Summary of planned work for next week 1
First, the real estate week work summary
1. Issue the roof change report of Taishan Xintiandi.
<Summary of planned work for next week 1
First, the real estate week work summary
1. Issue the roof change report of Taishan Xintiandi.
2. Complete the field survey of Hancheng Impression Building No.3 (communicate with the entrusting party due to the basement problem).
3. Complete the field survey of Building 3~7 in Yun Qi Garden.
4. Private property has been accepted by 18 households, processed by 15 households, and the remaining three households are being processed.
Work plan for next week
1. Complete the drawing calculation, review and acceptance report of buildings 3-7 in Yun Qi Garden.
2. Contact British Manor for the actual measurement of villa area.
3. According to the change acceptance of building 7 in Haiyan Tianque, complete the forecast report.
4. The survey was carried out in Building No.3 and Building No.4 of plot No.4 in Zhichuan.
Second, the project week work summary
1, demarcation and mapping of tundra.
Work plan for next week
1. The settlement of buildings 2, 5 and 8 in Haiyan Tianque was observed.
Summary of last week's tundra demarcation work
The use and operation of the instrument can meet the needs of the work, but in the actual demarcation, the land boundary was not carefully measured, and the things measured by ourselves were not clear, which led to retest.
Because it is the first time to carry out demarcation survey, I am not familiar with the demarcation business, and the things and points that need to be paid attention to in the later demarcation drawing are not clear, and no one has learned it. Have the time and opportunity to organize everyone to learn this skill systematically.
Summary of next week's planning work II
In order to make the next work more effective and clear, and summarize and communicate all the problems encountered in the work, we made specific arrangements and plans for the work last week and next week:
Last week's work focus:
week
1. Accompany General Manager X and General Manager xx to the Personnel Bureau of the municipal government to exchange views on the recruitment of eight career posts in Shandong University.
2, according to the provisions of the company to the scene investigation.
3. Take business cards and brochures at Hongguang Road and buy power cords at Wholesale Street.
Tuesday
4. Hold regular working meetings in the morning to discuss and make the physical work plan for next week.
5, design the company trademark and ppt company internal personnel training courseware.
6. Director Liu conducted the first half-hour training in the conference room on the third floor, and summarized all the work contents.
7. In the afternoon, assist Director Liu, xx and xx to clean the room and office where Flammulina velutipes are stored on the third floor.
Wednesday
8. General Manager Zhang, Director Liu and Ma attended the regular work meeting in the morning to study the next step.
9. Install the network cable and set up printer sharing.
10, go to the construction site to investigate the situation according to the company's regulations.
Thursday
1 1. I asked for leave in the morning because of something, and went to the restaurant at noon to help (the leaders of the development zone came) to discuss the visit of Shanda tomorrow.
12. in the afternoon, accompany general manager x, director x and xx to the municipal party Committee and municipal government, book a room at xx hotel, get a construction permit at the service center, go to Dianshi advertising design company to see the floor plan and bird's eye view, and buy entertainment supplies at Jintiandi supermarket.
Friday
13, pick up General Manager X and Directors X and xx in the morning to arrange a visit to the company meeting room.
14. Accompany General Manager X and Director X to receive Professor Zhang and his party at the west exit of xx Expressway.
In the morning 15 and 1 1: 30, arrange accommodation and organize reception at xx hotel.
16, at 2: 30 pm, pick up Professor Zhang from xx Hotel to attend the meeting in the company.
17, eat at xx's house at about 5: 30 in the afternoon.
18, send Professor Zhang and his party to the hotel for rest around 8: 30 pm, and send General Manager X, Directors X and xx home.
Saturday
19, pick up General Manager X, Directors X and xx at 6: 30 in the morning, and accompany Professor Zhang and his party to the hotel for breakfast.
20. Arrive at the foot of longxing temple and Yunmen Mountain at 8: 00 am15, stay for about 30 minutes, and return to the company to watch the meeting.
2 1, about 10: 10 in the morning, accompanied General Manager Zhang and Director Liu to the expressway to see Professor Zhang and his party off.
22. At 1 1: 00 in the morning, General Manager Zhang organized and summarized the matters needing attention in this visit, so as to implement the work.
