Check the monthly work plan 1
With the correct guidance and support of hospital leaders in 20xx, the laboratory of our hospital has developed rapidly. I firml
Check the monthly work plan 1
With the correct guidance and support of hospital leaders in 20xx, the laboratory of our hospital has developed rapidly. I firmly believe that with the full cooperation of all departments, the staff of our department will work together with Qixin to continuously improve the quality of medical care, ensure medical safety, improve the quality of general medical care, and complete various tasks of our department. The work plan of the clinical laboratory for 20xx years is as follows:
First, strengthen laboratory construction and improve internal management;
65438+
2, the system construction laboratory, establish and improve various standard systems, processes and measures, to test the "Quality Manual" and "Operating Procedures" to learn, clear the responsibilities of operators in each position, carry out regular assessment and check the implementation.
3. By improving the detail management within the department, enhancing the awareness of safety and care, and standardizing the operation process, every rule and regulation of the department can be implemented and implemented in every link of the department's work.
Second, strict quality control, improve the inspection accuracy:
1, the quality control goal of the clinical laboratory, continue to do a good job in the daily quality control of biochemical test items, improve the quality control of clinical routine items, and make records, analyze the reasons for out of control and take corrective measures.
2. Incorporate the quality control results before each inspection item into the quality assessment index of the department, improve the accuracy of the inspection, and minimize the laboratory error rate of the department.
Three, strengthen the management of instruments and equipment, improve work efficiency:
1, to do a good job in maintaining the existing experimental instruments, requires the staff of each department to study hard, master the operating skills of the instruments, and maintain the instruments in strict accordance with the requirements, so that they can seriously study various failures of the instruments and deal with them actively and timely, so as to ensure the normal operation of various instruments in this department, which not only saves maintenance costs but also ensures daily inspection work and improves work efficiency.
2. Introduce new equipment and strive to introduce automatic trace element analyzer by the end of 20xx.
Fourth, increase the workload and business income:
1, specimen quantity, it is planned to complete 30,000 person-times by the end of 20xx.
2. Operating income. It is planned to complete business income of 3 million by the end of 20xx.
Five, actively carry out new projects:
1, 20xx 1, 1, and strive to open a new 15 project on the basis of existing projects.
Six, personnel training and business learning:
1. Clinical laboratory business learning is standardized and institutionalized, and it is planned to hold various forms of business learning twice a year.
2. Do a good job in training imported talents.
3. The main technical backbones who strive for inspection throughout the year have an opportunity to study in a large hospital in the Mainland.
Finally, all the staff of the clinical laboratory are willing to make their own efforts and contributions to the development of the maternal and child health hospital, so that the clinical laboratory can go to work on the next level.
Inspection monthly work plan 2
First, improve service quality and strengthen clinical communication.
1, coordinate with the medical department, organize a joint meeting between the clinical department and the clinical department, and * * * negotiate to solve the problems in their work.
2, solicit opinions and suggestions from relevant departments on the clinical laboratory, in order to improve the work of the clinical laboratory.
3. Hold regular briefings on various inspection items in the clinical laboratory, publicize the significance of the projects carried out by the clinical laboratory, and closely integrate the inspection items carried out by the clinical laboratory with clinical diagnosis and treatment.
Second, strengthen communication with hospital leaders and win the support of all parties.
1, strive for the understanding and support of hospital leaders, and introduce 2-3 professionals to make up for the shortage of department personnel. Realize rational division of labor and scientific development.
2. If conditions permit, try to buy:
Chemiluminescence immunoassay analyzer 1 set (about 90,000 yuan) can improve the accuracy of existing detection items, increase experimental detection items, and provide more and more diagnostic detection items for clinic.
Automatic bacterial identification instrument 1 set (about 300,000 yuan) can improve the accuracy and timeliness of bacterial identification, and advance the work of bacterial identification from the current 3 days to 8- 12 hours.
1 digital microscope (about 20-30 thousand yuan) can improve the objectivity and accuracy of morphological experimental diagnosis.
3. Strive to send 1 personnel to higher-level hospitals for further study every year.
Third, promote the harmony between doctors and patients and improve the management level of departments.
