Current location - Education and Training Encyclopedia - Resume - English resume of automobile industry
English resume of automobile industry
Self-evaluation:

Four years working experience in UPS debugging, site installation and maintenance. Three years project management experience, good cross-functional communication experience. At least three years technical experience in direct communication with foreign experts in the factory, good problem-solving ability. Half a year's overseas working experience (installation, debugging and maintenance of UPS project of "Michael Connected Victoria Dam Substation" in Sudan alone), with good adaptability to overseas working environment.

Familiar with UPS, diesel generator and other power products. Good electrical professional knowledge, familiar with the internal structure, technical principle and characteristics of UPS power products; Able to independently complete the overall debugging, on-site installation and maintenance of UPS products; Able to complete the selection of UPS, supporting accessories and equipment design drawings in the project. Good computer document editing ability, proficient in spoken English.

February 2005-July 2005 Jiangxi Changli Automobile Spring Co., Ltd.

Industry: automobile manufacturing

Position: Assistant Engineer (Internship)

Main responsibilities:

1, responsible for the daily operation and maintenance of UPS system in automobile spring rolling workshop.

2. Be responsible for operating and monitoring the mill, and assist in maintaining the faulty equipment when the mill fails.

3. Assist them to complete the daily maintenance of the workshop.

4. Help to complete the rolling upgrade of the workshop system.

Work performance:

1, found out the hidden trouble of UPS equipment many times during work, and eliminated the hidden trouble through technical exchange with UPS manufacturers to avoid the paralysis of production line caused by equipment power failure.

2. Since the operation and supervision of the rolling mill, the rolling mill has run well, the output has increased steadily, and the output is expected to exceed the quarter.

2005/08-2008/ 12 Zhengchang Times Shenzhen Electric Power System Co., Ltd.

Industry: Israeli agent GRMATRONIC UPS

Position: Engineer

Main responsibilities:

1, responsible for the performance test of GRMATRONIC μPS-SP/INDUSTRIAL series UPS in Israel, and direct technical exchange with foreign manufacturers.

2. Be responsible for the installation, debugging and maintenance of UPS systems in all areas.

3. Assist the sales department of the company to provide pre-sales technical support and design the project according to the actual needs of customers.

4, responsible for the company's successful sales of project design drawings, specifications, etc.

5. Be responsible for UPS customer technical consultation and system technical training.

6. Be responsible for the inspection and maintenance of national UPS.

7. Be responsible for the installation, debugging and maintenance of UPS system of successful foreign projects.

Project experience:

As Time Company has done many projects in Shenzhen Zhengchang Power System Co., Ltd., the following are only a few of them: including Beijing Taiyanggong Power Plant, Hunan Changsha Power Plant, Qian 'an Datang Thermal Power Plant, Beijing Changchengzhuang Gas Power Plant and Jiangsu Taizhou Power Plant.

Project description: Design the power supply UPS system, including the design of bypass cabinet (high-power voltage regulator), feed cabinet (power output circuit), manufacturing instructions, etc.

Description of responsibilities:

1, according to the project agreement, provide the preliminary design drawings and be signed by the design institute to confirm the communication and consultation with the design institute personnel and confirm the final version of the drawings.

2. Be responsible for tracking the arrival progress of foreign customized products, providing the company with the list of materials needed to make counters, tracking the purchased materials, and promoting the project progress until supporting products.