23. Check out at xx Hotel around 1: 30 in the afternoon, and buy a mobile hard disk and switch in the computer city.
Work plan for next week:
1, cooperate with leaders and other personnel to deliver the work.
2. Prerequisites for completing certain project procedures.
3. Complete the draft feasibility study report.
4. Develop ppt training courseware.
5. How to pay labor insurance for company personnel?
6. Formulate the detailed route of Lianyungang inspection project.
7. Summarize the details of overseas inspection and reception.
8. Cooperate with Director Liu to complete and formulate the company's safety system.
9, routine to the site inspection, etc.
Summary of next week's planning work 3
First, the understanding of work.
First of all, the office secretarial office is an intermediary post, and the office is responsible for the uploading and publishing of the whole group. Therefore, secretarial work must do the following:
1. Obey, all work should obey the orders and arrangements of the leaders and the work plan of the administrative clerk.
2. Understand thoroughly and act according to the intention of the leader.
3. To implement, we must resolutely implement the leadership will, strengthen the execution, and do a good job in summarizing the work of office clerks.
However, obedience is not passive. A lot of work can be predicted in advance and actively carried out, so as to grasp the work trends in all aspects in time and accurately, feed back all aspects of information to leaders in time, pay attention to investigating the past, and provide decision-making reference for leaders; At the same time, office work should also pay attention to strategy and work art, and do a good job of communication and coordination among leaders, colleagues and departments seriously and scientifically. No wrangling, pushing the Committee, there is a gap in work. Secondly, the office secretarial work is equivalent to the group's small housekeeper, the daily procurement and distribution of office items; The registration and filing of common items of all subsidiaries are completed by the office, so the office secretary must have enough patience and love his work. The work plan is the work plan of the administrative clerk.
Second, the future work plan
1. In my daily work, I will do the following:
(1) Assist the director of the office to register, report and distribute all kinds of official documents, sort out the documents that are not specifically sorted by category and put them into labeled folders.
(2) Do a good job of sending and receiving cold gadolinium parts.
(3) Do a good job in sorting, warehousing and reimbursement of various accounts for forged consumables.
(4) to assist the director of the office in managing the official seal. Register the use of the official seal in detail, strictly implement the management regulations of the Group's official seal, and do not abuse the official seal.
(5) Do a good job in the management of office supplies. Do a good job of collecting office supplies, distribute them as needed, do not waste them, and count them on time, so as to replenish office supplies in time and meet everyone's work needs.
(6) do a good job in the maintenance of office equipment,
(7) Assist the director of the office to do a good job of scheduling and duty during holidays to ensure the safety and security of the group during holidays.
(8) Complete other tasks assigned by the leaders seriously, on time and efficiently.
In my daily work, I must follow the principle of precision, detail and accuracy, make careful preparations and arrangements, achieve standard work and standard posts, and strictly follow the rules and regulations of the office.
2. In administrative work, I will do the following:
(1) Do a good job in leadership service: complete all tasks assigned by the office director, managers of various departments of the group and department heads in time. Be a leader's helper and assistant, be anxious about what the leader is anxious about, want to lead what he thinks, run errands frequently, report more, and be a good staff assistant.
(2) Do a good job in the service of all departments: strengthen the contact and communication with the information officers of all departments, systematically and quickly transmit information, and ensure that information is delivered in place in a timely and accurate manner within the company.
(3) Do a good job in direct service: feed back the information of the group employees to the company leaders in time, and do a good job in direct communication with the leaders.
(4) Assist the Director of the Office to improve the rules and regulations of the Group.
(5) Do a good job of information: keep the commonly used office documents and file them; It is necessary to collect all aspects of information in a timely, accurate and comprehensive manner and do a good job in filing.
(6) Do a good job in paperwork: finish all kinds of manuscripts assigned by leaders in time, learn the writing of all kinds of written materials, and improve your writing skills.
Summary of next week's planning work 4
This week's work is over, and I have finished the basic tasks for a week. But I also have a lot of questions. It is common to encounter problems in my post, so I don't think there is anything wrong with it. On the contrary, I inspired my indomitable spirit and made constant breakthroughs.
Because I am responsible for my work, there are few problems in the financial department I am responsible for, and I meet the requirements and complete the basic operations every time. This is that my job meets my job requirements, and I have always insisted on my job and often consulted and studied for my work. Because I feel that I am not as good as others, and I need to make progress, so I have learned to keep learning and listening.
