Summary of engineer title evaluation
Engineer's work summary

My position is the chief engineer of Changping subway project. According to the division of labor, my main work is project technology, experiment, science and technology, quality management and participation in project construction management. Over the past year, under the correct leadership of the Party and the government in the project department, with the support and help of the leaders and comrades, I have been able to perform my duties conscientiously, be loyal to my duties and work pragmatically, and have made remarkable achievements in implementing the famous brand strategy, strengthening the technical management capacity building, scientific and technological work and gold project construction, and successfully completed various tasks assigned by the Party and the government in the project department. The work in the past year is briefly described as follows, please review it.

First, strengthen learning and improve the level of policy theory.

In this paper, the central group of the Party Committee of the project uses spare time to concentrate on study and self-study, systematically study the report of the 17th National Congress and the spirit of the Fifth Plenary Session of the 17th Central Committee, and write some experiences. Over the past year, in combination with the "striving for excellence" activity carried out by the Party Committee of the Company, taking the spirit of the Party Committee as a weapon and "striving for excellence" as the goal, we actively participated in striving for excellence and promoted scientific development, forming a good atmosphere of party member taking the lead, full participation and continuous promotion, and driving all construction departments and teams of the Project Department to devote themselves to the "striving for excellence" activity, ensuring the construction period, strengthening construction and promoting. In the work, the center of gravity moves down, the leader moves down, the details move down, and ideological problems, problems and details are solved.

Put the cause first, work hard, strengthen study, and contribute to the development of the enterprise. I talked with the leaders of the project department and the construction team successively, talking about responsibility, handing in tasks and pressing the burden, achieving cohesion, carefully formulating the working idea of the 150-day battle, clarifying the reward and punishment measures, and refining the construction tasks and time limit; Formulate and strengthen the management of publicity information report to reflect the progress of the project in a timely manner; Strengthen dispatch and command, and give full play to the overall advantages; Storm key points to ensure the completion of the task; Take a multi-pronged approach, work together, strive to tap the internal potential and enrich the construction strength; Optimize the construction of key projects, formulate the best construction plan and other specific countermeasures. At the same time, it is reiterated that we should strengthen labor discipline and strictly implement the leave system. During the war, no vacation is allowed without special circumstances. Leaders, departments and employees should go deep into the construction site and command from the front. In wartime, we should correctly handle the relationship between safety and progress, safety and quality, cost and benefit, resolutely implement the responsibility system for safety and quality leadership, consolidate the foundation of safety and quality, carry out rectification of potential safety hazards, and do a good job in safety and quality work on the construction site.

Effectively change the style of work, work hard, establish a sense of responsibility, urgency and crisis, enhance the sense of service, take the guiding ideology of "three highs" as the direction, take Excellence as the driving force, give play to the leading role of party member Five Good, and strictly follow the overall working ideas of the project department to do a good job in safety, quality, image progress, civilized construction and site management in all directions. In urgent, difficult, dangerous and heavy engineering construction, improve the organization and coordination ability of the team and effectively solve the problems on the construction site; Strengthen management in quality and safety management, civilized construction of environmental and water conservation, tests, indoor materials, etc., take the lead, face up to difficulties, stand on the post, strive for Excellence, strive to be a pioneer, and strive to overcome the key points and difficulties in construction production with the goal of ensuring time limit, safety, quality, fine products and reputation, so as to ensure excellent engineering quality, no accidents in safe production, no delay in contract period, high quality and high efficiency. Strive to be a "Four Excellent" party member with excellent political quality, excellent post skills, excellent work performance and excellent evaluation by the masses.

Second, 20 10 years of due diligence, hard work, and constantly enhance their own execution.

Over the past year, I have paid attention to the overall situation, made overall plans, made reasonable arrangements, actively coordinated the relations between all levels and departments, been a good staff assistant to the principal responsible comrades, and promoted the orderly development of all the work in charge.

1. Strengthen cultivation, strive for quality projects and make a historic breakthrough. According to the arrangement of the project party and government, I will work with the Safety and Quality Department to create excellent projects. Comrades from the Safety and Quality Department and I carefully analyzed the situation of our project department, determined the key points of striving for excellence, relied on assistance and positive cultivation, established the technical innovation system of the project, improved the quality assurance system and improved the application materials. In order to strive for the high-quality project of Beijing Great Wall Cup, I went to the Rail Company and the Construction Committee several times with the heads of relevant departments to publicize and promote the high-quality project of our project department to the leaders of Beijing Construction Industry Association. At the same time, the leaders of the Association were invited to our project for investigation and guidance, and visited the construction site for many times, which further deepened the superior leaders' intuitive understanding of the project and paved the way for the project to declare high-quality projects. After scientific cultivation and active struggle, Chengnan Station won the title of "Beijing Structural Great Wall Cup Quality Project" and ranked 1 in the whole line, which was praised and rewarded by leaders at all levels.

