Advanced Group (existing subway, expanding):
Beijing, Tianjin, Shanghai, Guangzhou, Taipei and Hong Kong
Beijing: The first subway in China, 1969, 10, and the first phase of Beijing subway project was put into trial operation. The existing subway 1 line, ring line and Fuba line, with a total length of 54 kilometers, have all been put into operation. It is planned that the total length of subway network will reach 408 kilometers in the future.
Hong Kong: Metro 1979 opened, with 3 lines and a total length of 43.2 kilometers. Starting from 1994, the annual profit is over HK$ 65,438 billion.
Tianjin:1984 65438+opened to traffic in February, with a total length of 7.4 kilometers. On October 9th, 20065438+0 65438+/KLOC-0, the whole line was shut down to prepare for the upcoming subway 1. The subway 1 line has a total length of 26. 195 kilometers, with a total investment of about 6.9 billion yuan. It is expected to be completed by the end of 2005.
Shanghai: Metro 1 Line1995 was opened to traffic in April. At present, three subway lines have been put into operation, and the total mileage of existing rail transit is 65 kilometers. According to the new round of urban planning, Shanghai plans to build a subway with a length of 1 1 384 kilometers and a light rail line with a length of 186 kilometers, with an average annual construction of 15-20 kilometers, which requires an investment of 100 billion yuan.
Guangzhou: The full-length 18.48km subway 1 line was opened to traffic on June 28th, and the full-length 23km subway line 2 is expected to open to traffic at the end of 2003. Line 3 is expected to be completed in 2005; Line 4 and Line 5 are also under planning. In 2065,438+00, five lines with a total length of nearly 65,438+030 kilometers will form the Guangzhou rail transit network. Taipei: 1988 started, and 1995 basically completed the trial operation. Five subway lines are planned, with a total length of 73. 1 km and 70 stations.
Xinxing Group [approved by the State Council and the State Planning Commission]:
Shenzhen, Nanjing, Qingdao, Chongqing, Shenyang
Shenzhen: The main line of the first-phase subway project is19.468km, with a total investment of105.85 million yuan and a construction period of 4 years. In the next nine years, Shenzhen will invest 32.8 billion RMB to build rail transit with a length of over 120 km.
Nanjing: The first phase of the North-South subway line was officially started in June 5438+February 65438+February 2000. It is the project with the highest level of localization and the lowest average cost in China. The estimated investment of the project is 700150,000 yuan, the comprehensive cost is 4150,000 yuan/km, the comprehensive localization rate is 70%, and the total construction period is 4 years and 9 months.
Anxious Group [brewing, waiting for the approval of the State Council and the State Planning Commission]:
Chengdu, Zhengzhou, Wuhan, Dalian, Changchun, Harbin, Anshan, Foshan, Hangzhou, Urumqi, Suzhou, Xi, Lanzhou and Kunming.
Guangzhou-Nanhai-Foshan: Guangfo subway is expected to open in 2005-2006.
Chengdu: The estimated cost of Chengdu subway in the future is about 400 million yuan per kilometer.
References:
Qianhua. com 2002- 12-27