We report and summarize our work every week as required. I summed up my mistakes and careless problems during the week. Because of some simple things, I was a little careless, so I finally made a mistake and regretted it. I also review my work every time, so I stick to it every time, which also strengthens my work.
My work efficiency is not so high, and my work is not so good. I often fail to hand in my tasks on time because of some mistakes I have made, so I have been improving my speed and efficiency. Always give yourself some pressure to finish overtime. As I do more and more work and get familiar with the steps and details of the work, the speed will naturally be faster and the efficiency will be improved a lot.
Every day, I emphasize the importance of work. I often add a lot of burden and pressure to my work. I often tell myself to be steady and not to worry. Once we make a financial mistake, it will be a huge hole. Although we don't need to be responsible for this, it also harms the interests of our company and doesn't conform to our company's development plan, so it's better to obey the requirements and orders.
At any time, I never forget my job responsibilities. It's not that there is no pressure, so there is no need to be responsible or bear the pressure. On the contrary, I need to constantly strengthen my own construction and development, improve my ability and efficiency, and grasp the main key issues. Although the working hours in a week are very short, I also need to analyze and summarize. My strength is patience, which lightens my burden and pressure and makes me feel a lot of fun.
I am clearly aware of my responsibility. I don't need to think about things that are no longer beyond my functions. I just need to think more about my own shortcomings. Of course, I must have a sense of responsibility and perseverance. I can't do anything without this. This is the result of active requirements and efforts. You need to reflect and summarize your progress every day.
Here are some personal plans for working next week.
1. Obey the company's arrangement and actively cooperate with the department.
2. Unite colleagues in the company, make active efforts, and find solutions in time when encountering problems.
3. Improve your financial responsibility, don't forget your more basic tasks, and finish your work timely and accurately.
4, overall coordination, cooperate with the work, complete the basic work on time.
Summary of next week's planning work 5
First, this week's work summary:
1.65438 February _ _ _ _ Is continuous leaching adopted in the first phase of Ridong Mine?
Prepare the scheme report and report it to the project construction headquarters.
2.65438+February _ _, the process group of East Mine Project Command went to Dongfang Manganese Industry Kexin Company to follow electrolytic manganese.
Make a final summary of the medium plate test, write a summary report and report it to the project construction headquarters. At the same time, make a preliminary analysis and recommendation on whether to go to the medium plate production line in the first phase of Dongfang Mining.
3.65438+February _ _, according to the resolution of the project headquarters, the process group planned the annual output of Dongfang Mining 1500 tons.
The pilot production line of electrolytic manganese metal carries out preliminary design scheme and preliminary capital construction investment budget report, and reports it to the construction headquarters.
4. According to the plan of the project department, cooperate with Hunan Chemical and Pharmaceutical Design Institute to carry out the soil construction of each workshop in the first phase of the project.
The design of the construction drawing requires the design institute to draw the drawing as planned. On February, 65438, Hunan Institute of Chemical Medicine made a blueprint and sealed the civil construction drawings of purification workshop retaining wall and high pool.
5. The personnel of the process team continued to track the trial production site of electrolytic manganese medium plate in Dongmeng Kexin Company in three shifts.
Understand the operation process indicators and operation conditions of each post, summarize them every day, and dismantle them all back to the project department for office on February _ 65438.
6. The design site of the switch station of the first phase project is designed by the process group, the electrical group, the civil engineering group, the princes and the chemical design institute.
The exterior elevation layout shall be docked and the construction scheme shall be determined, so that geological prospecting units can enter the site for construction.
7.65438 In February, I met with Dr. Pan and Dr. Zhu from china environmental science Research Institute in the conference room of the project construction headquarters.
Experts discussed the construction technical scheme of the first phase project of Hunan Oriental Mining, and made a preliminary understanding and research on whether concentrator equipment was used in the process.
Second, the work plan for next week:
1. According to the requirements of the project construction headquarters office, the process group of the project department will complete 20 years before 65438+February.
Work summary.
2. Require the personnel of the process team of the project department to make a comprehensive summary of all the processes of electrolytic manganese medium plate production in Kexin Company.
Finally, the existing problems in production are discussed.
3. Docking with Hunan Chemical Medicine Design Institute, requiring the design institute to draw the construction drawings of each workshop according to the project plan.
