In ordinary daily life, there may be some unexpected accidents. In order to improve the awareness of risk prevention and minimize losses, it is often necessary to make emergency plans in advance. What problems should be paid attention to in compiling emergency plan? The following is my emergency plan for flood fighting and emergency rescue, for reference only. Let's have a look.
Emergency plan for flood fighting and emergency rescue 1 the first item
In order to further enhance the ability of the infrastructure in the second phase to fight floods and respond to sudden floods, and effectively implement the four aspects of "thinking, organization, measures and materials" and the three aspects of "personnel, measures and work" to ensure the safety of infrastructure in flood season, this flood prevention plan is formulated:
Article 2 Scope of application
This plan is applicable to the flood fighting and emergency rescue work of the infrastructure of the second phase expansion project of xx Power Plant.
Article 3 Emergency preparedness
1. Establish the accident handling headquarters for the second phase of xx Power Plant.
2. Each construction unit shall set up a flood fighting and rescue commando team to formulate a flood control plan. After the dangerous situation occurs, members of the infrastructure accident handling headquarters should take the lead in rushing to the rescue site, and quickly mobilize all flood-fighting and rescue commandos and other rescuers to enter the dangerous area to carry out flood-fighting and rescue. All rescue commandos must resolutely obey orders and commands and go all out to ensure the safety of infrastructure equipment and personnel.
3. Before entering the flood season, all construction units are responsible for comprehensive inspection of flood control facilities and preparation of flood control equipment and materials. Safety Supervision Office shall summarize the flood control inspection of relevant departments, urge to clear obstacles and ensure smooth drainage facilities.
4. All construction units should always check and try to turn the drainage equipment to ensure that it can be started at any time in an emergency.
5. After entering the flood season, all construction units should take flood control as one of the main contents of their work; Inspectors should master the danger of flood control 24 hours a day and report to the emergency office immediately after finding the problem.
6. Each construction unit shall organize employees to study this plan and define the division of labor and requirements. Organize a flood control drill before entering the flood season.
Article 4 Emergency Response
1. After the dangerous situation occurs, the personnel of the infrastructure emergency response headquarters shall immediately notify the flood control team members to participate in the emergency rescue work.
2. The person in charge of each construction unit and the flood control team members should arrive at the assembly site within 10 minutes after receiving the notice and act immediately according to the division of labor.
3. The flood control team started the flood control pump to drain water, and the flood control team quickly lifted all the sewage cover plates on the site to facilitate flood discharge, and blocked the water with flood control sandbags. Stop the flood from flowing back into the factory building.
4. When the flood is too large and the fixed drainage pump cannot meet the requirements, a temporary drainage pump should be installed immediately to ensure smooth flood discharge.
5. The flood control team members should develop a high sense of ownership, resolutely obey orders, obey orders, and go all out to protect the safety of state property and people's lives and property.
6 flood rescue commandos should focus on the overall situation, cooperate with each other, carefully organize, and resolutely complete the flood rescue tasks entrusted by superiors.
Article 5 Logistics Support
1. All construction units must prepare enough flood control equipment and materials, which should be managed by special personnel, set up account, and record the collection and distribution. No one is allowed to use it for purposes other than flood control under any pretext, otherwise, everyone will be given an economic penalty of 500 yuan and above.
2. The construction unit is responsible for the vehicle, life and medical security.
3. While organizing the subordinate personnel to do a good job in flood fighting and emergency rescue, pay attention to urging the personnel on duty to stick to their posts, strengthen patrol inspection, prevent illegal personnel from taking the opportunity to destroy and ensure public security stability.
Sixth flood control and disaster relief emergency agencies and their contact telephone numbers.
Article 7 Supplementary Provisions
1. The plan is managed by the Office of the Security Committee.
2. This plan shall be interpreted by the Office of the Safety Committee.
3 in violation of the provisions of this plan, did not fulfill the responsibilities and obligations, resulting in the expansion of the accident, will be assessed in accordance with the provisions.
4. This plan will be implemented from May 1 day of 20xx.
Emergency plan for flood fighting and emergency rescue 2 In order to effectively strengthen the flood control work of water conservancy projects, avoid and reduce the losses caused by floods in flood season, ensure the safety of people's lives and property, and promote the sustainable economic and social development of the township, this plan is formulated according to the overall requirements of flood control safety in provinces, cities and counties in 20 15 years and the actual situation of our township.
