Self-inspection report on flood control safety inspection before flood season
Do a good job in flood control and drought relief on 20 17 to ensure that water conservancy projects play a role in disaster prevention and mitigation. The following is the self-inspection report of Chinese puzzle arrangement for your reference.

2065438+self-inspection report on flood control safety inspection before the flood season in 2007 1 According to the spirit of the document Notice of the Provincial Water Resources Department on Doing a Good Job in Flood Control Safety of Water Conservancy Projects in 20XX (Chuanshuihan (201X) No.271), our bureau immediately arranged the deployment, and according to the requirements of the document and inspection, from 3.

First, the safety inspection of water conservancy projects before the flood season

There are 34,969 water conservancy projects in our city, including 438 reservoirs (3 medium-sized reservoirs, 66 small (I) reservoirs and 369 small (II) reservoirs), 25,929 mountain ponds, 264 stone weir 1.264 water diversion projects. The focus of this spot check is on water conservancy projects under construction, medium-sized reservoirs, key small (I) reservoirs, important Shanpingtang, Shihe weir, canal systems and buildings, vessels used for reservoir production, and water quality of rural centralized water supply stations.

In order to ensure the safety of people's lives and property, our bureau will take this safety inspection as an important work at present, formulate measures and implement responsibilities. All counties and districts are required to carry out major inspections of water conservancy projects that have been built and are under construction, make good registration records, be aware of them, eliminate potential safety hazards in time, and ensure the safety of water conservancy projects. Our bureau has set up five pre-flood safety inspection teams with bureau leaders as the team leader and the heads of relevant departments as members. On the basis of self-examination in counties and districts, the water affairs bureaus and water management units in all districts and counties conducted spot checks on some important water conservancy projects in accordance with the requirements of the Measures for Safety Inspection of Reservoir Dams in Sichuan Province. The spot check is basically consistent with the pre-flood inspection summary reported by counties and districts, and the water affairs bureaus of counties and districts attach great importance to flood control work. Conscientiously implement the spirit of the Document Notice of the Provincial Water Resources Department on Doing a Good Job in the Safety and Flood Control of Water Conservancy Projects in 20XX, and make pre-flood inspection and flood control arrangements for all projects.

(A) a clear understanding of the situation, the implementation of flood control responsibility system

This year, our city suffered the worst drought since 2006. According to the analysis and forecast made by the provincial flood control and drought relief headquarters at the end of March, a serious drought occurred in southwest China this year. Drought is likely to cause floods? It is said that in the flood season this year, the possibility of local heavy rain and flash floods in our city has increased, and the situation of safe flood season is grim.

The Municipal Party Committee, the Municipal Government and the Municipal Flood Control and Drought Relief Headquarters have always attached great importance to flood control and drought relief. According to the Flood Control Law and the regulations and requirements of the National Defense General on the flood control responsibilities of the chief executives of local people's governments at all levels, our city has implemented and improved various flood control responsibility systems with the chief executive responsibility system as the core. The responsibility system for flood control safety of water conservancy projects supported by hierarchical responsibility system, departmental responsibility system, technical responsibility system and post responsibility system. At present, the flood control equipment of some water conservancy projects is in good condition and the information transmission is smooth. Flood control work implements the chief executive responsibility system, departmental responsibility system, technical responsibility system and post responsibility system. The flood control responsible persons of three medium-sized reservoirs and two medium-sized water conservancy projects under construction in the city have been reported to the Provincial Water Resources Department and publicized; The key points are small (i) the person responsible for flood control of water conservancy projects has been implemented, and all districts and counties have been publicized in relevant media and reported to the Municipal Water Affairs Bureau for the record; Other water conservancy projects have implemented the corresponding flood control responsible persons according to the requirements of hierarchical management.

In order to do a good job in flood control this year, the Municipal Flood Control and Drought Relief Headquarters issued the Notice on Seriously Preparing for Flood Control in 20XX and the Opinions on Flood Control in Luzhou City respectively, requiring all levels and departments to seriously prepare for flood control and implement flood control institutions, flood control responsibility system, flood control teams, flood control materials, flood control communication, hydrological forecast and flood control plans. Relevant departments with flood control tasks have also set up special flood control institutions, defined the responsible persons of flood control administrative leaders, implemented necessary flood control materials, and actively prepared for flood control.