1, improve the detail management within the department, and formulate every rule and system of the department.
The degree can be implemented and runs through every link of the department's work.
2. Optimize the process of outpatient report, so that patients can spend the least time, run the least distance and get the most timely inspection report.
3, the implementation of window smile service, let patients feel warm from the spirit, reduce psychological pressure.
20xx is a brand-new year that connects the past and the future. With the pilot reform of public hospitals, all inspectors are willing to make their own efforts and contributions to the pilot reform of hospitals. Let the laboratory work take advantage of the new medical reform, by going up one flight of stairs!
Clinical laboratory work plan II
Under the guidance of "the party's mass line education practice activities" and the spirit of the Fourth Plenary Session of the 18th CPC Central Committee, we should govern the country according to law, run hospitals according to regulations, and set up departments according to regulations. In 20xx, all departments made great efforts to strengthen laboratory quality management and safety management, strengthen internal management, improve inspection quality, and strive to provide people with safe, accurate, timely, effective, economical and convenient health services.
First, working ideas.
1. Start a new round of "three-level" re-evaluation, further implement the Measures for the Management of Clinical Laboratories in Medical Institutions, strengthen system construction and internal detail management, strengthen system implementation, inspection, assessment, supervision and punishment, further optimize service processes, standardize service behaviors, and promote the process of institutionalized, standardized and scientific laboratory management.
2. Further strengthen the contact and communication with the clinic, hold regular "contact meetings of clinical departments for inspection", distribute inspection and clinical materials on a regular basis, and introduce new projects, new technologies and knowledge of quality control before inspection.
At the same time, widely listen to clinical opinions and suggestions, and establish a long-term mechanism of laboratory and clinical contact.
3. Strengthen the management of laboratory biological safety and enhance the awareness of safety worries; Strengthen the construction of professional ethics and departmental culture, and establish a United, enterprising and pragmatic team.
Second, the workload and economic goals
65,438+0. Total inspection times: 15- 20% more than 20xx;
2. Total income: increased by15-20% compared with 20xx;
3. Net profit: 20-25% higher than 20xx;
4. Per capita net balance: 5% higher than 20xx.
Third, the new work plan
According to the professional development, the department plans to carry out new projects: detection of autoimmune liver disease (indirect immunofluorescence or western blot), chromosome fish detection, culture and identification of fungi, G test of Mycobacterium tuberculosis, culture and drug sensitivity test, and detection of Clostridium difficile. According to the conditions, some molecular biotechnology will be developed for individualized treatment and prognosis monitoring of tumor patients, detecting some drug-resistant genes, detecting genes related to tumor heredity, and predicting the risk rate of this tumor.
Fourth, discipline construction and personnel training.
1. Strive for the successful application of scientific research project of Health Department 1-2 in 20xx; Complete 2-3 municipal scientific research projects and strive for the appraisal of application results.
2. Cooperate with the teaching and scientific research work of clinical medicine, actively carry out new inspection items (5 items) and complete some technical innovations (2 items), cooperate with the scientific research work of clinical departments as much as possible when conditions permit, and entrust some inspection items that are urgently needed in clinic but temporarily unable to be carried out by departments for various reasons to fully meet clinical requirements.
3. The Ministry of Planning has published more than 20 papers, including statistical sources and core journals 10, and strived to publish sci papers.
Submit 20-40 papers to academic conferences above the municipal level.
4. Hold the municipal academic conference on quality control and the municipal academic conference on clinical testing 1 time, and strive to host the national or provincial academic conference 1 time, and plan to send participants to participate in international academic conferences 1 time and domestic academic conferences, short-term training and study tours for 50 times. Send it to a higher hospital for further study (blood and bacteria) for 2 times, and short-term training for 2-4 times.
5. It is planned to introduce 1 doctoral students, 3 master students, and recruit 7 internship students.
6. Improve the teacher training system, improve teachers' quality and technical level; Strengthen the teaching management of training, internship and further study students, care for students from many aspects such as thought, life and study, give theoretical lectures twice a month, and strictly implement the assessment; Strengthen business study, "three basics" training and assessment, organize business study 1-2 times a month in the department, and give young doctors, technicians and supervision students a two-month 1 closed exam, and reward and punish them.