A, water conservancy project hidden danger analysis
The topography of the township is high in the north and low in the south, with mountains accounting for 85% of the township area, while hills, valleys and flat dams only account for 15%. The Mumen River and the Shilong River flow through five villages in China. Small reservoirs, mountain ponds, miniature pools and canals and weirs are widely distributed, and they accumulate water quickly in case of flood. In addition, the construction quality of individual ponds and reservoirs is poor, the flood discharge facilities are uneven, and the responsibility for management and protection is unclear. Once the dam breaks, the flood overflows and exceeds the warning water level, and the danger range is large. As far as the inducing factors are concerned, it is obviously influenced by regional rainfall, and the peak period is mainly from May to 10.
Second, prepare for disasters.
(1) Preparation of disaster relief personnel. Mainly rely on party member cadres, militia and volunteers.
And the people in the affected areas. On the premise of analyzing the magnitude of the disaster, carefully deploy the number and composition of participants, organize disaster relief teams to continue training and drills in time, and improve the level of disaster relief.
(2) Reserve of relief materials. Including the materials urgently needed at the rescue site and the materials urgently needed by the victims after the disaster. According to the development trend of the disaster, the government organized relevant departments to raise enough relief materials.
(3) Raise funds for disaster relief. While carrying out disaster relief and self-help, we should report the disaster to the township people's government and the higher authorities in a timely manner according to the severity and development of the disaster, and strive for disaster relief funds subsidies.
Third, emergency measures.
(a) to carry out emergency rescue and disaster relief. Organize disaster relief teams and mobilize the masses to carry out rescue and relief work.
(2) Relocation and resettlement of victims. When sudden disasters threaten people's living and life, all villages and departments should cooperate with the township government, immediately organize disaster relief teams to transfer and resettle the victims, and at the same time ensure the lives of the victims.
(3) Timely treatment. Health centers and animal husbandry stations organize personnel to provide emergency treatment for injured people and livestock and poultry, and strictly disinfect and prevent epidemic in disaster areas to ensure that there is no major epidemic after the disaster.
(4) Strengthen monitoring. Dangerous ponds (reservoirs, weirs, canals) should set up warning signs, designate special personnel to closely monitor and focus on investigation to prevent unsafe accidents.
(5) Restore infrastructure. Villages should organize the masses to repair damaged facilities, roads and lines and restore them in time.
(6) Do a good job in production self-help. We will fully implement the assistance measures, organize the masses to resume production, and guide farmers to take remedial measures for production.
Fourth, disaster collection and reporting.
The village (neighborhood) committees and departments should determine an information collector, implement the duty system, and smooth the information channels. After the disaster is discovered, all villages and departments should organize personnel to investigate, count and summarize the disaster losses in time while doing a good job in emergency rescue and disaster relief, and report them to the township government. For major disasters, the government should organize personnel to go deep into the disaster area to verify the situation, summarize it in time and report it to the relevant departments at the county level for disaster relief funds and material support.
Five, the conditions and time to start the plan
(1) Conditions for starting the plan. In case of serious disasters, this plan will be launched. The affected villages and units shall act in time in accordance with this plan to carry out disaster relief and emergency rescue.
(2) The planned start time. After receiving the disaster, all units in each village immediately report to the township government and determine the start time of the emergency plan for disaster relief according to the disaster level.
Emergency plan for flood fighting and emergency rescue 3 I. Scope of use
The emergency plan for inland river flood control is applicable to the emergency management and emergency rescue of inland river flood control in case of flood disaster within the county.
Second, organization.
In order to strengthen the emergency management of flood fighting and emergency rescue, our bureau has set up an emergency leading group and an emergency team for flood fighting and emergency rescue (see annex for the specific list). The leading group is located in the bureau and is fully responsible for the command of flood fighting and emergency rescue. The emergency team for flood fighting and emergency rescue is located in the construction section of the bureau, and is responsible for implementing specific flood fighting and emergency rescue measures under the command of the leading group.
Third, job responsibilities
1. Responsibilities of the leader of the leading group: obey the command of the emergency command center of the county government, implement the county emergency management procedures, and handle emergency accidents in strict accordance with the county flood control emergency plan; Fully responsible for the emergency handling of flood fighting and emergency rescue; Deploy emergency resources such as manpower, material resources and financial resources in the bureau system; Organize flood emergency accident analysis; Responsible for contact and coordination outside the system.
