What are the technical and economic effects of flowing water construction?
Hello:

Personally, I have a little humble opinion:

The economic effect of flowing water construction is reflected in the following aspects:

(1) The construction period is short, and the investment benefit can be brought into play as soon as possible. Because of the rhythm and continuity of flowing water construction, the construction progress of various professional teams can be accelerated and the time interval can be reduced. In particular, adjacent professional teams should overlap as much as possible in the starting time, make full use of the working face and start work as soon as possible, thus shortening the construction period, making the project put into use or put into production as soon as possible, and achieving economic and social benefits as soon as possible.

(2) Realizing specialized production can improve the level of construction technology and labor productivity. Due to the establishment of a reasonable labor organization under the flow construction mode, each team has realized specialized production, and the workers have been working continuously and skillfully, which is convenient for continuous improvement of operation methods and construction machines and tools, and can continuously improve the construction technical level and labor productivity.

(3) Continuous construction can give full play to the production efficiency of construction machinery and labor. Due to the reasonable organization of flow construction, workers can work continuously, and the idle time of machinery is less, which increases the effective labor time, thus giving full play to the production efficiency of construction machinery and labor force.

(4) Improving the quality of the project can increase the service life of the construction project and save the maintenance cost in the process of use. Because assembly line construction has realized specialized production, the workers' technical level is high; Moreover, the professional teams closely overlap and supervise each other, which can improve the quality of the project and prolong the service life of the construction project. At the same time ... Hello:

Personally, I have a little humble opinion:

The economic effect of flowing water construction is reflected in the following aspects:

(1) The construction period is short, and the investment benefit can be brought into play as soon as possible. Because of the rhythm and continuity of flowing water construction, the construction progress of various professional teams can be accelerated and the time interval can be reduced. In particular, adjacent professional teams should overlap as much as possible in the starting time, make full use of the working face and start work as soon as possible, thus shortening the construction period, making the project put into use or put into production as soon as possible, and achieving economic and social benefits as soon as possible.

(2) Realizing specialized production can improve the level of construction technology and labor productivity. Due to the establishment of a reasonable labor organization under the flow construction mode, each team has realized specialized production, and workers have been working continuously and skillfully, which is convenient for continuous improvement of operation methods and construction machines and tools, and can continuously improve the construction technical level and labor productivity.

(3) Continuous construction can give full play to the production efficiency of construction machinery and labor. Due to the reasonable organization of flow construction, workers can work continuously, and the idle time of machinery is less, which increases the effective labor time, thus giving full play to the production efficiency of construction machinery and labor force.

(4) Improving the quality of the project can increase the service life of the construction project and save the maintenance cost in the process of use. Because assembly line construction has realized specialized production, the workers' technical level is high; Moreover, the professional teams closely overlap and supervise each other, which can improve the quality of the project, thus prolonging the service life of the construction project and reducing the maintenance cost during the use of the construction project.

(5) Reducing the project cost can improve the economic benefits of the contractor. Because of the balanced consumption of flow construction resources, it is convenient to organize the supply of resources, so that the stored resources can be reasonably and fully utilized, which can reduce all kinds of unnecessary losses and save material costs; Due to the high production efficiency of flowing water construction, labor costs and machinery use fees can be saved; Because the flow construction reduces the number of people in the peak period of construction, and the supply of materials and equipment is reasonable, the cost of temporary facilities can be reduced; Due to the short construction period of flowing water, the management fee of enterprises can be reduced. The reduction of project cost can improve the economic benefits of contractors.

Thank you for your adoption!