2. Strengthen infrastructure construction, and the promotion of subway safety risk monitoring system has achieved gratifying results. First, the construction of emergency headquarters was completed. According to the arrangement of the party and government of the project department, the investment is nearly 2 million yuan, and a scientific and reasonable emergency command safety risk monitoring system with high definition of video images is built, which integrates video alarm, emergency command and video supervision demonstration, and realizes the docking of video monitoring with the emergency command center of the rail company, which has been affirmed by leaders at all levels. The second is to actively provide technical support for the mountain safety risk supervision information system and build a technical platform. Organize training on the maintenance and use of the software system for the relevant regional directors of the project department, so that the regional directors of the project department can master the use skillfully. The third is to complete the construction of video surveillance system with high quality. In order to speed up the construction of our department's video surveillance system, we have coordinated and communicated with the video system suppliers for many times, and went to the project department for on-the-spot investigation with the technicians of the video system suppliers to understand the current situation of the existing surveillance system. Combined with the actual situation of this department, the appropriate network access scheme is formulated, and the work arrangement and task division are defined. Fourth, strengthen monitoring and measurement management, upload monitoring data in time, and handle alarm points in time.

3. Strengthen scientific and technological innovation, and build the capacity of scientific and technological innovation to a new level. First, innovate the work concept and promote the performance-oriented operation of technical departments and laboratories. In order to further expand the business scope of technical departments and laboratories and better meet the needs of the project, the application of technical performance knowledge to the development of technical departments and laboratories was formally put forward for the first time, which injected the concept of technical performance into technical departments and laboratories and played a role in attracting jade. Taking this as an opportunity, the laboratory has increased its cooperation with outsourcing testing units, and made major breakthroughs in business volume and business performance. Second, actively strive for financial support to improve the ability level of the technical department and laboratory of our project department. Third, actively build a scientific research platform and encourage independent innovation. With everyone's efforts, we organized and compiled a lot of technical summaries, which were recognized and praised by leaders in the technical exchanges of brother units.

4. Strengthen the organization, carefully prepare and successfully complete the acceptance work. Carefully clean up all the completion acceptance data to ensure that the completion acceptance data is put into storage on time. On February 5, 20 10, the main structure of Chengnan Station passed the pre-acceptance, on August 3, 20 10, it passed the mutual inspection of the engineering and technical risk prevention work of the rail company, and on September 5, 20 10, the main structure decoration of Chengnan Station, the main structure between Chengnan Station and Higher Education Park Station and the evacuation platform passed the pre-acceptance. Substation and traffic facilities passed the pre-acceptance in June 20 10, 17, 20 16, 26, 2065438 and 2065438, and the civil air defense project was in June 2065438 10. 20 10, 1 1.9, the fire protection project has passed the acceptance; 20 10, 1. 1.5, the civil air defense project passed the completion acceptance; At 20 10, 1.65438. 20 10, 1 10, 16, 20 16, 20 17, 2065438, chengnan station and other main structural data were successfully handed over to the urban construction archives.

5. Strengthen coordination, elaborate organization, strictly control the project cost, and ensure the benefits and talents of the project. I visited the supervisor, designer and owner for many times, organized the contract department, engineering department and other departments to complete the engineering design change and negotiation 10 on time, and improved the relevant signing procedures. Strengthening the training and management of technical cadres has guided many interns, and now many of them have grown into technical backbones.

6. Strengthen leadership and be responsible for project quality. Around the key work of the project department, various learning activities were carried out, which comprehensively improved the overall quality and professional level of cadres and workers. At the same time, the external coordination has been strengthened, and the cooperation with outsourcing testing units has been strengthened, and the laboratory level has been greatly improved.

Mainly to grasp the progress of the project, control the quality of the project, and cooperate with the deputy manager to grasp the safety production management of the construction site.

The construction of 20 10 project has entered a critical period. Whether the project can be completed on schedule is the primary problem for every builder. As the chief engineer, we should keep abreast of the progress of the project and strictly control the quality to ensure the smooth progress of the project.

At work, I can improve my sense of service, give advice to the construction team, find ways, combine the engineering practice, adopt reasonable and advanced construction technology, and speed up the construction progress. The management level, technical ability and personnel quality of the construction team are not very high. The ability to solve problems and deal with emergencies is not strong. In the construction site, when you encounter problems, study with everyone, brainstorm and find ways.