2. Responsibilities of the Director of the Office of the Leading Group: Responsible for the leader of the emergency leading group; Responsible for the transmission of emergency orders, specifically directing flood fighting and emergency rescue work, and urging the implementation and execution of emergency management procedures; Responsible for the preparation, exercise and revision of the Bureau's emergency plan, organize the response and implementation of the Bureau's emergency plan, and guide all emergency teams to carry out specific flood fighting and rescue work; Participate in the analysis and research of flood emergency accidents.
3. Responsibilities of the leader of the emergency team: strictly follow the emergency plan for flood fighting and emergency rescue, implement emergency management procedures and deal with emergency accidents; Consciously participate in flood emergency management training, and put forward suggestions and measures to improve flood emergency plan; Responsible for organizing the investigation and analysis of flood emergency accidents, issuing accident reports, formulating corrective, preventive and improvement measures, and reporting to the leading group.
Four. Responsibilities of the emergency response team
The emergency group consists of logistics support group, emergency rescue group I and emergency rescue group II. The leader of each emergency group is responsible for directing the emergency rescue work of this group, and the leading group can make unified arrangements when necessary.
Responsibilities of logistics support group: contact 1 set 15t crane, 10t crane, 2 excavators and 4 trucks; Contact pipe (dn 100/65), carbon steel covered electrode, sandbags and 2 sets of common tools; Contact the on-site rescue team; Under the leadership of the leading group, be responsible for allocating all mechanical equipment and material resources in the bureau system at any time to ensure that the materials needed for flood fighting and emergency rescue are in place on time and with good quality.
First aid responsibilities: prepare 10t cranes, excavators and trucks; Prepare 20 emergency personnel; Contains 2 sets of commonly used tools; Be ready for emergency rescue at any time; When personnel and materials are insufficient, allocate them to the leading group; Go all out to do the rescue work.
Responsibilities of the second rescue team: prepare a 10t crane, an excavator and a truck; Prepare 20 emergency personnel; Contains 2 sets of commonly used tools; Be ready for emergency rescue at any time; When personnel and materials are insufficient, allocate them to the leading group; Go all out to do the rescue work.
Verb (abbreviation of verb) accident handling procedure
1, before the flood season comes, the leading group should organize all emergency teams to conduct a preliminary investigation on the manpower, material resources and financial resources preparation for flood fighting and emergency rescue. All emergency teams should also conduct pre-investigation on the regional flood control capacity within their responsibilities, and report the problems to the bureau leading group in time. The leading group should effectively solve the problems found in the preliminary investigation.
2. After receiving the flood control instruction from the county government, the leading group shall immediately start this emergency plan and transmit the information to the members of the leading group and the leader of the emergency group.
3, leading group members, emergency team leader, should immediately take your positions, and keep 24-hour communication. Bureau departments, subordinate units, engineering leading group of all kinds of mechanical operators should also keep 24-hour communication, stand by at any time.
4. After receiving the instruction from the leading group, each emergency team leader should immediately organize emergency resources such as manpower and material resources to rush to the scene for command, and at the same time pull up the cordon to prevent relevant personnel from entering the scene. The leading group should also organize relevant personnel to rush to the scene to assist in the command, and the group leader should leave it to the bureau leaders for command.
5, in the process of flood fighting and emergency rescue, should pay close attention to the development of danger, abnormal situation should immediately organize rescue personnel to evacuate, and notify the emergency response leading group.
6. During the on-site flood fighting and emergency rescue, the leader of the emergency team should report the on-site situation to the leading group every 30 minutes.
7, there is no rescue team, to do a good job of 24-hour patrol in the area of responsibility, found that the situation should immediately report to the leading group. At the same time, prepare for emergency rescue work and be at the disposal of the leading group at any time.
8. After the on-site flood fighting and emergency rescue, the emergency team leader should count the on-site emergency rescue personnel and clean up the site at the same time.
9. After the flood fighting and emergency rescue, the leading group should organize the analysis and summary of the accident, formulate rectification, prevention and improvement measures, and review the flood control capacity of each region at the same time to effectively eliminate hidden dangers.
Six, flood prevention emergency plan training and drills
1. The leading group is responsible for organizing the training of flood control emergency plan, and organizing the personnel of this system to participate in the training according to the approved flood control emergency plan.
2, flood control emergency plan drill once a year. Emergency headquarters's office is responsible for the implementation of the exercise plan. After the drill, analyze and summarize the drill, put forward improvement plans and plans, and continuously improve the emergency response capability.