4. Cooperate with the civil engineering team of the project department to prepare for the construction team of the electrolytic workshop to enter the site.
5. Continue to cooperate with the equipment group and electrical group in the project headquarters to discuss the equipment and power in the first phase of the project.
The scheme of the device is constantly optimized and improved.
6. Carefully verify the process condition diagram of electrolytic workshop drawn by design institute, and conduct comprehensive fine-tuning where fine-tuning is needed.
Verify the adjustment, and reduce the investment of civil engineering cost on the premise of ensuring the process.
7. Complete other tasks temporarily assigned by the project headquarters in time.
Summary of next week's planning work 6
I. Summary of this week
I didn't do much this week, but as usual, I did a good job in making accounts, making financial statements, checking some documents, auditing revenue and expenditure, and making money. I checked it carefully before I did it, and there were no mistakes. I know that even a decimal point error in finance may cause huge losses and even some consequences that I can't bear. I always do it carefully, then review it repeatedly, and check with my colleagues to avoid making mistakes. A week's work is not particularly much, but I am also actively doing it well. Since I am in this position, I should do well. This is my quality. At the same time, I did something that I didn't usually deal with before this week, which also increased my experience and learned more about finance, I think.
Second, the plan for next week
A week's financial work, only by making a plan in an orderly way, can also make me more aware of what I want to do, not just being busy every day, not knowing what I want to do, but also easily doing it in a muddle. So I also have to make a plan for what I will do next week, and I will do my daily financial work seriously next week. At the same time, I have to attend a department training. Invited a well-known financial person from the same company to give us training. I also want to listen carefully and take notes. Originally, my level was not particularly high, but I worked hard and didn't make any mistakes, but I wanted to make progress. I also want to know more about how others do things and what is the gap between myself and excellent people, so that I can have more motivation to move forward. Next week, I want to prepare the financial statements required by the leaders, and then hand over the data to the leaders. A week is not a long time, but there are still many things to do, and one by one.
By summing up and making a good plan, you can make your work more purposeful and know where your shortcomings are. We have to improve one by one in the future. Only when I have more experience and know myself better can I do financial work better. If there is a chance of promotion in the future, I will be more prepared and confident to fight for it.
Summary of planned work for next week 7
I. Summary of this week's work
(1) to organize and coordinate Lei Ping Zhenshan sugarcane planting base.
According to the work arrangement of the county government, our bureau is responsible for sugarcane planting in Shangshantun 1070 mu seed base of Xinli Village in Leiping Town. Since the task was assigned, our bureau has actively contacted and coordinated with the Agricultural Machinery Bureau, the Water Conservancy Bureau and the Leiping Town Government to seize the time to do all the work well. At the same time, contact Lvtai Agricultural Company to purchase excellent sugarcane seeds. At present, the planting area of sugarcane seeds in the base has reached 200 mu, and the rest of the land area will be fully sown this autumn.
(two) actively participate in the work carried out by the county "double high" office. Since the establishment of the county "Gao Shuang" office, our bureau has sent a deputy director and a professional technician to work in the county "Gao Shuang" office, and actively cooperated with all the work. At present, relevant work is proceeding smoothly and orderly.
(3) Go deep into the grass roots to guide and supervise sugarcane field management. Our bureau is comprehensive and thorough.
There are 15 townships (towns) in the county, with emphasis on sugarcane planting and field management. At present, the county has completed topdressing of 288,000 mu, weeding of 2 1 10,000 mu and pest control of 20,000 mu.
(four) to assist the restructuring of sugar enterprises. Sugar industry is the pillar industry of our county. In order to implement the notice requirements of the county party committee and the county government on printing and distributing the Implementation Plan for Leaders of Chongzuo Municipal Party Committee and Municipal Government to Visit the Central Ministries and Commissions and the Division of Major Achievements of Enterprises, our bureau actively communicated with COFCO to promote COFCO's participation in the reorganization of sugar enterprises in our county. Through active communication with COFCO and strengthening the coordination of follow-up services, COFCO is currently conducting a comprehensive survey on the sugarcane area of daxin county Lei Ping Yongxin Sugar Co., Ltd., and reorganizing with daxin county Lei Ping Yongxin Sugar Co., Ltd. according to the survey results. Drafting the key work plan of Daxin Sugar Industry.