(b) Formulate and implement safety flood control measures for water conservancy projects.

1, improve the safety management responsibility system and strengthen the administrative leadership responsibility system. The city's water conservancy projects sign safety responsibility letters step by step, clarify the safety management responsibilities of all responsible subjects, and implement the responsibilities. Some districts and counties have also published the names of the persons responsible for reservoir flood control and the inspection and management personnel of key small water conservancy projects in the media, clarified the responsibilities of the relevant personnel, and accepted supervision from all walks of life.

2. Carefully formulate and implement inspection, prevention and rectification measures. In March this year, the Municipal Flood Control Office issued the Notice on Carrying out Pre-flood Inspection in 20XX. Five flood control inspection teams led by the leaders of the Municipal Water Affairs Bureau went to seven districts and counties to carry out flood control safety inspection. The inspection teams inspected the flood control preparation, material reserve and river dredging in Jiangyang District. Flood control planning and restoration of water-damaged projects in Longmatan District: safety status of Mamiao Reservoir in Naxi District and restoration of water-damaged dikes; Flood control planning and dispatching plan of medium-sized reservoirs and hydropower stations in Lu Xian County; Reservoir dispatching and bridge dam safety in Hejiang county: the plan for rivers and streams where flash floods may occur in xuyong county: On-site inspection and guidance were conducted on the safety and material reserve of the reservoir under construction in Gulin County. The inspection team demanded that all districts and counties should strengthen flood control work, speed up the construction progress of reservoirs under construction, make emergency plans for flood control, further improve the defense plans for hidden dangers of mountain torrents, enhance the operability of measures and strengthen material reserves.

All districts and counties carried out a safety inspection of water conservancy projects before flood season, focusing on reservoir operation management and flood prevention preparation. In particular, they conducted a comprehensive inspection of the dangerous reservoirs being rectified, randomly checked the operation of Shanpingtang, registered the positions and degrees of various safety hazards, and put forward rectification opinions. The local government immediately organized the project management unit and beneficiaries to carry out rectification. If the hidden danger is too big to be handled for a while, the local government and the project management unit are required to make rectification within a time limit and report the rectification to the relevant departments. At the same time, the hidden dangers of reservoirs and important Shanpingtang, Shihe weir, water supply station, canal system and its buildings were investigated and registered, and the relevant responsible persons were implemented.

3. Revise and improve the reservoir flood control scheme and flood control emergency plan, so as to be prepared. The reservoir management unit has formulated the reservoir flood control scheme. According to the principle of hierarchical management, the flood control scheme of medium-sized reservoirs and medium-sized water conservancy projects under construction shall be examined and approved by the Municipal Water Affairs Bureau and reported to the Provincial Water Resources Department for the record. The flood control scheme of small reservoirs shall be examined and approved by the county water affairs bureau, and the flood control scheme of key small (1) dangerous reservoirs under construction and not rectified shall be reported to the Municipal Water Affairs Bureau for the record. The water affairs bureaus of all districts and counties, reservoir management units, and township governments (or water conservancy management stations) shall, according to the actual situation and the requirements of the Outline of Sichuan Flood Control Master Plan, revise and improve the emergency plan for reservoir flood control, and do a good job in monitoring the water situation, rain conditions and operation of reservoir hubs in flood season, especially closely monitoring the operation of reservoirs and ponds with serious security risks. The district and county water affairs bureaus urge the town where the project is located to further improve and implement flood control and rescue measures, rescue teams and materials in view of the possible dangers of the reservoir, and take corresponding measures to ensure the safety of the reservoir.