The fourth plan for flood fighting and emergency rescue is to thoroughly implement the Flood Control Law of People's Republic of China (PRC) and the Flood Control Regulations of People's Republic of China (PRC), aiming at flood control and drought relief, seizing major risks and saving major disasters. Xx Town should be deployed early, fully implement the flood control responsibility system, and ensure the safety of people's lives and property. This plan is formulated according to the spirit of relevant documents from higher authorities and the reality of our town.
I. Working principles
(a) adhere to the principle of "safety first, constant vigilance, prevention first, combination of prevention and resistance".
(2) Adhere to the principle of "adapting measures to local conditions, combining specialized groups, highlighting key points, giving consideration to the overall situation, and subordinating local interests to the overall interests".
Second, the organization and responsibilities
(1) organization: set up the flood control and emergency rescue headquarters of xx town as a permanent leading organization to lead the flood control and emergency rescue work of the whole town in a unified way. Party Secretary xx is the political commissar, Mayor xx is the commander, other team members are the deputy commanders, and leaders of civil affairs, central schools, police stations, judicial offices, water conservancy stations, hospitals, tax offices, fire brigades and administrative groups are members. There is an office in the emergency headquarters. The director of the office is concurrently appointed by xx, deputy secretary of the Party Committee.
Under the leadership of the commander-in-chief, the flood control and emergency rescue headquarters shall study, decide and deploy the emergency handling of major dangers in flood season, and the deputy commander-in-chief and members shall be responsible for the emergency handling of related dangers according to the division of business. The director of the office assists emergency headquarters's commander-in-chief and deputy commander-in-chief in handling related work.
(II) Duties: The headquarters is responsible for leading and organizing the flood control and drought relief work in the whole town, guiding all towns and villages under its jurisdiction to set up flood control and drought relief institutions headed by the main responsible persons, and arranging 1-2 liaison officers for flood control and drought relief. Grasp the water situation, drought and disaster situation of the whole town in time, organize the implementation of flood control and drought relief measures, coordinate and solve the problems of flood control funds and materials, and organize the aftermath and reconstruction work.
(3) Team configuration: establish two-level flood control emergency teams in villages and towns, with 30-50 emergency teams in each village 1 flood control liaison. The emergency rescue team mainly completes urgent, difficult, dangerous and heavy rescue tasks; Village-level rescue teams mainly provide labor for rescue and complete rescue tasks, and have low requirements for rescue technology and equipment. The emergency team is always on standby, and in case of danger, it is always on standby.
Three. Prevention, early warning and monitoring mechanism
(1) prevention and early warning information: actively connect with meteorological departments to strengthen the monitoring and forecasting of disastrous weather in the jurisdiction. When it is predicted that serious flood and drought disasters will occur soon, the town flood control headquarters should directly inform all towns and villages in advance to make relevant preparations. After the flood disaster, the town flood control headquarters should report the flood disaster to the county flood control headquarters in time, and organize forces to carry out emergency rescue and disaster relief.
(2) Inspection and observation: After the flood, members and cadres of flood control departments at all levels should pay close attention to the water and rain conditions. Once there is a sudden rainstorm, the sound of rain is the command, and flood control organizations and personnel at all levels should be in place immediately. Adhere to the 24-hour patrol system, and arrange 3 people to patrol the main river sections every kilometer. Once the danger is found, report to the surrounding people immediately to realize rapid transfer and report to the county flood control headquarters in order to organize disaster relief in time.
(3) Work before flood
1, the town flood control headquarters organized cadres and the masses to clean up obstacles and impurities in the river.
2. Each command point should organize personnel to carry out dragnet patrol, register and report the found danger in time, and insert signs in dangerous places such as loose flooding.
3, culvert steep slope and dangerous area to arrange someone to guard.
4. Each command point should actively take measures such as unblocking to deal with phenomena that may lead to danger within its jurisdiction.
5, villages patrol, basic rescue team is ready, and set up a backup rescue team according to each village 50 people.
Fourth, the flood control plan
After entering the flood season, flood control personnel will arrive at their posts in time, and all township units should pay close attention to the danger levels and meteorological trends released by relevant departments and do a good job in prevention.
