Xuzhou Metro refers to the urban rail transit system serving Xuzhou City, Jiangsu Province, China. Its first line was put into trial operation on September 28th, 2009+2065438, and it is the fifth city in Jiangsu Province to open the subway. There are three operating lines in Xuzhou Metro, namely, Xuzhou Metro 1 Line, Xuzhou Metro Line 2 and Xuzhou Metro Line 3 Phase I, with a total length of 63.7 kilometers and 54 stations, including 3 transfer stations.
As of July 2022, there are three lines under construction in Xuzhou Metro, namely, Phase II of Xuzhou Metro Line 3, Phase I of Xuzhou Metro Line 4 and Phase I of Xuzhou Metro Line 6, with a total length of about 54.7 kilometers. Passenger flow is mainly concentrated in Pengcheng Square, Xuzhou East Station, Xuzhou Station and Qingfeng Road.
Brief Introduction to the Background of Xuzhou Metro 1 Line
East-west direction of Xuzhou Metro 1 Line. Tongshan district Luwo Station in the west and Xuzhou East Station in jiawang district in the east. It passes through quanshan district, Gulou District and Yunlong District, covering the East-West Passenger Corridor of Xuzhou, connecting the important nodes such as Xuzhou Old Town, Bashan District and Chengdong New District in series, connecting commercial centers such as People's Square, Pengcheng Square, huaihai plaza and wanda plaza, and quickly connecting xuzhou station and Xuzhou East Station.
By the end of June, 2023, the total length of Xuzhou subway line will be 1.967 km, including 0.57 1 km for overhead line, 20.996 km for underground line and 0.4km; for ground transition section. Station 18, including elevated station 1 and underground station 17. The train adopts 6 B-type trains.
Reference to the above content: Baidu encyclopedia-Xuzhou subway