Verb (abbreviation of verb) laboratory management
1. Strengthen the laboratory management according to the "standard of 3A hospitals". Conscientiously implement the "Measures for the Administration of Clinical Laboratories in Medical Institutions", "Regulations on the Biosafety Management of Pathogenic Microbiological Laboratories" and other laws, regulations and norms, and strive to improve the establishment of iso quality system; Implement the new version of "Hospital Work System and Responsibilities" of the Ministry of Health, and improve various systems, responsibilities, standards and norms.
2. Do a good job in indoor quality control, ensure that it is completed on time and with good quality, and continuously improve the inspection quality. Actively participate in the inter-room quality evaluation activities of the Ministry and the provincial level and the comparison activities carried out by the Sichuan Clinical Laboratory Center. The province's inter-room quality evaluation results remain excellent, and the Ministry of Health's inter-room quality evaluation results remain excellent or good.
3. Continue to declare key specialties and improve the construction of departments. Attach importance to the introduction and training of outstanding talents, strengthen continuing medical education and professional skills training, and create a good learning atmosphere.
4. Improve the inspection items of Hedong Branch, improve the inspection ability, and ensure the convenience and timeliness of patient inspection. Strive to install self-service printers for inspection reports in the lobby of Hedong Branch, the outpatient hall of the headquarters and the medical guide desks on all outpatient floors, so as to facilitate patients to print inspection reports conveniently and quickly. Efforts should be made to coordinate and improve the collection and inspection process of off-duty patients' test specimens, so as to reduce the prolonged diagnosis and treatment time and patient dissatisfaction caused by patients being unfamiliar with the hospital layout and looking for the test room everywhere (I hope to collect samples near the diagnosis room and print the report, and then the hospital nurse will send the samples to the laboratory). Further optimize the interface between lis and his system, facilitate the extraction and reference of patient information, and improve the consistency between test results and clinic; Improve and improve the forecast system, accurately remind patients to wait in line, and report the time and place of collection.
Check the monthly work plan Part 3
Infection control system and measures
First, the layout is reasonable, the working area is separated from the living area, and a special cleaning and disinfection room is set up with obvious signs; Each work area is equipped with running water, non-contact hand washing equipment and hand disinfection products, and hands are cleaned and disinfected in time after operation.
Two, pathogenic microorganism laboratory, molecular biology laboratory should be equipped with biosafety cabinets, autoclaving equipment; Smear or plate inoculation of patients' sputum and other original specimens should be carried out in the biosafety cabinet, and the position of the biosafety cabinet meets the requirements. Set the access switch, and there is a sign of biological hazard at the entrance to restrict the entry of people who have nothing to do with the experiment.
Three, sterile room and clean bench must be kept clean, cleaning and disinfection twice a day. The sterile room should be equipped with air disinfection equipment, and the effective intensity of ultra-clean ultraviolet disinfection lamp should be monitored every 3-6 months/kloc-0 times, and recorded as required.
Four, the staff must wear work clothes, hats, isolation gown, rubber shoes, masks and gloves when necessary, and strictly implement the laboratory operation procedures. Keep the room clean and hygienic, clean the air, surfaces and floors of various objects every day, and clean them in a wet way. If there is pollution, immediately disinfect and clean, and avoid pollution when conducting various tests; After the inspection of special infectious diseases, it should be disinfected in time. If it is found that the site, work clothes or body surface are polluted, it should be dealt with immediately to prevent the spread, and report to the superior according to the pollution situation.
Five, must use the disposable inspection supplies with the qualifications stipulated by the state, and use them within the validity period, and shall not be reused; When storing disposable inspection articles, the outer packaging must be removed, and then the sterile articles must be moved to the storage cabinet. After use, it shall be treated harmlessly in accordance with the Regulations on the Management of Medical Wastes. Sterile articles such as cotton swabs, cotton balls and gauze and their containers should be used within the validity period, and the use time should not exceed 24 hours after opening. Discarded articles after use must be treated as medical wastes and shall not be discarded at will.