(a) after the flood, the town and village cadres should rush to the scene at the first time, and after confirming the danger, organize and mobilize flood control teams at all levels to carry out emergency rescue. At the same time, report the situation of the dangerous scene to the relevant departments and leaders in time. It should be noted that in order to reduce unnecessary casualties, the elderly, children, pregnant women and people with diseases are not allowed to participate in on-site rescue.
(two) the town flood control headquarters office received a dangerous accident report, the personnel on duty should immediately report to the leaders on duty; Second, we should inform relevant personnel to immediately organize personnel to go to the scene for rescue. At the same time, do a good job in emergency preparation, recording, coordination and communication.
(3) Relevant leaders and leaders on duty should immediately rush to the office of the flood control headquarters after receiving the water situation report, put forward an emergency treatment plan according to the on-site report, and organize personnel to implement it.
(4) The office of the town flood control headquarters shall report the water situation to the relevant departments and units of the town government according to the instructions of the leaders of the town government and the flood control headquarters, requiring them to make emergency preparations and take corresponding preventive measures.
(5) After confirming the situation at the scene, the leaders on duty of the town flood control headquarters have the right to call the flood control personnel, vehicles, equipment and instruments in the towns directly under the scene.
(6) According to the development of flood, if it is likely to cause major disasters, a flood control field rescue headquarters should be established in time, and the political commissar or commander-in-chief of the headquarters will hold an emergency meeting of the flood control headquarters, office staff and relevant members, put forward a disposal plan, and organize the implementation of rescue work. The relevant units and personnel shall obey the command.
(seven) the flood area is large and the losses are serious. After the disaster occurs, the office of the town flood control headquarters shall immediately organize relevant personnel to go to the scene for investigation and submit a detailed investigation report to the municipal flood control headquarters. At the same time, organize relevant departments to do a good job in the aftermath of disaster areas, such as living supply, health and epidemic prevention, disaster relief materials supply, public security management, school resumption, water damage repair, resumption of production, and reconstruction of homes.
Five, flood control materials reserve, management and transfer system
(a) to implement the policy of "safety first, always standing, prevention first, all-out rescue", and the flood control and rescue materials are reserved by the town flood control and drought relief office.
(2) Urban flood control refers to the varieties of flood control materials, including woven bags, sacks, shovels, raincoats, rain boots, pumps, cement and sand.
(III) Flood control and drought relief materials must be "earmarked" and uniformly dispatched by the town headquarters. They can be used only after being approved by the town flood control and drought relief office, and no department or individual may misappropriate them.
(four) the call of reserve materials, adhere to the following principles. (1) "Near first, then far away", the flood control reserve materials closest to the flood control and emergency rescue site shall be called first; (2) "Meet the urgent need", that is, when there are multiple applications for transferring flood control reserve materials, if they cannot be met at the same time, the units in urgent need will be met first; (3) "First priority, then priority", when there are multiple applications for transferring flood control reserve materials, which cannot be met at the same time, the emergency rescue of key flood control areas and major flood control projects should be met first.
(five) before the flood season, the town flood control office should be responsible for organizing personnel to conduct a comprehensive inspection of the management of flood control materials and equipment reserves.
Six, flood control and drought relief headquarters member units work responsibilities
(a) the town government office. Coordinate the relationship between the flood control headquarters and government departments, prepare for the convening of flood control work conferences and relevant flood control work within the jurisdiction that needs government coordination, and commend advanced flood control and disaster relief.
(2) Town Armed Forces Department. Obey the flood control command and do a good job in military-civilian joint defense. Be prepared in manpower, material resources and financial resources, and put into disaster relief work at any time according to the needs of local flood control and disaster relief.
(3) Water conservancy stations. It is necessary to do a good job in flood control throughout the year, strengthen the construction of water conservancy facilities, manage them according to law, do a good job in engineering reinforcement and river dredging, and ensure high efficiency and safety in flood season. Organize the safety inspection of water conservancy projects before the flood season, summarize and report the disaster situation in time after the disaster, and organize the repair of water-damaged projects.
(4) Civil Affairs Office. Under the leadership of the superior and the government at the same level, do a good job in housing investigation in dangerous buildings and dangerous areas, and help local organizations to strengthen maintenance or plan relocation. Organize disaster relief funds and materials after the disaster, resume production in a planned and step-by-step manner, and rebuild their homes.
(5) Agricultural office. Responsible for the rescue work of affected crops and technical guidance for self-help and recovery of agricultural production after the disaster.
(6) Police station: responsible for the management of public security and traffic order at the rescue site.
