Calendar problem
: ?
Experienced employees enter: please delete this item for new employees.
? ()
Company Name and Enterprise Name Work (Development)
Calendar problem
: ?
Experienced employees enter: please delete this item for new employees.
? ()
Company Name and Enterprise Name Work (Development) Time
(? //? )
Work content (total sales, number of employees, names of main products and equipment)
Hyundai motor company
1985.2
~ 1998.7
1985? 2 ? ? 1998? 7 ? 13? 5 ? ? .
February 1985, recommended by acquaintances, came to work in Hyundai Motor Quality Management Department. By July 1998, I was in charge of quality management here 13, five months before my retirement.
2? ? ? .
After two years of warranty, I am responsible for the improvement of quality problems.
Embedded, field, account,,? ,, ? ? Trim the part? / ? ? Dr. Triem/PKG Triem? ? . (? / ? ? )
In-line quality problems, on-site quality problems, A/S quality problems, enterprise management, user reception when claims occur, and internal activities of the company are all in contact. Responsible for the cause investigation, scheme formulation, recovery management and post-event management when quality problems occur, and also responsible for the interior and exterior decoration, painting and gold plating of vehicle interior parts, as well as the interior decoration and various filling types of DR TRIM/ PKG TRIM.
3 ? ? , ? ? TFT(,,,,,,) 1? ? ? . ? ? .
3 years before retirement, responsible for automobile chassis, brake system, fuel and exhaust system. In order to select and improve acute problems, a professional research team TFT is set up to manage and deploy (design, technical support, development, procurement, production, quality management, quality assurance, enterprise management) and other departments to meet once a week 1 time; After visiting management enterprises and investigating enterprise projects, take improvement activities and contents. Report to the president at the end of the year. Also, I attended the task assignment meeting and won the factory excellence award.
2003.3~2007. 12
New seismological chemistry
Shiri (company name)
2003? Dr Triem? ?
In 2003, I worked in the chemical quality management department of Xinzhen, responsible for the output products such as DR TRIM and audio baking.
2005 ? Protection? // ? RSM? SUV? Hauling floor components? ? Horizontal++? Cover me. ? , Bond? ? . ( : ? 250? )
In 2005, under the strong recommendation of …, I set up a new export working group under the new rules and regulations, and was invited by the new spray insurance group. After careful consideration, I agreed to their requirements and took charge of the development, quality and production teams, such as injection and introduction, at the beginning of the new factory. At RSM, LUGAGE floor assembly installed on the prepared SUV model is safely produced. The products produced in …… are the same as the current manufacturing method mentioned above. The manufacturing method that the company initially tried to use was low-voltage output, and BOND was not used. This is a non-mechanical connection method.
2008.9~20 10. 1 1
Dahan stainless steel tube
2008.9~20 10. 1 1
Continuous quality assurance department
deputy director
Muffler ass? Sub-pipeline Central resonator assembly. MAMI before the front manifold SUS publishing house , pipe? . Bend over. ? ? Ass? ? SQ? TS 16949/ISO 1400 1? ? ? ? ? ? ?
? , ? ? ? .
Pipe and central resonator assembly. The front manifold, which becomes a part of the muffler assembly, is in production. The former MAMI in the casting was replaced by SUS press. In order to reduce the weight of the car and improve the horsepower, we tried to change the manufacturing method of the material. Pipeline maintenance, elbow welding and assembly products are included in the customer's …, implementation review SQ, response review TS16949/ISO14001and customer engineering supervision. If your company gives me this opportunity, in order to cope with the ever-changing market trend, I will make your company take off with me through my position and lifelong learning with accurate prediction of the future and creative challenge spirit, and always do my duty and respect others, so I will become a useful talent for your company's development, and I also believe that your company can give me a platform to show myself.
I can help you so much with my limited translation knowledge. I hope I can help you. There are too many professional things.