed mood and abundant energy. This internship made me deeply realize that reading is a way to increase my knowledge and broaden my horizons, but it is also an excellent choice to improve my comprehensive quality through more practice, being in the middle of practical things, touching the pulse of society and setting a position for myself.
The school arranged an internship to learn practical knowledge in this big school. This is also my first real contact and feeling with society. I am very happy to come to Changzhou Cheng Zhen Supervision Company, and I am honored to get in touch with these masters to bring me knowledge and help me at work. In practice, I can fully combine the theory and practice I have learned and make clear my future development direction. Although I encountered some obstacles such as language at the beginning of my internship, I knew my own shortcomings, studied hard, worked hard and actively faced every new opportunity.