4. Organize rescue teams and strengthen material reserves.

Adhere to the city's water system? People-oriented, safety first, prevention first? While improving and perfecting the flood control headquarters and flood control team of water conservancy projects, this policy is based on? Flood control, grab big risks and save big disasters? Ideas, actively organize rescue teams, implement the' relief supplies reserve, and ensure the smooth communication equipment. Ensure that all kinds of dangers are eliminated in the bud and ensure the safety of water conservancy projects. According to incomplete statistics, there are 44,200 sacks/kloc-0, 390,000 woven bags, 40,000 square meters of woven cloth, 946 cubic meters of piles, 0.69,700 cubic meters of sand and gravel/kloc-0, 5.7 cubic meters of stones, 0.09 tons of lead wire/kloc-0, and rubber boats in our city. In response to sudden natural disasters in flood season, 3 17 temporary mobile rescue teams were set up at the city, district and county levels, with 1 1230 rescuers.

Second, the existing problems

Judging from the safety inspection organized by cities and counties, the main problems are:

(a) flood control monitoring and command information system has not yet been established. The construction of automatic forecasting and visual monitoring system for water level and rainfall of key dangerous reservoirs and flood control command and dispatch system is still in the planning stage. Some reservoirs have no communication equipment and emergency roads, which brings great inconvenience to engineering rescue, work situation, rain situation, water situation and dangerous situation transmission.

(2) The flood control task of dangerous reservoirs is heavy. At present, there are * * dangerous reservoirs 1 15 in the whole city, especially the medium-sized Aiqiaoqiao reservoir in Lu Xian County has been identified as a third-class dangerous reservoir, which has serious hidden dangers and endangers the lives and property of downstream personnel. The regulated reservoir is under intense construction and preparation before construction. 1 15 The safety of dangerous reservoirs has become the top priority of water conservancy work.

(3) Some grass-roots cadres have fluky psychology, lack awareness of flood control, and ignore the inspection of small water conservancy projects such as Shanpingtang, Shihe weir and canal system buildings (aqueducts, etc.). ) and township water supply stations.

(4) Some units, departments and villages and towns have insufficient preparations for flood control and emergency rescue materials.

(five) the management system of a few water conservancy projects is not implemented, and the weeds on the dam surface of a few dams (mainly earth-rock dams) are not removed, which affects the dam observation; There are also fish-blocking facilities on the spillway of some reservoirs, which affects flood discharge in flood season.

Third, the next step of work measures

(1) In view of the above hidden dangers, all counties, districts and relevant units are required to further strengthen leadership, raise awareness, resolutely overcome the idea of luck paralysis, attach great importance to the management of water conservancy projects and flood control safety, strengthen supervision and inspection, implement emergency plans for flood control of reservoirs and Shanpingtang, and do a good job in water regime monitoring. Rain conditions and the operation of the reservoir hub, especially closely monitor the operation of the reservoir that has just been rectified and failed the flood season test.

(2) Strengthen the safety and flood control management of projects under construction, strengthen the management of water conservancy vessels and water conservancy safety production, strengthen technical training, and improve the safety and flood control drills of water conservancy projects. Adhere to the safety monitoring system of water conservancy projects, adhere to the supervision system of flood control safety inspection, and adhere to the system of information collection, transmission and reporting.

(3) For dangerous and important reservoirs, the method of emptying or limiting the storage capacity is adopted to ensure the safety of the reservoir in flood season. At the same time, urge the township where the project is located to further improve and implement flood control measures, rescue teams and materials in view of possible dangers to ensure the safety of water conservancy projects.

(4) Strengthen engineering observation, inspection and maintenance. For the items with important security risks found in this inspection, it is necessary to strengthen inspection and observation, make records, and conduct follow-up investigation and handling. Implement management personnel and communication facilities, ensure smooth 24-hour communication of water conservancy project management personnel, ensure the safety of water conservancy projects in flood season, and realize water conservancy projects in the whole city? Standard flood does not break the dam, and over-standard flood does not die? Safety flood control objectives of water conservancy projects.

