Now more and more places need to use job responsibilities. Job responsibilities refer to the work content that a post needs to complete and the scope of responsibility that it should undertake. So what kind of job responsibilities are effective? The following are the job responsibilities of surveyors that I have compiled, hoping to help you.
Job responsibilities of surveyors. Under the leadership of the project manager, be responsible for the quality and measurement of the whole construction process.
2, in strict accordance with the quality requirements stipulated in the construction organization design, and according to the construction specifications and quality standards to do a good job of measurement control and testing.
3. Participate in the acceptance of raw materials, semi-finished products, finished products and various products.
4. Supervise the construction team to conduct quality self-inspection, and put forward rectification requirements in time for the problems found.
5, in the engineering construction, the quality problem of partial projects, can exercise the quality veto, supervision and rectification.
6. Be responsible for the self-inspection of construction machinery, materials, equipment, measurement and classification, and consumable materials during the whole project.
Surveyor 2 1 job responsibilities, independently complete indoor and outdoor work of traverse points and site construction lofting work.
2, responsible for the engineering survey of the construction project, to do a good job of measurement disclosure and project measurement review and acceptance.
3, make all kinds of measurement records, to ensure the accuracy of the construction pay-off and measurement requirements.
4. Complete the compilation of the data in the measurement page and save the measurement records.
6. Be responsible for project completion survey and compilation of completion data, including as-built drawings.
7. Responsible for the custody, inspection and annual inspection of measuring instruments.
8, complete other work assigned by the leadership.
Job responsibilities of surveyors. Study hard on technical knowledge and be familiar with various measurement techniques, rules and regulations, standards and regulations.
Two, do a good job in the area in charge of measurement standards and polite safety management, measures and information is complete.
Third, do a good job in all kinds of survey closure, elevation, coordinates, positioning, setting-out, angle, original data of traverse, data recording, statistics of survey results, drawing of survey map, etc. , and meet the construction requirements.
Four, do clear technical requirements, testing procedures, main problems, quality requirements, strengthen the quality management of measuring unreeling work, and implement the measurement review system.
5. Do a good job in sorting out survey results, drawing survey maps, collecting, sorting, submitting and keeping data. All data must be accurate, true and reliable.
Six, do a good job in the calibration of measuring instruments and equipment, as well as the maintenance, repair and storage of measuring instruments and equipment, tools and other equipment to ensure accurate and continuous good use.
Seven, responsible for guiding the measurement technology work of subcontractors, and solving difficult measuring points and turning points.
Eight, complete other work assigned by the project manager.
Job responsibilities of surveyors 4 1. Skillfully use surveying and mapping instruments such as level, total station and GPS, and skillfully use AutoCAD related drawing software.
2. Understand the design intent before measurement, and study and check the drawings; Understand the construction deployment, and make the survey and setting-out plan.
3. In conjunction with the construction unit, the survey control points shall be calibrated on site to accurately measure the elevation.
4. Cooperate closely with the design and construction, make full preparations in advance, and formulate a feasible survey and setting-out scheme synchronized with the construction.
5. Do a good job of setting-out and line inspection in all stages and main parts of the whole construction, and strengthen the audit of measuring and setting-out scheme and the guidance and inspection of measuring and setting-out.
6, line inspection work should start from the audit of measuring unreeling scheme, before the construction of each professional stage, put forward preventive requirements for measuring unreeling work.
7, responsible for vertical observation, settlement observation, and record the observation results (data and curve).
8, responsible for timely sorting out and improving the baseline review, measurement records and other measurement data.
Responsibility of surveyor 5 1. Carry out the measurement work in strict accordance with the detailed rules for the implementation of the measurement work, and carefully check it to prevent measurement accidents and ensure the measurement accuracy.
Second, seriously implement the precautions for the use of measuring instruments, establish accounting for measuring instruments, strengthen the maintenance, use and self-inspection of instruments, prevent the damage of instruments, conduct self-inspection on the instruments used regularly, and properly keep self-inspection records.
Three, responsible for the formulation of the project measurement scheme and the implementation of measurement and measurement management measures.
Four, responsible for the handover pile survey before construction, the formation of measurement results, the layout of control network during construction, construction lofting, disclosure of measurement technical data, etc. , to ensure the normal construction of the project.
Five, responsible for the through measurement, completion handover measurement, etc. Correct the survey deviation in construction and participate in the analysis of survey accidents.
Six, responsible for sorting out the original measurement records, compiling the information in the industry, saving the measurement records, and performing the procedures of signing and changing hands for review.
Seven, complete other tasks not listed in the survey.
