2. Health pension
3. Environmental protection and clean energy
4. Food and water conservancy
5. Oil and gas
Step 6 transport
7. minerals
Analysis of eight benefit plates of NDRC promoting seven engineering packages
Netease Finance 65438+February 4 The National Development and Reform Commission held a press conference this morning entitled "Accelerating the construction of major networks such as information power grid, oil and gas, clean energy, oil and gas and mineral resources protection". Li Pumin, Secretary General of the National Development and Reform Commission, Qi Chengyuan, Director of the High-tech Department, and Luo Guosan, Deputy Director of the Investment Department attended the press conference and answered questions from reporters.
Li Pumin, Secretary-General of the National Development and Reform Commission, introduced the situation of "accelerating the construction of information power grid and major networks such as oil and gas, clean energy, oil and gas and mineral resources protection", and stressed that strengthening the construction of major projects and actively promoting the seven major project packages (note: food, water conservancy, transportation, ecological environment protection and healthy old-age care were announced at the press conference of the National Development and Reform Commission last week) cannot be separated from the active participation of social capital, and the state will encourage and attract social capital, especially those including coastal nuclear power projects. Netease Finance has sorted out the concept plates involved in these seven engineering packages for readers.
The first is major network engineering packages, such as information grid, oil and gas. This project package mainly includes three aspects: first, accelerate the construction of the new generation information infrastructure in the country. Adhere to the principle of marketization and encourage social investment to participate in construction. At the same time, the state will arrange certain subsidy funds for the central and western regions, rural areas and other areas with weak basic conditions, and guide local and enterprises to increase investment and moderately develop ahead. The second is to speed up the construction of trans-regional power transmission, regional trunk power grid, urban power grid and rural power grid, and enhance the comprehensive power supply capacity. A number of long-distance and trans-regional transmission channels will be built to basically meet the demand for external power transmission in Beijing, Tianjin, Hebei, Shandong, Yangtze River Delta and Pearl River Delta before 2020, as well as the trans-regional power transmission demand in hydropower bases and wind power concentrated development zones. The third is to speed up the construction of oil and gas pipeline network and storage facilities to ensure the safe and effective supply of oil and gas resources.