(7) hospitals. During the flood season, do a good job in the supply of medical materials and medicines in flood control areas, and organize medical teams to go to disaster areas to strengthen epidemic monitoring to prevent the outbreak.
(8) OFTA: responsible for power security.
(9) Fire brigade: responsible for the prevention of other secondary disasters in flood season.
(10) Central school: responsible for the safety, evacuation and transfer of students in middle schools, primary schools and kindergartens.
(1 1) village. The secretary of the village party branch is the direct leader who guides and organizes cadres and the masses to invest in flood control work, and is also the first responsible person. It is necessary to firmly establish the concept of "no small matter in flood control", stick to their posts, go deep into the front line, and do a good job in flood control with due diligence.
Seven, flood control duty system
(a) on duty in flood season, must be on duty 24 hours a day, in case of abnormal weather forecast in non-flood season, the flood control office will arrange temporary duty in time.
(two) the personnel on duty must stick to their posts and shall not leave without authorization.
(3) The personnel on duty shall record the information in detail. The contents include calling company, name, call content, time, etc. After the things that need to be handled for instructions are done, the handling situation should be recorded and signed by the personnel on duty.
(4) Listen to and record the weather forecast on time. When the Meteorological Observatory issues a rainstorm warning, it shall report to the leaders of the Flood Control Office.
(five) to do a good job of succession, accurately record the important situation, results and problems left over.
VIII. Reward and accountability
The model workers, advanced collectives and individuals who have made outstanding contributions in flood control and drought relief work shall be commended by the Town People's Government and recommended to the superior; If losses are caused by dereliction of duty in flood control work, the parties concerned shall be investigated and punished according to the Flood Control Law of People's Republic of China (PRC), the Flood Control Regulations of People's Republic of China (PRC) and the Civil Service Law. If the case constitutes a crime, criminal responsibility shall be investigated according to law.
Emergency plan for flood fighting and emergency rescue. Give full play to the positive role of grass-roots militia organizations in flood control and disaster relief, and effectively deal with all kinds of emergencies. This plan is formulated according to the spirit of instructions from higher authorities and the reality of our town.
I. Guiding ideology
Respond to sudden floods, actively invest in emergency rescue and disaster relief, ensure the safety of people's lives and property, escort the healthy development of the town's economic and social undertakings, ensure that it can be pulled out and played loudly, resolutely complete all kinds of urgent and dangerous tasks of flood control and disaster relief, strive to reduce disaster losses, and actively play the assault role of militia in flood control and disaster relief.
Second, organize and lead.
The town has set up a flood control headquarters, with Huang Haiqing, Minister of Armed Forces, as the general commander, and members including Chen Mingchuan, Cao Xin, Yang Li, He Hongyang and Liang Youjun. The headquarters office is located in the town people's armed forces department, which is mainly responsible for handling the assault work during flood control and emergency rescue.
Third, the composition of power and the division of tasks
With the town's backbone militia as the backbone, the town's People's Armed Forces Department has set up an emergency platoon for flood control and emergency rescue headed by Chen Mingchuan, and 36 backbone militia emergency detachments headed by militia battalion commanders have been set up in villages (communities). According to the occurrence of disasters and the needs of tasks, all militiamen are organized in time to invest in emergency rescue and relief work.
Emergency platoon personnel should have the qualities of political qualification, military competence, strict discipline and excellent style of work, carry forward the spirit of continuous fighting, be hardworking and brave in dedication, and be able to complete tasks independently. The emergency platoon has 36 people. Chen Mingchuan, Vice Minister, served as the platoon leader, with 6 students in each class, and the captains of Jiangzhi Community, Jiulinggang Village, Shijiaba Village, Gao Feng Village, Zhenlongmiao Village and Lighthouse Village Barracks served as the squad leaders. At the same time, according to the disaster situation in the whole town, cooperate with the flood prevention and rescue teams in various villages, fight together and resolutely complete the task.