Six, the use of disinfectants to maintain effective concentration, according to its performance, regular monitoring (such as daily monitoring of chlorine-containing disinfectants); Regularly monitor the disinfection and sterilization effect.
Seven, all kinds of instruments should be disinfected and cleaned in time; All kinds of discarded specimens should be disposed of according to regulations (incineration, human sewage pool, disinfection or sterilization).
Eight, strict implementation of aseptic technology operating procedures, venous blood collection must be one person, one needle, one tube, one towel area; Micro-blood collection requires one person, one needle, one tube and one piece (glass slide); The report was printed by a microcomputer.
Nine, sterile items and non-sterile items are stored separately, and the packaging of sterile items is affixed with an indication tape, indicating the sterilization date, expiration date, operator's name and aseptic packaging name.
Ten, abandoned pathogen culture medium, bacteria, virus preservation solution, etc. , must be disinfected on the spot, sealed and transported according to the relevant provisions of medical waste management, and disposed of harmlessly.
Check the monthly work plan Part 4
The busy and full 20xx is about to leave, and the expectant 20xx is coming soon. All laboratory workers in our hospital will continue to keep in mind the hospital training, focus on the hospital's work objectives, take the hospital's grade re-evaluation as the starting point, and rely on the key discipline platform of our hospital to strive to achieve the rapid development of laboratory discipline and the leap-forward development of two benefits, and boost the core competitiveness of our hospital.
First, take the hospital grade evaluation as an opportunity to promote the full coverage of quality control.
Since joining the regional quality control system in xx from 65438 to 0998, I have participated in the quality control network quality control work covering inspection, blood transfusion, sexually transmitted diseases, AIDS and other lines, involving different levels of districts, cities and ministries. The quality control system has been initially established, and some experience has been accumulated in laboratory quality control, and satisfactory results have been achieved. However, due to many factors affecting the test results, especially the quality control before analysis has become the focus of the inspection industry, especially the inspection quality control center. We intend to promote the implementation of pre-analysis quality control measures with the help of review requirements and on the basis of full communication with relevant departments.
Second, relying on the platform of key disciplines of the college, vigorously promote the development of disciplines and achieve practical results.
1. Pay attention to the training of clinical talents and promote the development of all kinds of talents.
After years of efforts, especially in recent years, with the care of leaders and the efforts of comrades, the clinical laboratory has trained a talent team and established two platforms. Facing the pressure of the external environment of our hospital and the demand of the hospital's own development, high-level talents have become the focus of competition. Through the introduction and training, X comrades in the laboratory completed the postgraduate courses, among which X obtained the master's degree in medicine. Together with X competent technicians, the laboratory formed a "6+ 1" team led by X associate high school (dual masters), X supervisor and 3 masters.
It is planned to send X people abroad for further study in 20xx, and many people will go out for short-term training to ensure that the inspection technology and ability of our hospital keep pace with the times.
2, relying on the platform of women and children's learning group, vigorously introduce new technologies and new projects.
In 20xx, Comrade X of the department had the honor to join the study group of women and children in the laboratory of xx Medical Association, and was selected as a correspondent, becoming a member of the core group of the study group, and gained many opportunities to communicate with experts from three major women and children hospitals and three major pediatric hospitals in xx. We will make full use of this resource and bring great-leap-forward development opportunities for the construction of new laboratory projects in our hospital.
3. Accelerate the construction of pcr laboratories and develop key disciplines in hospitals.
With the support of the hospital, the laboratory has the honor to become the key subject of the hospital. With the joint efforts of everyone, we have established a talent team. With the development of the hospital, there are a certain number of pcr items (hbv dna) in our hospital, as well as the clinical demand for hpv and Streptococcus agalactiae detection. It has become our priority to establish a molecular biology laboratory in our hospital. With the development of medicine, nucleic acid detection not only becomes the gold standard of clinical diagnosis, but also represents the development direction of laboratory medicine. The establishment of molecular biology laboratory not only supplements one of the most important branches of laboratory science in our hospital, but also provides strong support for clinical diagnosis and scientific research in our hospital.
Third, actively meet the medical reform and promote management science.
