List the author, title, serial number, publication date, publishing unit or data source of relevant materials, which may include ● approved project plan, contract or approval of higher authorities ● published materials related to the project ● materials cited in the document, adopted software standards or specifications 2. Premise 2 of feasibility study.1requirements: list and explain the basic requirements of software development to be carried out. Such as ● Function ● Performance ● Input/Output ● Basic data flow and processing flow ● Safety and confidentiality requirements ● Other systems related to software ● Completion date 2.2 Objectives: It can include ● Saving manpower and equipment costs ● Improving processing speed ● Improving control accuracy or productivity ● Improving management information service ● Improving decision-making system ● Improving personnel work efficiency 2.3 conditions, Assumptions and restrictions: It may include ● Minimum life of the software to be developed ● Time limit for comparing obvious options ● Funding sources and use restrictions ● Legal and policy restrictions ● Conditions and restrictions of hardware, software, operating environment and development environment ● Available information and resources ● Proposed latest time for developing software to be put into use 2.4 Feasibility study method 2.5 Main factors determining feasibility 3 Analysis of existing systems 3. 1 Processing flow and data flow 3.2 Workload 3. 3.4 Personnel: List the professional technical categories and quantity of required personnel 3.5 Equipment 3.6 Limitations: Explain the problems existing in the existing system and why it is necessary to develop a new system 4. Feasibility analysis of the proposed technology 4. 1 System Description 4.2 Advantages compared with the existing system 4.3 Processing flow and data flow 4.4 Possible impact of adopting the proposed system. ● Impact on equipment ● Impact on existing software ● Impact on users ● Impact on system operation ● Impact on development environment ● Impact on expenditure 4.5 Technical feasibility assessment: including ● Whether the functional purpose is achieved under restricted conditions ● Whether the functional purpose is achieved by using existing technology ● Whether the requirements for the number and quality of developers can be met ● Within the specified time limit, Can the development complete the economic feasibility analysis of the five proposed systems 5. 1 expenditure 5.2 benefits 5.3 income/investment ratio 5.4 payback period 5.5 sensitivity analysis: it refers to some key factors, such as: ● system life cycle length ● system workload ● processing speed requirements ● Analysis of the impact of equipment and software configuration changes on expenditure and benefits. Free Paper Model Network cacl.com 6 Feasibility Analysis of Social Factors 6. 1 Legal Factors: such as contractual liability ● Infringement of patent rights ● Infringement of copyright 6.2 Feasibility of user use: such as administrative management of user units. Management ● Work system ● Can the quality of personnel meet the requirements? 7 other alternatives explain the other alternatives one by one, focusing on the reasons why they are not recommended. 8 Conclusion ● You can start organizing development ● You need to wait for certain conditions before you can develop ● You need to make some changes to the development objectives ● You can't do it or you don't need to do it ● For others, please refer to the resources on the following websites:
/html/c65/index.htm