(five) to urge sugar enterprises to do a good job of payment for sugar cane. During the 20xx/20xx cropping season, although the market price of sugar has gradually increased, the pattern of operating losses or meager profits of sugar enterprises has not been fundamentally reversed, and the development of sugar industry still faces severe challenges. In this case, sugar enterprises in our county actively raise funds and pay a certain amount of sugarcane money to farmers in time. As of May 26th, 20xx, three sugar enterprises in our county have paid 724 million yuan for sugar cane, 397 million yuan for sugar cane and 327 million yuan for sugar cane, with a payment rate of 548.3%, of which: Lei Ping Yongxin Sugar Co., Ltd. paid 396 million yuan for sugar cane, 2 1 40,000 yuan for sugar cane and 01for sugar cane. Century Longfei Sugar Co., Ltd. paid 223 million yuan for sugar cane, 83 million yuan for sugar cane and 65.438+40 million yuan for unpaid sugar cane, with a redemption rate of 37.22%. Gui Xiang Sugar Co., Ltd. paid 65.438+005 billion yuan for sugar cane, paid 65.438+000 million yuan for sugar cane, and paid 005 million yuan for sugar cane, with a redemption rate of 95.24%. At the same time, urge the township (town) to pay attention to the dynamics of sugarcane farmers, do a good job of explanation, stabilize the sugarcane farmers' thoughts, avoid the phenomenon of sugarcane farmers petitioning because of the problem of cashing sugarcane money, and safeguard the cooperatives.
It will be slow and steady.
Third, the work plan for next week
1, urge sugar enterprises to increase fund-raising, do a good job in cash payment of sugarcane money in time according to the relevant requirements of autonomous region and Chongzuo sugarcane area management and cash payment of sugarcane, and promote field management of sugarcane.
2, concentrate on participating in the construction of "double high" sugarcane base.
3. Continue to do a good job in sugarcane planting in Shantun Improved Seed Base in Xinli Village, Lei Ping Town.
4. Strive to complete the general election of the National People's Congress handed over by the county government.
Summary of planned work for next week 8
The completion of personnel work this week has deepened my understanding of my responsibilities. In fact, while doing a good job in personnel work, we should also explore the existing laws. Whether it is pre-recruitment or new employee training, it is a problem worthy of our deep thinking. It is important that no matter what problems we encounter in personnel work, we should not be confused. In order to better plan personnel work, we should sum up the tasks completed this week and make plans for next week in advance.
Although the number of new employees recruited is small, the overall quality has been improved. In this week's personnel work, I contacted some candidates through traditional recruitment channels. Both their performance in the interview and their recognition of corporate culture are satisfactory, and the experience in their resumes is closely related to the positions they applied for. Naturally there won't be too many problems. Only in terms of corporate culture, candidates need to have a common concept in order to have long-term development. Fortunately, through the interview, we can know that their impression of the company is still relatively good. Although some candidates have to be carefully considered whether to stay or not, they have to admit that their comprehensive quality is indeed relatively high.
Attendance strictly implemented the management system of the personnel department and made statistics on the data. This week, employees of enterprises have performed well in observing the attendance system, especially the practice of not being late for work, which should be continued. However, due to the illness of individual employees, I have to choose to take time off. While counting the attendance data, I also strictly followed the departmental regulations and backed up the data. In the management of employee data, it is assessed according to recent performance. Considering that some employees want to apply for formal employment, it is better to follow the corresponding process.
Because there is a lot of personnel work to deal with next week, we should plan ahead. For some new employees, pre-job training should be conducted as soon as possible to make them adapt to their own working environment, and inform them of the application of work skills and the relevant regulations of the company. The employment confirmation application should be reported to the leader, and the employee file should be printed. Considering that there is not enough paper in the printer, I should also apply to the logistics department as soon as possible. If you wait until you need to print the document, you will not pay enough attention to it. In addition, I will update the information released by the online recruitment platform and pay more attention to this work.
Through the completion of personnel work this week, I have more confidence in my future career development. I have to improve my own shortcomings while accumulating experience, so as to better complete the personnel work. I will also strive to complete the tasks assigned by the department leaders while complying with the regulations of the personnel department, and look forward to achieving the expected goals through my own efforts in the personnel work next week.