In 20xx, the intensity of medical reform may be even greater, as a grass-roots department. We believe that we should not only implement clear requirements, but also understand their spirit and promote scientific management. In 20xx, we will add laboratory professional evaluation indicators on the basis of the indicators required by hospitals for clinical laboratories, and analyze and discuss the indicators to promote the refinement of laboratory management.
In short, in 20xx, the laboratory will take the opportunity of establishing a molecular biology laboratory and strive to realize the leap-forward development of disciplines, benefits and services.
The fifth chapter check the monthly work plan
I. Purpose
According to the company's quality policy and quality objectives, formulate and organize the implementation of the department's quality management plan and objectives, and organize subordinates to improve and maintain the standardization system, as well as product standard management and product quality accident handling; Organize subordinates to inspect and test raw and auxiliary materials, finished products and production processes, ensure the fairness, accuracy and timeliness of inspection results, control inspection costs, and improve work efficiency and service quality to meet the needs of businesses and customers of various departments of the company.
Second, the organizational structure
Due to the gradual expansion of the company's scale, there are more and more products and business volume, and the focus of work will change accordingly. In order to meet the current production needs, the temporary organizational structure is shown in the following figure 1, and inspectors need to be added later.
It is hoped that the quality of the inspectors will be higher, and the existing quality inspector retraining can only prevent the shipment of defective products, but not.
The organization will make plans later, and the quality department also needs to establish supplier quality management and delivery inspection. Therefore, quality management needs to be systematized and standardized more and more.
Third, personnel planning.
The planned number of people is 5:
The number of incoming inspectors of 1 and iqc has increased from the current 2 to 5. And set up a special iqc incoming inspection team.
2. The target of 2.iqc's bad batch number of incoming materials is 94%. In order to achieve this goal, a professional sqm engineer is needed to guide the supplier management, who also serves as the iqc team leader.
3. In order to strengthen the data analysis and improvement ability of the quality department and improve the company's iso procedures, it is necessary to add a quality clerk who will also serve as a document controller.
4. The quality supervisor is directly responsible for reducing potential quality hazards in product development, improving process quality control ability, reducing customer complaints, and handling anomalies in the outsourcing production process.
5. Each foreign factory needs to be equipped with 1 skilled foreign supervisor and 2 quality inspectors to achieve the purpose of monitoring the quality of foreign factories.
Fourth, regional planning.
With the continuous growth of the company, the company's quality management system is becoming more and more perfect, and there are more and more people in the quality department. The existing work area of the quality department can no longer meet the needs of constant change and development, so the quality department needs a relatively independent work area that can accommodate enough people.
Verb (abbreviation for verb) department responsibility
In order to implement the quality management system, promote the company's product quality management and quality improvement activities, ensure to provide customers with satisfactory products and quality services, and realize the company's interests, the following duties are tentatively set:
1. Implement the company's quality policy, constantly improve the company's quality assurance system documents, and ensure that the iso900 1:20xx: 20xx quality management system can run continuously and be effectively implemented.
2. According to the company's quality objectives, supervise all departments to establish relevant quality objectives, be responsible for evaluating the quality management of all departments, and organize review and planning according to the actual performance and orders.
3. Be responsible for the formulation and implementation of various quality management systems of the company, and organize and promote various quality improvement activities.
4. Establish a quality management responsibility system, implement it in all relevant departments (people), establish and improve the quality assessment system, strictly control each working procedure, and ensure that everyone is responsible, everything is based on evidence, the operation is standard, and there is supervision at all levels.
5. Formulate departmental assessment system and organize the implementation of performance management; And provide statistical data of various quality problems, and cooperate with the administrative department to supervise the performance appraisal process of various departments.
6. Cooperate with the Ministry of Commerce to handle customer complaints, analyze abnormal reasons, implement and verify improvement measures, reduce internal and external customer complaints, and continuously improve customer satisfaction.
7. Be responsible for compiling annual, quarterly and monthly product quality statistical reports, establishing and standardizing original inspection records, statistical reports and quality statistical audit procedures, making statistics, analysis and evaluation on product quality indicators, and proposing measures to improve product quality.
