Construction site of cement pavement maintenance king
Cement pavement repair king has the characteristics of firm bonding, high strength, frost resistance and corrosion resistance. Repair the damaged pavement with 6mm, and the heavy vehicles will not crack or peel off after rolling. In addition, the use method of this material is very simple, and it can be mixed with water to form mortar, which is poured on the ground to be repaired to seal the surface. Cement pavement repair has a short setting time and can be opened to traffic in 2 hours after repairing damaged pavement, which is very suitable for large-scale maintenance of damaged pavement.