Job responsibilities of surveyor 6 Job responsibilities:
1, using various measuring instruments and software, and calculating and drawing by professional measuring software;
2. Conduct outdoor surveying and mapping according to the outdoor operation process;
3, the use of professional knowledge for engineering construction survey and other engineering survey, in strict accordance with the detailed rules for the implementation of the survey work, to avoid measurement accidents, to ensure the accuracy of the survey;
4. Analyze the measurement data, evaluate the measurement results, and prepare the analysis report;
5. Be responsible for the technical supervision and management of the surveying specialty of the engineering construction unit;
6. Responsible for the weekly inspection and maintenance of measuring instruments, equipment and facilities.
Qualifications:
1, major in engineering survey or civil engineering;
More than 2.3 years working experience in field survey, and those with surveying and mapping qualification certificate are preferred;
3. Proficient in surveying and mapping engineering;
4, familiar with the use of theodolite, total station, level and other related measuring instruments, skilled use of South cass, autocad.
5. Familiar with engineering survey and construction business processes, with strong engineering survey skills;
6. Being in good health, able to adapt to working abroad for a long time, and hard-working;
7. Good communication and coordination skills, honest and steady, and strong sense of responsibility.
Job responsibilities of surveyors 7 1, check the drawings, understand the construction deployment, and formulate the survey and setting-out plan;
2, responsible for the positioning of the project pay-off. When measuring the plane position and elevation of pay-off buildings and structures, make original records and relevant construction measurement records;
3, division, unit project acceptance to do a good job of preview, assist technical director to do a good job of drawing the project completion figure;
4, daily inspection of measuring instruments, and is responsible for the annual inspection, make all kinds of measurement records, to ensure the accuracy of construction pay-off.
5, complete other work assigned by the leadership.
Responsibilities of Surveyor 8 Engineering survey is the work of measuring the plane position and elevation of the whole project, which plays a macro-control role in the whole project. It runs through the whole project construction process and is a very important work in the project construction. In order to do a good job in engineering survey, surveyors should perform the following duties:
First, adhere to the work style of seeking truth from facts, being serious and responsible, and being meticulous.
Two, learn all kinds of measurement techniques, rules and regulations, standards and regulations.
Third, understand the design intent before measurement, and learn and check the drawings; Understand the construction deployment, and make the survey and setting-out plan.
Four, in conjunction with the construction unit, supervision unit of red line pile survey control points on-site calibration (elevation and coordinates), traverse survey.
Five, in accordance with the provisions of the time to send the measuring instruments to the authoritative testing department for inspection and calibration.
Six, closely cooperate with the construction, make full preparations in advance, and formulate a feasible survey and setting-out plan synchronized with the construction.
Seven, in all stages of the whole construction and the main parts of the pay-off, line inspection work, as well as review the survey pay-off scheme and check the survey pay-off work and other aspects to strengthen the work, to avoid mistakes and rework.
Eight, the line inspection work should be active, and the line inspection work should start from the audit of the measuring and setting-out plan. Before the construction of each professional stage, preventive requirements should be put forward for measuring and setting out, so as to nip in the bud.
Nine, do a good job of checking the leveling points and accurately set the elevation.
Ten, do a good job of building settlement and displacement observation, record the observation results (form written data and curves and charts).
Eleven, do a good job of sorting out the measurement results; Surveying and mapping maps; Collection, collation, submission and storage of survey data. , to ensure the accuracy of all data.
Twelve, do a good job in the maintenance, maintenance, repair and storage of measuring instruments, and establish an instrument ledger.
Job responsibilities of surveyors 9 1. Actively participate in various measurement activities and technical exchange activities organized by the project department.
2, earnestly do a good job in the field of measuring unreeling, strictly implement the system of self-inspection. After the completion of self-inspection, report to the supervisor in time as required, and be responsible for completing the measurement handover of adjacent processes.
3. Take all kinds of survey control points and signs delivered by the project department, and earnestly do all kinds of protection work.
4, strictly abide by the rules and regulations stipulated by the project department.
5, the courage to implement the national surveying and mapping industry laws and regulations and various engineering construction management regulations.
6. Carefully prepare the survey data in the industry, sort out the survey data according to the progress of the project, and complete the compilation of the completed survey data.
7, take good care of measuring instruments, do a good job of instrument maintenance, regular inspection and calibration, to ensure that the instrument is in good condition and accurate, to ensure normal work.
Job responsibilities of surveyors 10 1. The surveyor is led by the technical person in charge of the project and works under the guidance of the superior business department. They should study hard, be familiar with construction drawings, and enhance their ability of reading, examining and drawing.
2. Be responsible for the layout of building control piles and leveling points, and master different engineering types, different construction methods and different requirements for measuring and setting out.