8, responsible for regular quality work report. Regularly make oral or written reports at production meetings, organize special analysis meetings of major quality accidents, and report special emergencies to superiors.
9. Be responsible for the investigation and handling of the company's quality accidents according to the regulations on handling quality accidents.
10, responsible for the management of relevant documents, records and information to ensure the traceability of the product realization process.
1 1. Coordinate and manage related work with other departments.
12, complete the tasks assigned by the superior temporarily.
Check the monthly work plan 6
In order to improve the work efficiency of the Quality Inspection Department, clarify the direction and focus of the 20xx quality inspection work of the Quality Inspection Department, improve the overall quality and business level of the employees of the Quality Inspection Department, and clarify the specific responsibilities and work objectives of each employee in the department, the annual work plan of the Quality Inspection Department is formulated, and the contents are as follows:
Quality inspector of machining:10-February, the first inspection qualified rate is 65438+95%, and 3-65438+98% in February. The annual complaint rate is less than 2%.
Welding quality inspector: the pass rate of the first inspection in the whole year is 95%, and the complaint rate of placing orders in the whole year is less than 5%.
External quality inspector: the qualified rate of the first inspection is 98%, and the complaint rate of placing orders is less than 2%.
Quality inspection of assembly process: the first inspection qualified rate is 100%, and the annual customer complaint rate is 1-3% in April and 2%-65438+February in May.
Annual goal of the overall work of the Quality Inspection Department: the comprehensive inspection pass rate is 97%, and the total appeal rate for the next series is less than 3%; The communication complaints of departments are zero throughout the year, and the customer complaint rate is less than 2% throughout the year.
In order to ensure the realization of the annual work plan of the quality inspection department in 20xx, the following work plan is formulated in combination with the work situation of the quality inspection department in 20xx to ensure the realization of the work objectives of the quality inspection department in 20xx.
Work plan of quality inspector 3
In order to make our company's products flow to the market for a long time and get unanimous praise from the broad masses of the people, as a company quality inspector, I hereby make the following work plan for my future competence:
1, sampling inspection of products during production, implementation and maintenance of inspection status identification, responsible for quality, appearance and packaging inspection of products produced by the company, filling in inspection records and filing.
2, supervise the normal production of production personnel, self-inspection, mutual inspection, first inspection and keep every
A record of the days.
3. Strengthen technical implementation and quality inspection in the production process. Do a good job in process control.
4. Familiar with product quality inspection procedures, inspection methods and inspection standards.
5. Assist all departments to deal with various problems in the production process.
6, a strong sense of responsibility, serious work, can withstand greater work pressure. Responsible for product quality status identification and strictly control unqualified delivery;
7. Other work arranged by the leaders.
8. Understand the basic inspection procedures. Responsible for the quality, appearance and packaging inspection of products produced by the company, able to record daily work, make weekly statistics, summarize and report directly to the person in charge;
Quality is the eternal topic of enterprises, and it is the foundation and guarantee of enterprise development. Over the past year, the company has always adhered to the policy of "quality first, prevention first", paid close attention to quality work while paying attention to economic benefits, and carried out effective quality inspection management. Quality inspection objectives are clear, responsibilities are in place, quality problems will never be shirked, and accidents caused by violations of systems and operating procedures will never be soft and will not be tolerated. The quality inspector will check the packaged products at any time, solve the problems in time, and make emergency and treatment plans.
Quality awareness should be implemented in the whole production process, focusing on correcting habitual illegal operations, and further enhancing the quality awareness and self-protection awareness of employees. In the work, we should strictly abide by the operating rules, constantly improve the supervision and restraint mechanism of quality inspection, implement the quality responsibility system, increase the intensity of quality inspection, and always put the idea of "quality first" throughout the whole production process.
The quality production education of employees is basically in place, and the publicity of quality education has been strengthened. Through the company's unified organization of learning and daily education in the workshop department, it sounded the alarm, constantly raised awareness of prevention, and organized relevant personnel to study and educate.
