4.2 Preparation of implementation period and evaluation form. When applying for equipment evaluation, the department's job is to make an equipment evaluation form (style-1) on the premise of asking for instructions for specifying equipment and machines. 1, in each application period, time-consuming work, in order to avoid omission, data should be generated at the same time. 2. In the case of a single price (1~3), only the equipment evaluation table is needed. 3. Necessary information and evaluation table ① Drawings of installation locations of facilities and machines ② Style books and catalogues for distinguishing machine types.
4.3 Evaluation of more than two equipment departments (1) Evaluation of plural (more than four in the same facility) contents of experimental engineering, production engineering and other projects. Make the pre-evaluation table for equipment evaluation (style -3) and discuss it with the environmental management department. (2) The Environmental Management Department shall guide the recording method of the equipment evaluation form and the materials to be provided, obtain the necessary information and implement the equipment evaluation.
4.4 Soil Pollution Prevention Law When the relevant soil pollution prevention law of Tokyo is promulgated, the department should make (equipment evaluation table) (style-1) (1) in the following order when abandoning and dismantling buildings and facilities. When the specific facilities are abandoned, the department head should discuss with the environmental management department and prepare the necessary information. (2) It may take 3 months to 1 year to sort out the land and go through relevant procedures when excavating other land, and the cost of land transformation will definitely increase. Be sure to discuss it in advance.
4.5 The introduction and reopening preparation of new equipment shall be evaluated in the preliminary evaluation of equipment concept or basic design. (1) The equipment evaluation form (style-1) shall be submitted to the Administration. When necessary, the preparation for the introduction of new regulations and the reopening of equipment shall be carried out after the acceptance of administrative license.
4.6 When Konica Minolta banned or restricted substances (prohibited substances such as chemicals) are introduced into the equipment using chemicals, the chemical management team will accept the judgment of the safety judgment meeting.
4.7 Equipment moving and dismantling (1) When the idea of equipment moving and dismantling was conceived, the dismantling method was solved. (2) Prepare for removal after the final evaluation decision. (3) With regard to the movement of equipment, the equipment moving department conducts equipment evaluation in advance, and moves the equipment after the declaration submitted to the government is judged necessary by the environmental management department. # Note: What equipment is used, such as refrigerator air conditioner, is really evaluated only after it is dismantled.
4.8 When the equipment stops and restarts, or when the restart problem is solved.
4.9 When the noise of repair and painting affects the surrounding neighbors, the method of solving the scheduled project of repair and painting of adjacent buildings shall be adopted.
5.0 The following items shall be carried out when assessing the heads of social departments.
5. 1 Introduce, modify, move, stop, reopen and remove new controlled equipment (1) Based on this benchmark, the heads of all social departments made 1 evaluation on whether the introduction, modification, move, stop and reopen of new controlled equipment had a significant impact on the environment.