3, responsible for the control line measurement and elevation transmission in the process of construction, supervision and inspection, calculation and inspection of various geometric shapes, data and points.
4. Understand the error theory, be able to take measures against the causes of errors, and the ability to observe various data.
5, according to different scenarios, comprehensive analysis of the ability to deal with problems.
6. Please collect and keep all measuring instruments, understand the structure and principle of the instruments, master the skills of instrument use, calibration and maintenance, and ensure that the instruments are in good working condition.
7, understand the type of work safety, technical operation procedures, construction acceptance and quality evaluation standards, fill in the preview report, declaration form and take cover engineering data printing, storage.
8, responsible for measuring unreeling and implementation plan.
9, at any time to report to the technical director measuring unreeling site and check the problem, do a good job.
Job responsibilities of surveyors 1 1 1. Assist in technical research and development of various departments of the company.
2. Obey the temporary work arrangement of engineers at all levels.
3. According to the requirements of the inspection instruction, the experimental facilities such as seat fixtures can be correctly connected to the test bench.
4. Short-term business trip to provide technical support for on-site project implementation.
5. Participate in the installation, debugging, acceptance and maintenance of test equipment.
6. Be responsible for the identification transfer of inspection samples, warehousing and destruction of samples after inspection.
7. Complete the daily inspection and maintenance of equipment fixture on time, and make records.
8. Independently undertake the design of special measuring plane.
9, ZunZhangShouJi, pay attention to safety, accident report in time.
10. Complete the dimension measurement of internal seats and other parts according to the inspection instruction and entrustment.
Responsibilities of surveyor: 12 1. Responsible for the completion of project handover and installation, receiving and protecting measuring piles.
2. Be responsible for preparing the measurement scheme, reporting it to the relevant departments for examination and approval, organizing its implementation at the construction site, and making measurement records.
3. The measurement content implemented on site shall be disclosed to the builder and superior leaders in written form, and the measurement marks shall be protected during the construction.
4. Responsible for the measurement review of each working procedure, and organize the implementation of project completion measurement.
Duties of surveyor: 13 1. Conscientiously implement the national and ministerial survey specifications, and be responsible for the construction survey control and daily survey work of this project.
2. The measured data and original records shall be authentic, clear and accurate, so as to provide accurate data for construction.
3, can independently or jointly complete the engineering control network survey work, adhere to the survey retest system. All levels of control measurement must be carried out in strict accordance with the relevant specifications, and the measurement and calculation results are put forward.
4, according to the site construction situation, provide the purchasing plan of measuring instruments to the materials department.
5. The measured data and original records shall be bound into a book in time, numbered and filed.
6, earnestly do a good job in the maintenance and custody of measuring instruments, regular calibration, to ensure the accuracy of measuring instruments.
7, adhere to the system of self-inspection and mutual inspection of measurement work, put an end to the occurrence of major quality accidents.
8. Regularly check and maintain the position of control piles to prevent damage and movement.
9. Check the control piles (points) during construction, and survey and correct them in time if any abnormality is found. Before pouring concrete, provide axis inspection points and elevation control points, and make measurement data in time.
Job responsibilities of surveyors 14 1. Surveyors are directly responsible for engineering construction survey;
2. Strictly implement various construction specifications and quality inspection and evaluation standards promulgated by the state;
3. Before measurement, be sure to be familiar with the drawings carefully, make clear the measurement requirements of each part, and calibrate the measuring instrument. You can only measure if the measuring instrument meets the requirements;
4, accurate layout of municipal road construction pipe network engineering, meet the construction requirements;
5. Strictly implement the technical disclosure of construction survey, conscientiously do a good job in construction survey and retest of each process to ensure the construction progress and measurement quality;
6, carefully keep the measuring instruments, and regularly check and submit the measuring instruments to ensure the accuracy of the instruments.
Job responsibilities of surveyor 15 1. Actively implement the national surveying and mapping industry regulations, rules and regulations on the management of various projects.
Second, strictly abide by the rules and regulations stipulated by the project department.
Three. Actively participate in various measurement activities and technical exchange activities organized by the project department.
Four, take good care of measuring instruments, do a good job of instrument maintenance, regular inspection and calibration, to ensure that the instrument is accurate and in good condition, to ensure normal work.
Five, to undertake all kinds of survey control points and signs delivered by the project department, and do a good job of protection.
Six, earnestly do a good job in the field of measuring unreeling, strictly implement the system of self-inspection. After the completion of self-inspection, report to the supervisor in time as required, and be responsible for completing the measurement handover of adjacent processes.
Seven, conscientiously do a good job in the industry survey data, and according to the progress of the survey data, complete the compilation of completion survey data.
;