Strengthen the construction of corporate culture. Corporate culture is an idea that is constantly formed in the process of production, management, development and growth. It is the common values and common code of conduct of employees. In the conventional workshop order, the quality inspection class not only completed the quality inspection work, but also strengthened the supervision of employees' production discipline and real-time monitoring of the workshop site, which improved all kinds of violations of discipline and discipline;
As the production quality supervision and management department of the whole plant, the quality control department conducts quality inspection in the work and strives to fulfill the quality control, supervision and management functions of the whole plant. While continuing to grasp the quality inspection standards, we should also strengthen supervision over the quality problems of the whole factory.
A successful enterprise has made brilliant achievements, the quality must be favored by the world, and the quality supervisors must be satisfied.
Do your duty, act in strict accordance with laws and regulations, do not have any selfish interests, and never relax on unqualified products. The sacred and selfless profession of quality inspector is related to the long-term sustainable development of this company and the rise and fall of an enterprise. I will do quality inspection at all costs. I am proud of the great and selfless profession of quality inspector.
Check the work plan in the seventh month
In order to meet the evaluation of the second-class first-class hospital in our hospital, our department actively responded to the notice and requirements of the hospital, conducted serious training and learning for medical staff, summarized and improved in time, and saved some problems in the work.
Problems and measures
I. Existing problems
1. Taking samples of acid-fast bacilli after using uncovered urinals has caused serious harm to the health of patients and medical staff at the grass-roots level.
2. Some colleagues wash their hands for too short a time to achieve the purpose of hand hygiene.
3. The back cover of Anerdian is not tight.
Second, rectification
1. Keep the sample of acid-fast bacilli in a covered container cup.
2. Strengthen hand hygiene training and raise awareness.
3. The lid of Anecdian must be tightened after use. Quarterly summary of infection management in clinical laboratory
In the second quarter of xx.
After three months of continuous improvement, our work has achieved good results, but there are also some shortcomings.
I. Existing problems
1. Some people who should be tested by the occupational exposure laboratory in this project answered incompletely.
2. The accused part of multidrug resistance has no hospitalization number, and the original laboratory sheet is not filled out by the clinician.
3, sewage disinfection concentration is seriously not up to standard.
Second, the rectification measures
1, strengthen the training of the items that should be tested in the occupational exposure laboratory of department personnel.
2, carefully read the instructions for the use of disinfection effervescent tablets.
3. Strengthen communication with clinicians and fill in the patient information of the original laboratory sheet. Quarterly summary of infection management in clinical laboratory
The third quarter of xx.
In order to successfully pass the establishment of a second-class first-class hospital, our department actively responded to the notice and requirements of the hospital control office, further strengthened the training and study of medical staff, and timely summarized and improved, but some work needs to be strengthened.
I. Existing problems
1, too many needles are put into the sharp box after use, which has exceeded 3/4, seriously endangering medical staff.
2. When the biosafety cabinet is in use, the sliding door is too high, which is harmful to the health of medical staff.
Second, rectification
1. When the sharps box leaks 3/4, the sharps box must be replaced.
2. Use the biosafety cabinet correctly and safely.
Summary of sensory control work in clinical laboratory in the first half of the year
This year our hospital is striving for a second-class first-class hospital. With the attention, care and guidance of hospital leaders, the nosocomial infection rate in our hospital has remained at a low level. In order to further improve the internal control of the hospital, the infection control work in our department is summarized as follows.
First, strengthen organizational leadership, ensure the smooth development of infection control in our hospital, do a good job in daily work, conduct inspection, training and assessment on infection control in our department from time to time, give feedback on existing problems and make continuous improvement.
Second, strengthen the management of medical waste.
Strengthen the management of bacteria and green plants in the microbiology room. After use, the culture medium strains and specimens must be sterilized and treated as hospital waste.
Multi-drug-resistant bacteria were detected, and they were not reported and notified to relevant departments and departments in time according to the hospital's multi-drug-resistant bacteria treatment system.
Third, do not regularly check the medical staff's hand hygiene compliance, disinfectant concentration and ultraviolet lamp use registration records.
Four, micro health care room to strengthen the monitoring of air culture and disinfectant culture, do a good job in the quality control.
My professional title as an engineer is divided into junior, intermediate and advanced. Can you ask the company to evaluate these? Wha