I have some experience in team building and expanding coordination. During this period, I created a small laboratory for the company, from the demand design of laboratory test instruments to the wiring of the laboratory and then to the purchase of equipment.
Reason for leaving: Limited room for upward development.
* * Company (20xx-0x ~ 20xx-0x)
Company nature: foreign-funded enterprises industry category: computer hardware
Position: Test Engineer Job Category: Hardware Tester
Job description: During this period, I was mainly responsible for the company's initial reliability test (IRT), which was a testing department that had to be set up according to the special requirements of NEC customers, mainly to conduct some simulated end-user tests on the alignment system before leaving the factory and also to test the quasi-system before mass production to determine whether it can be mass-produced. I am mainly responsible for eliminating some bad phenomena encountered in the test line every day, ensuring the normal test, arranging the test items of testers and communicating with customers every day. During my one-year stay in Ensmai, I successfully took charge of the IRT test of nine trial-produced models, and made necessary preparations for the mass production of these models. At the same time, it is also responsible for communication with other relevant departments.