Under the unified leadership of the town party Committee and government, the leading group for flood fighting, emergency rescue and disaster relief is responsible for mastering the overall situation of flood fighting and dealing with disasters caused by earthquakes and floods; Responsible for checking the implementation of flood fighting and emergency rescue work in village (community) militia camps; To be responsible for commanding and coordinating the emergency rescue and disaster relief operations of various militia organizations. Under the command of the town leading group for flood fighting and emergency rescue, the on-site command group is mainly responsible for the on-site command and coordination of militia emergency rescue and disaster relief; Responsible for the implementation of communications, vehicles, medical care, living and other security measures required for emergency rescue and disaster relief; Assist villages to do a good job in propaganda and education of militia ideological and political work, policy discipline and emergency rescue and disaster relief safety, and pay attention to discovering and publicizing typical cases. Chen Mingchuan and Serina Liu are responsible for the self-rescue work of the town government compound. When necessary, with the consent of the town party committee and government, the personnel of the militia emergency detachment can be used.
Fourth, all kinds of guarantees
(1) communication. Orders or notices from the headquarters are mainly telephone contact or manned motorcycles, and walkie-talkies are used when performing tasks.
(2) Transportation. A car from the town authorities, a car sent by the police station and the health center, stood by at the designated place.
(3) life. Provided by the town government canteen.
(4) ambulance. The town health center sent capable medical staff, carrying first-aid drugs and equipment, to act with the team.
Verb (abbreviation for verb) requires
(a) before the flood season, strengthen education and improve the strategic concept. Extensively carry out patriotic education, enhance national defense awareness, give priority to flood control and emergency rescue work, enhance the sense of responsibility and mission, and resolutely fight at the call of the moment.
(two) the implementation of personnel, do a good job in the exercise. In view of the current flood control and emergency rescue situation, organize emergency rescue personnel. The village (community) militia battalion commander should implement the emergency detachment personnel to the specific person in charge. Combined with the situation in the town, according to the plan, according to the field, according to the facts, carry out actual combat drills and exercise the team.
(three) to strengthen contact with the higher flood control headquarters, pay attention to the dynamic situation at any time, recognize the grim situation, communicate with the water conservancy department, strengthen cooperation, and ensure regional security.
(4) Prepare sufficient flood control materials, ensure vehicle transportation and win the battle of flood control and emergency rescue at any time.
Emergency plan for flood fighting and emergency rescue 6 I. The purpose of making this plan
In order to ensure the safety of school property and teachers' and students' lives during the flood season, based on the prevention of major floods and disasters, and to ensure that serious accidents do not occur, this plan is formulated according to the relevant laws and policies of provinces, cities and counties and the actual situation of our school.
Second, the scope of application
This plan is suitable for flood fighting and emergency rescue in our school.
Third, organization
(1) Leading Group
In order to strengthen the leadership of flood fighting and emergency rescue, the school set up a leading group for flood fighting and emergency rescue, with comrades as the team leader, comrades as the deputy team leader and comrades as members. There is an office under the leading group, which is mainly responsible for handling daily affairs in flood season, coordinating departmental relations, uploading and issuing leadership instructions, and so on. Tang Yong is also the director of the office.
(2) Emergency Working Group
The school has set up an emergency working group for flood fighting and emergency rescue, with the team leader and deputy team leader, whose duties are: to be specifically responsible for pre-disaster warning, disaster reporting, disaster dynamic analysis and so on. The responsibilities of the emergency working group are as follows:
(3) Flood fighting and rescue teams
The school has set up a flood fighting and rescue team, with team leader, deputy team leader and members.
(4) Logistics Support Group
The school set up a logistics support team for flood fighting and emergency rescue, with Comrade Zhang Xingde as the team leader and Wang Zhiyong and Tang Yong as members. Its main duties are: to provide all kinds of flood fighting and emergency materials (including emergency vehicles, equipment, materials, living services, medical security, etc.). ) to ensure the smooth progress of flood fighting and emergency rescue work.
Article 4 Division of responsibilities
(a) the leading group for flood fighting and rescue under the unified leadership of the Education Bureau, listen to the unified command of the county and town flood control headquarters, and work closely with relevant departments to be responsible for the school's flood fighting and rescue work.
(2) The school flood rescue team is responsible for implementing emergency rescue when the school is affected. During the flood season, rescue team members ensure smooth communication 24 hours a day, so as to achieve unified command and militarized action. They are always ready to listen to the command and go out at the command.
Article 5 The headmaster of a school is the first responsible person for flood fighting and emergency rescue. Once the disaster happens in the school, it must be reported to the office of the leading group of the bureau at the first time, and the personnel of the school emergency working group and the flood fighting and rescue team rushed to the front line to carry out rescue at the first time to ensure the safety during the flood season.
Article 6 If there are no special changes in this plan, it will serve as the basis for long-term flood control and emergency rescue work.
;