There are many uncertain factors in underground excavation, and landslides and water inrush often occur. I often go deep into the construction site and patrol the construction site with engineers every day to master the situation of each point. Find problems, deal with them in time, and report to the leaders in time if they can't be handled. For emergencies such as landslide treatment, I can go to the site in person, check the situation, study with the supervision, geology and ZuoYeDui on the spot, formulate the construction plan and supervise the implementation. Simplify the examination and approval process and speed up the construction.

There are many working faces in Changping Line, and there are insufficient management personnel in the early stage. Most ZuoYeDui personnel are migrant workers, and their quality awareness is poor. In pursuit of progress, quality is easily overlooked. I will go into the cave with engineers and supervisors to check the quality and strictly control the quality. Unqualified products are not allowed to be transferred. Joint acceptance system is implemented for key working procedures and concealed works to ensure the quality of the whole project, so that the quality of the project is always under control. According to different construction stages, the key points of quality control should be determined in time. I organized technical cadres to learn concrete construction specifications and anchor spray specifications. Pre-job training was also organized. The work and specific index requirements for preparation, inspection and acceptance before, during and after support are defined. So as to ensure the smooth development of quality control projects. In the underground excavation of tunnel, it is difficult to control the plane and elevation, so the survey work is very important. We require the ZuoYeDui to carry out the construction in strict accordance with the specifications and detailed rules. Due to strict requirements and proper control, tunnel excavation is progressing smoothly. The maximum horizontal breakthrough error after breakthrough is 52mm, which meets the specification requirements (100mm). The maximum vertical penetration error is 32mm, which is also within the specification requirements (50mm). The survey ensures the smooth connection between the project progress and the whole project. Winter construction measures are an important guarantee for concrete construction quality. I organized the formulation of winter construction measures and strictly implemented them. No construction can be carried out if it fails to meet the winter construction standards, and the resulting construction period and economic losses will be at your own risk. This ensures the quality of concrete construction in winter.

Due to the lack of engineering cost surveyors, coordinate the engineering department to participate in the contract department. The audit of the content, quantity, unit price and cost of the changed project can be reasonable and legal, with sufficient evidence and complete procedures. Before the monthly valuation and payment meeting, I and the personnel of the engineering department and the contract department carefully reviewed the engineering quantity to ensure the accuracy, and then reported the research situation at the meeting.

7. Staff night school and technical cadre training.

The technical personnel in the project department account for the majority, so it is very important to do a good job in science and technology and social work and mobilize the enthusiasm of technical personnel for the smooth development of the project. Party and government leaders attach great importance to science and education. At the beginning of this year, I organized a study meeting on stent technology. Before the meeting, I worked with relevant personnel to determine the location, number of people and agenda. And organized a number of technical cadres to go out to visit and study, and used the night school of employees to preach the important and difficult technologies in construction to the technical cadres many times, and asked the technical cadres to write their experiences. Technical competitions were also held to reward the excellent and punish the poor, which mobilized the enthusiasm of technicians and actively participated in scientific research.

Three, keep a clear head, establish a good image of honesty, strengthen the construction of their own clean government, and consciously accept the supervision of the masses.

I cherish everything I have now. I want to create a safe and calm environment for my family and myself. Therefore, through the education of Party committees and leading bodies and my own study, I can be honest and self-disciplined in strict accordance with the code of conduct for cadres in party member, a provincial organ, and maintain a good image of honesty and self-discipline.

In order to implement the provisions of the party's work style and clean government construction, set an example, take the lead in setting an example, and insist on what others are asked to do, you must do it first, and you cannot do what others are asked not to do. Earnestly abide by the system of leading cadres' income declaration, gift registration and personal major events reporting. In daily work and life, pay attention to start from scratch and exemplary implement the company's various rules and regulations. In terms of receiving visitors, inspecting and guiding grassroots work. Take the lead in severely stopping public funds from eating, drinking and giving gifts. Consciously accept the supervision of the broad masses of cadres and all walks of life, pay attention to heart-to-heart communication with the broad masses of workers, and solicit opinions and suggestions on their own and their own work.

Iv. 20 1 1 Work prospect and future efforts.

Over the past year, with the care and support of the superior leaders and the help and cooperation of everyone, the work of the whole year has been successfully completed. The main experiences are as follows: first, the results of great attention and strong support from leaders; Second, the joint efforts of all departments and relevant employees. Although some achievements have been made in all the work, there are still many gaps and some problems and deficiencies compared with the requirements of superiors and everyone's expectations. Mainly manifested in: the degree of ideological emancipation is not enough, and the sense of innovation needs to be further strengthened; The coordination of all units and departments is not strong enough; In the future, I will further strengthen my study, improve my political literacy and theoretical level, overcome existing difficulties and shortcomings, work hard and forge ahead with a strong sense of professionalism and responsibility, and make new contributions to the technical research of our company.