Keywords: concrete; Rapid construction; Programmes and technologies; Three Gorges Project
Abstract: The total concrete of the Three Gorges Project is 28 million m3, of which the dam concrete is about 20 million m3. Concrete construction is the key to whether the Three Gorges Dam project can progress according to the requirements of the overall plan and achieve the goal. According to the overall progress, the maximum production capacity will reach 5 million m3, the maximum daily production capacity will reach 400,000 m3, and the maximum production capacity in Japan will reach more than 20,000 m3. After comparative analysis of various construction methods, on the basis of full demonstration, it is decided to choose the comprehensive construction scheme of continuous pouring of belt conveyor for transmission tower, supplemented by sluice tower and cable crane. In the design process, the upper deck method and water level method are adopted, and the traditional technology is reformed, and the new machine technology of tower (roof) is adopted.
Keywords: concrete; Rapid construction; Procedures and techniques; Three Gorges Project