2065438+self-inspection report on flood control safety before the flood season in 2007 2 According to the document requirements issued by the Municipal Flood Control and Drought Relief Headquarters, in view of the actual flood control and fighting in our town, this week, our town convened relevant personnel such as the National Land Institute, resident cadres and village principals to carry out safety inspection and investigation in groups according to the document requirements, and made the following report on the recurrence of rivers, Shantang Reservoir, geological disasters and other areas in the town, and according to the work situation and the problems existing in the inspection and investigation:

I. Basic information

Anren Town is located in the subtropical monsoon climate zone, with warm and humid climate, four distinct seasons, and the annual variation of precipitation in the basin. The main rainy seasons in this area are plum season (April 16 to July 15) and typhoon season (July 16 to 10/5). Precipitation is relatively concentrated in April-September. There are two small reservoirs (Meicun Reservoir and Anfu Reservoir) with a storage capacity of 955,000 cubic meters, of which Meicun Reservoir has a storage capacity of 710.5 million cubic meters and Anfu Reservoir has a storage capacity of 240,000 cubic meters. There are mainly two streams in China, Anren Stream, with an area of 173.85 square kilometers and a total length of 33.35 kilometers. Anfuxi covers an area of 4 1.04 square kilometers and has a total length of 13.02 kilometers. It is mainly distributed in 9 villages, among which Anren market town is relatively concentrated, which is the key area for flood control inspection. Important water conservancy and flood control projects in the town are: Anrenxi Liu Fang and Xiangbian Dike. Enterprises and institutions that need to defend the market town are: Anren Town Middle School, Anrenxi Xidong Industrial Park and Anren Town Central Primary School. The hidden dangers of flood control are mainly in the low-lying land in the west of the forest, followed by the hidden dangers of geological disasters and the influence of flash floods, dangerous houses and the downstream of Shantang Reservoir.

Second, the flood control work before the flood season

(1) unify thoughts and raise awareness. In order to comprehensively and orderly carry out the flood control inspection and investigation work in our town, the town party committee and government held a special work meeting in time to comprehensively deploy and arrange the flood control inspection and investigation work in the town, and conduct key inspections and investigations on key areas and key projects, especially on geological disasters such as mountain ponds, reservoir areas, dangerous houses, rivers and debris flow-prone areas. And intensify inspections and investigations, make every effort to find potential safety hazards, formulate corresponding emergency plans and measures, and require all localities to further enhance people's awareness of flood control and disaster relief, improve the quality and level of disaster relief, and strive to minimize disaster losses in flood season and ensure the safety of people's lives and property.

(two) the organization in place, the responsibility to the people. In order to effectively carry out flood control inspection and search for potential safety hazards in flood season from various aspects, angles and levels, our town fully implements the chief executive responsibility system, timely adjusts the leading staff of the town flood control and drought relief headquarters, and is responsible for organizing, supervising, inspecting, directing and coordinating the flood control work in flood season. At the same time, the adjustment has enriched the flood control team and personnel in this town, implemented the emergency material reserve, and ensured the manpower, material resources and financial resources needed for flood control and drought relief work. The town flood control office is responsible for handling daily work, implementing a 24-hour duty system and reporting the progress of inspection and investigation to the town flood control department in a timely manner. All village committees should fully support and cooperate with flood control inspections and investigations, do a solid job in flood control inspections and investigations, and strive to ensure that there are no loopholes in inspections and investigations, and there are preparations, plans and measures when disasters occur.

(3) Update the plan and make careful arrangements. Timely implement and update the flood prevention and typhoon prevention plan. My town has formulated a two-level flood control and typhoon prevention plan for towns and villages, and revised and improved it in place before the main flood season every year according to the actual situation. A flood control exercise will be held every year to ensure the feasibility and effectiveness of the plan. After careful analysis and study, careful organization and careful deployment, a feasible implementation plan was formulated, and at the same time, it was widely publicized, creating a strong atmosphere of major inspection and rectification of potential safety hazards before the flood season. According to the geographical distribution of rivers, ditches and Shantang Reservoir in the town, inspections were conducted in different management areas, and four inspection investigation teams went to various areas to conduct on-site dangerous inspections. Inspectors went deep into key flood control areas, investigated hidden dangers such as water conservancy projects, rivers, ditches and landslides on the spot, determined rectification plans on the spot, worked on the spot, solved existing problems on the spot, determined effective remedial measures, and checked hidden dangers in the bud, effectively achieving the purpose of investigation and management of hidden dangers in flood control and flood fighting.